Job Recruitment Website - Zhaopincom - What are the safety and civilized construction measures for building installation projects? You can find it in that file. -Beijing area
What are the safety and civilized construction measures for building installation projects? You can find it in that file. -Beijing area
1, the environmental protection fee refers to all kinds of expenses required for the construction site to meet the requirements of the environmental protection department. Including: the cost of noise reduction and anti-interference measures for on-site construction machinery and equipment; The cost of fine-grained building materials such as cement that are easy to fly in the air, such as sealed storage or covering measures; Dust prevention and sprinkling expenses of the project; Earthwork, washing and leakage prevention of transport vehicles outside the muck building; The cost of on-site pollution source control, domestic garbage cleaning and transportation, on-site drainage and sewage treatment measures; Expenses for other environmental protection measures.
2. The cost of civilized construction measures refers to the cost of civilized construction measures such as safety protection adopted in the safe and civilized construction of the project. Including: "five certificates and one map" fee; On-site wall beautification (including internal and external painting, painting, slogans, etc.). ) and decoration expenses payable; On-site toilet painting, tiling, cement mortar floor or floor tile costs, temporary defecation facilities costs in the building; The cost of decoration and beautification measures for other temporary facilities on the construction site; The cost of on-site living and sanitation facilities; The cost of drinking water equipment, shower, disinfection and other facilities that meet the hygiene requirements; The cost of household clean fuel; The cost of measures to prevent gas poisoning and mosquito bites; The hardening cost of the construction site; On-site greening fee and comprehensive management fee for public security; On-site medical and health care equipment, articles and training expenses for first-aid personnel; Used for heatstroke prevention and cooling expenses of field workers, electric fans, air conditioners and other equipment and electricity consumption expenses; Cost of other civilized construction measures.
3. The safe construction fee refers to all the expenses required for safe construction on the construction site. Including: safety information, the preparation of special plans for special operations, the purchase of safety construction signs, and safety publicity expenses; "Three treasures" (safety helmet, safety belt and safety net), "four openings" (stairwell, elevator wellhead, access opening and reserved holes), "five sides" (balcony periphery, floor periphery, roof periphery, trench periphery and both sides of discharging platform), horizontal protective frame, vertical protective frame and outer frame are closed; Construction safety electricity costs, including three-level distribution of distribution box, two-level protection device requirements and external protection measures; Expenses for safety protection measures (including warning signs) for cranes, tower cranes and other lifting equipment (including derrick and gantry), external elevators, and facilities such as border protection, interlayer safety doors and protective sheds for unloading platforms; Inspection and test expenses of hoisting machinery on the construction site; The cost of safety protection facilities such as construction machinery protective shed and its fence; The cost of building a safety protection channel; The purchase cost of safety protection articles and appliances for employees; Configuration cost of fire-fighting facilities and fire-fighting equipment; Fees for electrical protection and safety lighting facilities; Expenses for other safety protection measures.
4. Temporary facilities refer to the cost of temporary buildings, structures and other temporary facilities that must be set up by construction enterprises for construction projects. Includes installing, maintaining, dismantling or amortizing the enclosure made of colored and shaped steel plates, bricks and concrete blocks at the construction site; Construction, maintenance, demolition or amortization of temporary buildings and structures such as temporary dormitories, offices, canteens, kitchens, toilets, clinics, temporary cultural welfare houses, temporary warehouses, processing plants, mixing tables, temporary simple water towers and pools on the construction site; Construction, maintenance, removal or amortization of temporary facilities on the construction site such as temporary water supply pipelines, temporary power supply pipelines and small temporary facilities; Expenses for installation, maintenance, removal and drainage of temporary simple roads, temporary drainage ditches and drainage facilities within the designated scope of the construction site; Other temporary facilities construction, maintenance, demolition or amortization expenses.
- Previous article:Is Hongta Securities Difficult to Enter?
- Next article:What about Yancheng Maixin Decoration Co., Ltd.?
- Related articles
- Shandong Business Vocational College Teachers' Salary
- Five resumes of nurses applying for jobs
- How to inquire about the record price of Maoming real estate?
- Excuse me, is there a place for the aged in Wuxi now?
- Beijing vocational high school daquan
- Xinjiang county education bureau report telephone number
- Rock loader, loader, excavator, slag scraper, plate bender. Are all these machines the same? Who can tell me the difference?
- How is Wuqing Daduke Electronics Factory?
- Is Quyang Yuanda School a primary school?
- Why is Zhengzhou Jia Wei car so cheap?