How much does it cost to build a private house in Foshan countryside, including labor and materials?

It is best not to contract materials for your own house. First of all, you need to find a professional architect to draw the drawings, and then take the drawings to the contractor to discuss the price. What he wants to wrap, and how high the tile is. It is best not to outsource the piling of houses. If you want to build a five-story building, you may not be able to pile. You may have to use gun piles or bored piles. Bored piles are calculated by how much per meter. When you speak, be clear about who is in charge of drilling mud and who is in charge of remaining mud.

Of course, if it is private, the unfilled site in the pond should start from the fourth floor, and it is best to use the whole house without bored piles, which is first-class earthquake-proof. If possible, bored piles are definitely better, but make sure there is no sediment in the middle.

It's best to open the window 1.5MX 1.5M (6M aluminum, with little loss). All aluminum materials and aluminum fittings can be found in Old Plank. Remember to shop around. It is best to use long Jin Lu or maple leaf as the glass glue for aluminum alloy windows.

The contract work does not include materials:

Main building+external wall tiles and indoor tiles+rough board = artificial 200 yuan side,

In addition:

Fan hui 4 text side,

A light is 1 1.

Security net 70- 100 yuan, aluminum window 145- 190 yuan.

Body segmentation: (formerly 200 yuan artificial)

Light main frame labor: 80 yuan/square (projection)

External wall+tricolor brick =26 (wall)

Internal swing: 4.5 yuan/Fang (wall)

Floor tiles and wall tiles: 10 yuan /m3 (wall)

However, it seems that private people are not allowed to build houses with more than four floors. It seems difficult to get the real estate license.

According to the current policy, the density of 80 square meters can be 100%, which means covering 100% of the land.

But if it exceeds 80 square meters, there should be about 10 square meters of garden space left, that is, only 80 square meters can be built on the first floor, and the second floor can float to 90 square meters.

Volume: If the landlord can't cover four floors, the maximum volume is 3.2, that is, the total construction area can't exceed 288 square meters.

I hope that the landlord will ask the Land and Resources Bureau clearly before the project is submitted for approval. There is no fine, and you may not get the real estate license.