Job Recruitment Website - Zhaopincom - Municipal qualification standard
Municipal qualification standard
1, enterprise assets
The net assets are more than 654.38 billion yuan.
2. Key personnel of the enterprise
(1) No less than 12 registered builders of municipal public works.
(2) The technical director has more than 10 years experience in technical management of engineering construction, and has the senior title of municipal engineering; There are not less than 30 people with intermediate or above titles in municipal engineering related majors, and the majors are complete.
(3) There shall be no less than 50 construction site managers with certificates, and the constructors, quality engineers, safety officers, mechanics, cost engineers, laborers and other personnel shall be complete.
(4) There shall be no less than 150 skilled workers at or above the intermediate level who have passed the examination or training.
3, enterprise engineering performance
In the past 10 years, he has undertaken the construction of four of the following seven categories, of which at least the projects listed in 1 are qualified.
(1) A total of more than 25 kilometers of urban trunk roads have been built; Or the cumulative construction of urban secondary roads above the road area of 6.5438+0.5 million square meters; Or the accumulated hard pavement area of the city square is more than 6,543,800 square meters;
(2) The accumulated urban bridge area exceeds 654.38+10,000 square meters; Or build three urban bridges with a single span of more than 40 meters;
(3) Accumulated construction of drainage pipes with a diameter greater than 1m (including a net width greater than 1m) for more than 20km; Or the cumulative construction of water supply and reclaimed water pipeline projects with a diameter of more than 0.6 meters for more than 20 kilometers; Or the cumulative construction of medium-pressure gas pipeline projects with a diameter of more than 0.3 meters for more than 20 kilometers; Or the cumulative construction of a thermal pipeline project with a diameter of more than 0.5 meters for more than 20 kilometers;
(4) Construction of two 80,000-ton/day sewage treatment plants or 65,438+10,000-ton/day water supply plants; Or build four feed pumping stations with a capacity of more than 200,000 tons/day and four drainage pumping stations with a capacity of more than 65,438+10,000 tons/day;
(5) Construction of two municipal solid waste treatment projects with a capacity of more than 500 tons/day;
(6) the cumulative construction of urban tunnel projects with a cross section of more than 20 square meters is more than 3 kilometers;
(7) Two municipal comprehensive projects with a single contract amount of more than 30 million yuan.
4. Technical equipment
Mechanical equipment with two of the following three items:
(1) 2 sets of asphalt concrete paving equipment with paving width exceeding 8m;
(2)/kloc-2 motor graders above 0/00 kw;
(3) 2 sets of pipe jacking equipment with a diameter of 1.2m or more.
- Previous article:How far is Guangxi Beiliu Yuxiang Factory from dengzhou city?
- Next article:What is the reputation of Wuhan Midwifery School?
- Related articles
- Xi health school address
- Work summary and plan in June
- How about Changzhi Zhicheng Road and Bridge Survey and Design Consulting Co., Ltd.?
- Hotel waiter recruitment market
- How much is the salary of Wugang Talent Development Center?
- Which platform is better for recruiting chefs?
- Notice Anping Convenience Network was officially renamed Anping Boling Network.
- Real questions for interviews in sports positions and public institutions
- Recruitment in Chinese circle
- What are the ways to study and work abroad?