An example reference analysis of constructing standard contract model

Before making a construction project plan, it is necessary for us to learn some legal knowledge, including the drafting of building standard contracts and appropriate demonstration cases. For example, today's example is about a construction standard contract that can be used in the market, and we have given a general style. You can refer to your own actual situation and determine the details, so that when there is a dispute in the later period, you can also use this as a basis to safeguard your rights and interests as much as possible.

Party A: * * County Reservoir Immigration Administration

Party B:

In order to implement the large and medium-sized reservoir fund project in * * county in 2023 and solve the drinking water problem of * * people, the project is now contracted out to Party B for implementation. In order to ensure that the construction task of this project can be completed on schedule with good quality and quantity, this contract is signed as follows through negotiation between both parties:

1. Project name: Large and medium-sized reservoir fund project in 2023.

Second, the construction content and scale

1. content: * *, * * human drinking water project.

2. Proportion: According to the design drawings and budget.

Third, the project cost

The total investment of the total project cost is about 340,000 yuan, and the project cost shall be subject to the audit and settlement of the actual acceptance quantities.

4. Contracting method: the work, materials and quality of the project contracted by Party B..

5. Project date: the commencement date is, the completion date is and the construction period is days.

The responsibility of party a and party b with intransitive verbs

Party A: Provide construction design drawings on time. During the construction period, Party A will send supervisors to the site for technical guidance and quality supervision from time to time.

Party B: Carry out the construction according to the construction contract and the construction design drawings provided by Party A.

Work, strictly control the quality, and accept the quality inspection and supervision of Party A during the construction period.

All expenses for rework caused by unqualified project quality shall be borne by Party B. ..

Seven. Do a good job in production safety: Party B should pay attention to safety during the construction process. Party A has nothing to do with the accidents of Party B's personnel during the construction process, and Party B is responsible for them.

Eight. Payment method of the project: After the project is completed, Party A will pay 80% of the project cost after organizing relevant departments to pass the acceptance. After the audit department issues the project settlement audit report, it will pay 15% and keep 5% as the project quality deposit. If there is no quality problem in the project after one year, the deposit will be refunded in full.

Nine, this contract shall come into effect as of the date of signature and seal by both legal persons, and will be automatically terminated after the project is completed and accepted and the deposit is returned clearly.

X this contract is made in quadruplicate, two for party a, one for party b and one for the finance bureau.

Party A: * * County Reservoir Immigration Administration

Legal representative:

Project leader:

Party B:

Legal representative:

Project leader:

Date of signature: year month day.

The above example is a case study on the formulation method and general mode of building standard contract. From this, we can know that, generally speaking, before making a building plan, it is necessary to clarify the division of costs, rights and interests, and some processes to prevent disputes from damaging the interests of both parties in the later period. In addition, from the legal point of view, contracts tend to be more rigorous and meticulous, which can also protect our own position from passivity to some extent.