Job Recruitment Website - Ranking of immigration countries - Water storage acceptance conditions

Water storage acceptance conditions

1. The image and characteristics of the water retaining structure meet the water level requirements.

2. Resettlement and bottom cleaning of reservoirs in flooded areas have been completed and passed the acceptance.

3. The drainage structures that need to be put into use after water storage have been basically completed and have overflow conditions.

4. Relevant observation instruments and equipment have been installed and debugged according to the design requirements, and the initial values and the observed values in the construction process have been measured.