Job Recruitment Website - Zhaopincom - When was Fengman Hydropower Station built in Jilin Province?

When was Fengman Hydropower Station built in Jilin Province?

Fengman Power Station is located on Songhua River, 24 kilometers south of Jilin Province. Built after Japanese imperialism invaded China 1936, with an installed capacity of 600,000 kilowatts. At that time, it was known as "the first hydropower project in Asia".

Fengman Hydropower Station is located in Fengman Township, Fengman District, Jilin City, with a drainage area of 42,500 square kilometers. The dam is a concrete gravity dam with a total storage capacity of107.8 million cubic meters. The first phase of the project is designed to install 8 units with a capacity of 560,000 kilowatts. During the occupation of Northeast China,/kloc-0 started construction in July, 1937, and by August, 1945,/kloc-0 completed 86% of the dam concrete, and installed 4 units with a capacity of 283,000 kilowatts. During the period when Soviet troops were stationed in Fengman, two troops were withdrawn, and only two were left when Jilin was liberated. After the founding of New China, the extension project from 1953 to 1960 was completed, and eight units with 554,000 kilowatts were installed, making Fengman Power Plant the main power plant undertaking the peak shaving task in Northeast Power Grid. 199 1 ~ 1992, 1997 ~ 1998, after two expansions, * * * installed 12 sets, 1002500.