Xiaojiang Town People's Government of Pingyang County:

Your unit's Review Report on Preliminary Design Requirements of Xiaodong and Hou Lin Sewage Collection System Phase I Project in Xiaojiang Town (Zheng Xiao [2021] No.70) has been received. According to documentNo. [20 17]54, on September 6, 20/KLOC-0, our bureau convened the county infrastructure planning bureau, the county housing and construction bureau, the county finance bureau, the Pingyang branch of the municipal ecological environment bureau, the county power supply bureau, the county water conservancy bureau, the traffic police brigade, the county comprehensive law enforcement bureau, the county referendum company, the Xiaojiang town water supply branch and the Pingyang county communication infrastructure.

1. Project construction address: Xiaojiang Town's 1,000-mu industrial production base and its resettlement community, local plots on both sides of century avenue in Xiaojiang Town, Fengtou District in Xiaojiang Town, and Danpu industrial production base in Xiaojiang Town.

Second, the construction scale and content:

(1) outdoor pipeline: the De 1 10 for UPVC pipe is 1 1273 m, and the De 160 for UPVC pipe is 315m;

(2) Sewage pipes: HDpe winding pipe DN225 is 5545m, HDPE winding pipe DN300 is1660m, HDPE winding pipe DN400 is 5570m, HDPE winding pipe DN500 is 42m, PE solid wall pipe De3 15 is 247m and PE solid wall pipe De400 is 2049m.

(3) Rainwater pipe: the DN300 of HDPE winding pipe is 3697m.

(4) Inspection wells and cleaning wells: 2028 sets of φ200 plastic wells;

(5)φ3 15 plastic manhole: 280 sets; Φ 700 brick manhole: 85; φ 1000 brick manhole: 278; 85 φ2000 reinforced concrete inspection wells; 1500×3000 reinforced concrete manhole 21;

(6) 12 reinforced concrete inverted rainbow well;

(7) 6 accident exits;

(8) Finished FRP septic tanks: 323;

(9) Road excavation and repair area: 260 1 1 m2.

Three. Scheme design: (1) Agree with the scheme design of the project in principle; (two) to further accurately predict the water consumption and sewage discharge; (3) The treatment scale of the project should meet the needs of daily emission collection; (four) pipe diameter should meet the requirements, and make a good connection with the original pipe network; (5) Optimize the design of ancillary structures and septic tanks;

4. Fire protection, environmental protection and labor safety design: (1) The fire protection design shall be subject to the review opinions issued by the housing and construction department; (2) The environmental protection design shall be subject to the approved EIA report; (3) During the project implementation, the "three simultaneities" shall be strictly implemented, safety precautions shall be implemented, and the "three simultaneities" obligations of occupational health shall be fulfilled according to law.

Five, energy-saving design according to the national development and Reform Commission 6 orders.

Other intransitive verbs: For specific matters involving county urban management bureau, county water conservancy bureau, county comprehensive law enforcement bureau, county traffic police brigade, Xiaojiang water supply branch and other departments, please consult with relevant departments and submit for approval according to relevant procedures.

7. The estimated total investment of the project is 45.8242 million yuan, of which the project cost is 39.0886 million yuan.

Eight, please the construction unit in strict accordance with the basic procedures for construction and management, strictly control the project cost, it is strictly prohibited to project cost "three super" phenomenon; The design unit shall carry out quota design according to the approved budget estimate, and it is strictly forbidden to design beyond the standard.

Nine, according to the modification into the construction drawing design stage.