Job Recruitment Website - Zhaopincom - How to get into the railway bureau
How to get into the railway bureau
First, I found the recruitment conditions of a railway bureau:
1. Full-time college (higher vocational) or above personnel who are included in the national enrollment plan and have the qualification to dispatch.
2, good conduct, law-abiding, physical and mental health, love the railway industry.
3. The major studied during the school period is railway direction or the courses studied include railway professional courses, which meet the requirements of recruitment positions.
4. Obey the arrangement and adjustment of the post and work place of the unit, and be able to adapt to the working environment in different places and night shift work.
Second, the recruitment process is as follows:
1, register online.
2. Review the screening. According to the recruitment conditions, the railway bureau screens the applicants and determines the interview candidates in stages.
3. Interview evaluation. Candidates who receive the interview notice must attend the interview at the specified time and place, otherwise it will be regarded as giving up the application.
4. Disclosure of results. Publicize the recruitment results in China Railway Talent Recruitment Network, and go through the signing procedures after the expiration of the publicity period without objection.
Extended data:
workplace
Depot: used to manage stations and station staff. Generally, the first-class and special-class stations are directly under the jurisdiction of the depot, while the second-class and below stations are under the jurisdiction of the depot.
Locomotive Depot: Manage and maintain locomotives and locomotive drivers.
Works section: the management unit that reconstructs and maintains railway tracks and lines.
Telecommunication section: maintenance and management unit of railway power signal facilities.
Passenger transport section: railway passenger transport service unit. (command)
Depot: the maintenance and management unit of railway trains and rolling stock equipment.
Construction section: namely, railway real estate construction section, railway units, housing construction, heating and pipeline maintenance units in railway residential areas.
Power supply section: mainly responsible for electrified railway traction power supply, railway transportation signal power supply, railway area power supply, power equipment maintenance, etc.
Living section: railway logistics unit, which manages railway apartments and other living units.
- Previous article:How many positions can the People¡¯s Bank of China apply for?
- Next article:What is the pronunciation of Xiapu Xiapu?
- Related articles
- Changshu College Student Registration Entrance (Changshu Returned Personnel Information Registration)
- Is there an on-site interview at the China Unicom 20 18 Campus Recruitment Presentation?
- Where is the job fair in Wuhan this weekend?
- The prospect of hardware test engineer:
- Is Jiyuan Xiaolangdi Jeju International Hotel a private hotel?
- What is the secondary school affiliated to the Academy of Fine Arts of Hebei Normal University?
- What does headhunting big data mean?
- 2023 Nanyang neixiang county Institution Examination Interview Time
- Is there a great competitive pressure in the teacher recruitment examination in Beihu District of Chenzhou?
- How about Shenzhen Fuying Concrete Co., Ltd.?