Total investment of ancient water conservancy project construction
In the initial stage of construction diversion, it is planned to adopt the diversion mode of one-time interception and tunnel diversion, and it is planned to arrange two diversion tunnels in parallel on one bank. The structure type of earth-rock cofferdam is preliminarily selected, with loam core wall as seepage control and high-pressure shotcrete cutoff wall as foundation. The top elevation of upstream cofferdam is 5 19.50m, the top elevation of downstream cofferdam is 467.50m, the top width is 10.0m, and the slope ratio of upstream and downstream cofferdam is 1: 1.75.
The material transfer station of this project is planned to be located in Linfen City, with the total length of external traffic roads164km, of which18km needs to be built or rebuilt. A low-speed highway and an expressway are arranged on the left and right banks of the site, with a total length of 5 1.7km, in which the traffic tunnel is 650 meters long and the pier of the Yellow River Highway is 400 meters long. The total construction period of the left and right bank dam pulling scheme is 9 years, of which the static preparation period of the linear construction period is half a year, the main project construction is 8 years, the completion period is 6 months, and the preparation period is 2.5 years.
The budget price of main building materials is calculated according to the price in the second quarter of 2003, and the annual price index for calculating the price reserve is tentatively set at 0%. The main results of sub-investment estimation are as follows:
plan
total investment
(ten thousand yuan)
Partial investment of the project (ten thousand yuan)
Immigration and Environment (10,000 yuan)
Investment in soil and water conservation (ten thousand yuan)
Right bank powerhouse face slab dam
20395 15. 15
165 1437.08
3637 13.25
24364.82
CFRD of Zuo 'an Hydropower Station
2044 184.53
1656 106.46
3637 13.25
24364.82
Core dam of left-bank power station
226 1868.47
1873790.4
3637 13.25
24364.82
Main quantities of the project (right bank powerhouse face slab dam): 33.248 million cubic meters of earthwork excavation, 46.423 million cubic meters of earthwork filling, 2.205 million cubic meters of concrete and reinforced concrete, 36.265438 million tons of metal structure, 925,000 tons of cement and 279,000 yuan of steel, with a total construction period of 9 years.
- Previous article:What is the difference between IELTS life skills and other types?
- Next article:How did Japan come from?
- Related articles
- What are the requirements for emigrating to Australia?
- Is there any change in South Korea's real estate investment immigration policy?
- How about Danjiangkou Than Shwe Carbon Co., Ltd. in Hubei?
- There should be several kinds of residents' electricity surcharges, such as the electricity consumption of immigrants in the Three Gorges Fund Reservoir and so on.
- What is the landing guide for new immigrants in the United States?
- Can foreign aid be invited for the Asian Games?
- Brief introduction of Ma Chao. Who are Ma Chao¡¯s family members?
- Can I immigrate to a job without a Canadian federal file number?
- Where do American investment immigrants sign in?
- After passing other subjects, I signed up for the graduation thesis of Southwest University. Is the examiner a school?