Job Recruitment Website - Ranking of immigration countries - Overview of Baihe Hydropower Station

Overview of Baihe Hydropower Station

It is about 38.0km away from the dam site of Shuhe Hydropower Station, 0.65 km away from Ankang Hydropower Station 147.0km away from Qianjin Estuary, 35.5km away from Chengguan Town of Baihe County1kloc-0/km away from Gushan Hydropower Station and 2 13.0km away from the dam site of Danjiangkou Water Conservancy and Hydropower Project. The development task of Baihe (Jiahe) hydropower project in Hanjiang River is to give priority to power generation and give consideration to shipping. The normal storage level of Baihe (Jiahe) Hydropower Station is193.73m, the total storage capacity of the reservoir is1300,000 m3, the design dead water level is1910.73m, and the storage capacity is adjusted accordingly to 21250,000 m3 and the sediment discharge level is/kloc. Main buildings such as ship lift, bent frame and walking beam. All of them are Grade III, and the navigation and berthing buildings are Grade IV. The temporary building is Grade 4. The reservoir regulation performance is daily regulation, and the installed capacity of the power station is 180mw. Adopting 4×45mw bulb tubular unit, the annual average power generation is 554 million kW h. The navigation structure is designed according to 300 tons, and there is room for building a 500-ton navigation structure. The basic seismic intensity of the site is 6 degrees.