Job Recruitment Website - Ranking of immigration countries - Has the preliminary work of Dabatang Reservoir been completed?

Has the preliminary work of Dabatang Reservoir been completed?

The preliminary work for the construction of Dabatang Reservoir officially started in June 2065438+2009. At present, the exploration and survey of dam site and reservoir area have been completed, and the special report 14 has been compiled, including three special reports: backwater and normal water level, detailed investigation rules of construction land acquisition and resettlement planning, and detailed review of coordination physical investigation rules.

First, strengthen confidence in the construction of Dabatang Reservoir. The smooth implementation of Dabatang Reservoir Project is an inevitable demand to improve the urban and rural water supply capacity and the guarantee rate of backwater ecological flow in Ningxiang City. It is an inevitable demand for building a more solid water safety net and ensuring the high-quality development of Ningxiang and Changsha. The second is to optimize the design scheme. The positioning of Dabatang reservoir project should be accurate, and the functions of the reservoir should not be limited to flood control, water supply and ecology. It is necessary to further communicate with the design unit to optimize the design scheme from the aspects of flood control capacity and joint dispatching with Huangcai Reservoir irrigation area. Third, we should actively strive for the support of superiors. The Office of the Construction Coordination Leading Group should play a leading role in coordination and dispatch, actively communicate and connect up and down, conduct research and deployment on difficult issues in advance, coordinate the preparation of feasibility study report and resettlement work in strict accordance with the requirements of time nodes, actively strive for financial and technical support from superiors, ensure that all preliminary work is completed on schedule, and strive for the early start of the project.