How to accept Wuhan house decoration acceptance standards after house decoration is completed

Now that the new house is about to be decorated, can we move in directly? No, there is another important task that cannot be ignored, and that is the decoration acceptance! For the acceptance of new houses, it is not only to check whether the decoration details of the house are standardized, but also to visually see whether the decoration quality is good or not. So how to check and accept the house decoration after it is completed? The following Wuhan housing decoration acceptance standards tell you what specifications you should pay attention to during housing acceptance.

1. How to check and accept the house after the decoration is completed

The acceptance work after the house decoration is completed is very important, but how to check and accept the house after the decoration is completed? The following is a detailed description of the house acceptance content from 5 aspects:

1. Wall acceptance work

(1) Paint: Paint acceptance mainly uses visual inspection and hand feel for acceptance monitoring. , Generally speaking, for a qualified paint construction effect, the surface should be smooth and smooth, and the paint surface should be bright, smooth and moderate. If there are obvious brush lines on the wall paint, it means that the construction effect is not perfect.

(2) Wallpaper: Choose wallpaper to decorate the wall. The acceptance after decoration is mainly to see whether the wallpaper is smooth and without bubbles, and whether the wallpaper joints are well-fitted. Remember that the wallpaper must not have any tear-off edges. crack situation.

(3) Wall tiles: Choose ceramic tiles for laying on the wall. The main inspection is to see whether there is hollowing in the tiles. You can tap the wall with your hands to see if there is a crisp sound. If the wall tiles are hollow, there will be such a sound, and the construction workers will need to remodel it.

2. Ground acceptance work

(1) Wooden floor: For the wooden floor part of the house acceptance, it is mainly to see whether the wooden floor is not tightly paved. You can walk back and forth on the wooden floor, listen carefully to the sounds made by the floor, pay attention to your steps during the inspection, and repeat the test multiple times. If the sound is particularly loud, new construction will be required to solve the problem.

(2) Carpet:

It is very simple to decorate the floor with carpet. The main thing is to see whether the surface is smooth and clean after the carpet is laid. In addition, pay attention to whether the carpet decoration and the overall home decoration style are Just be consistent.

(3) Floor tiles: The acceptance method of floor tiles is basically the same as that of wall tiles. The main thing is to check whether there are hollows or lifted floor tiles. If there are problems in this regard, construction personnel need to solve them.

3. Water and electricity acceptance work

(1) Waterway part: The acceptance of the waterway part is mainly to check the water pipe outlet and drainage. You can check all the faucets in the home to see if the water supply in the water pipe is smooth. At the same time, Check to see if there are any leaks in the water pipes.

(2) Circuit part: The circuit acceptance is mainly to check whether the installation of the electrical box and switch box is reasonable. At the same time, when the power is off, turn the switches and leakage protectors by hand to check whether they are functioning properly. flexible.

4. Acceptance of woodworking projects

Woodworking projects include the installation of wooden doors, ceiling projects, and customization of wardrobes at home, etc. The acceptance of woodworking projects is mainly to check whether the opening direction of the wooden door is reasonable, and at the same time Check whether the cabinet door handles and various locks are installed correctly. Also check the firmness of the ceiling to check for installation safety and quality issues.

5. Acceptance of hardware and electrical appliances

(1) Electrical appliance part: The acceptance of the electrical appliance part needs to be compared with the design drawings and the layout diagram of the electrical appliances, and then check to see whether the installation positions of various electrical appliances are accurate. . Shake various electrical appliances at the same time to check whether they are loose or dropped.

(2) Switch part: The acceptance of the switch part of hardware and electrical appliances is mainly to check whether the installation position is correct and to see whether the switch can be used flexibly, etc.

(3) Socket part: Socket acceptance is mainly to observe whether the appearance of the socket is damaged. You can also use an electroscope to check whether the socket can be energized normally.

The editor reminds: House acceptance is the key to determining whether the decoration effect is good, so you must pay attention to the acceptance after the decoration is completed. Regarding the requirements for acceptance of various parts of decoration, the above introduction on how to accept the completion of house decoration, I hope it can be helpful to everyone.

2. Acceptance Standards for House Decoration in Wuhan

1. Acceptance Standards for Waterway Projects

For the waterway part of house decoration in Wuhan, the main inspection is to check the water supply and Check whether the drainage pipe is smooth and check whether the valve is installed correctly. In addition, all pipes, valves, and joints should be checked for water seepage or leakage during use.

2. Acceptance standards for electrical projects

The acceptance of electrical projects in houses in Wuhan is mainly to check whether the installation and fixation of electrical components and equipment are firm. At the same time, check whether the quality of the wires meets the requirements of national standards. At the same time, for the installation of switches and sockets, pay attention to whether the installation complies with regulations and the appliances are installed firmly and straightly.

3. Ceiling project acceptance standards

When accepting the ceiling project, you must first check whether the material types and specifications used in the ceiling project are consistent with those on the decoration quotation; secondly, pay attention to the ceiling Whether the base structure and fixing method meet the relevant design specification requirements.

4. Floor installation acceptance criteria

If wooden floor decoration is selected for floor decoration, then during acceptance, it should be noted that the wooden floor should be laid according to the light direction of the room. At the same time, the joints between wooden floor splicing should be aligned and the gap width should be consistent. In addition, the surface of the wooden floor should be clean and there should be no glue spillage.

Note: The above are some of the project standards for house decoration acceptance in Wuhan. There are many things to pay attention to in house decoration acceptance in Wuhan. It is recommended that after the decoration project is completed, you should spend some time to check and accept the house before proceeding. Check in to ensure the quality of the renovation project is reliable.

3. What to pay attention to when inspecting water and electricity for house decoration

1. Pay attention to water pressure

When inspecting water and electricity for house decoration, you should pay attention to the fact that the bigger the water and electricity pressure, the better. Generally speaking, between 0.6MPa and 0.8MPa is better. In addition, the pressurization time must be controlled. It is not that the longer the better.

2. Circuit part

For the circuit part, pay attention to the groove depth of the wall, which should be 1.5 times the diameter of the wire pipe; the wire pipe should be fixed at the corner with a pipe bender. The length is 200mm; there must be a lock nut at the connection between the wire tube and the wire tube, and the interface must be glued tightly.

3. Water and electricity pressure test part

When testing water lines, it is important to note that the pipes must be fixed and the pipe joints must be exposed. Each water outlet of the pipe must not be connected to water distribution equipment. If the water pipe is connected by hot melt, the hydraulic pressure test must be completed 24 hours after the pipe is installed.

Summary: The precautions for the acceptance of water and electricity for house decoration are as above. It is recommended that when doing the acceptance of water and electricity decoration, you must complete it step by step according to the steps. If you are not sure about the acceptance yourself, you can also entrust a professional master to do the acceptance work.

The above is about how to accept the house decoration after it is completed, and the relevant content of Wuhan City’s house decoration acceptance standards. I hope it will be helpful to everyone!