Wacun hydropower station project
I. Introduction to the Basic Situation of Wacun Hydropower Station Project The dam site of Wacun Hydropower Station is located in the valley near Wacun Hydrological Station, 8.4km downstream of the junction of Tuoniang River and Xiyang River, and is under the jurisdiction of Baise City. The power station is 39.9km away from Nadu Cascade Power Station and 105km away from Baise Water Control Project.
Wacun Hydropower Station is an incomplete annual regulation, so it can carry out peak regulation and frequency modulation in dry season (165438+ 10 to April of the following year) according to the operation needs of power system. During the flood season (May ~ 65438+1October), the natural flow is large. On the premise that the water level difference between upstream and downstream is greater than the minimum head of the unit, the water level in front of the dam should be maintained at the normal water level of 307m, and when the inflow is less than or equal to 34 1 m3/s, the water level of the reservoir should be maintained at 29 1~307m, and the gate should be fully opened. When the inflow is greater than 34 1 m3/s, the water level of the reservoir is still maintained at 307m, and the inflow is generated by the power station as far as possible, and the excess water is discharged through the spillway.
The reservoir of this project involves five village committees in Bagui Township, Ba Du Township, Gaolong Township and Nabi Township of tianlin county, with a population of 2,408 people, a housing area of 8.0 1 10,000 square meters, and a total flooded land area of 24,448.0 mu. Centralized resettlement and urban resettlement are adopted respectively.
Work can be approved.
Reply of Development and Reform Commission of Guangxi Zhuang Autonomous Region on Approving Wacun Hydropower Project
Gui Fa Gai Energy [20 1 1]No. 127 1
Development and Reform Commission of Baise City: The request for approval of Wacun Hydropower Project (Baifa Reform Planning Report [201]1No.3) and related materials have been received. After research, the project is approved as follows: 1. In order to fully develop Youjiang hydropower resources, meet the local power consumption growth demand and promote the local economic development, it is agreed to build Baise Wacun Hydropower Project. The project unit is Baise Wacun Hydropower Development Co., Ltd. Wacun Hydropower Station is the second step of the supplementary planning for the comprehensive utilization of Yujiang River. The project focuses on power generation, taking into account water supply, flood control and shipping. The dam site of the power station is located in tianlin county, Youjiang reach in the upper reaches of Yujiang River, and in the canyon near Wacun Hydrological Station, 9 kilometers downstream of the junction of Tuoniang River and Xiyang River. 3. Three 76.67MW Francis turbine generator sets are installed in the power station, with a total installed capacity of 230MW and an average annual power generation of 699.6 million kWh. The power station hub consists of barrage, power station and two-stage vertical ship lift on the left bank. The barrage is a roller compacted concrete gravity dam, with the dam crest elevation of 3 1 1m, the maximum dam height of 103m, and the total dam crest length of 354.5m The navigation facilities are constructed according to the scale of seven-class waterway and 50-ton ship type, and implemented simultaneously. The normal water level of the reservoir is 307 meters, the dead water level is 29 1 meter, and the total storage capacity is 536 million cubic meters. The normal water level corresponds to a storage capacity of 496 million cubic meters and the regulated storage capacity is 225 million cubic meters. The reservoir inundation affected 4 townships, 17 village committees and 42 villagers' groups in tianlin county, Baise City. The flooded land area of the reservoir is 23,744./kloc-0.5 mu, including 5,777.67 mu of cultivated land and 8,239.29 mu of forest land. The land for the hub project is 1947.43 mu, of which 4510.65 mu (84.08 mu of cultivated land and 335.93 mu of forest land) is permanently expropriated and/kloc-0 1.495.78 mu (65,438 mu of cultivated land and 65,438 mu of forest land) is temporarily expropriated. By the planning level year of 20 15, the production resettlement population is 180 1 (reservoir area 1797, hub construction area 4), and the relocation resettlement population is 2 142. The power station is connected to Baise power grid with 220kv primary voltage double loop. 4. According to the price level of 20 1 1 in the first quarter, the static investment of the project is 2.378 billion yuan (excluding the delivered projects), of which the compensation investment for land acquisition and demolition for construction is 885 million yuan and the total dynamic investment is 2.665 billion yuan. The project capital is 799.5 million yuan, accounting for 30% of the total investment, which is raised by Baise Wacun Hydropower Development Co., Ltd. and the rest is solved by bank loans. Five, Baise City, tianlin county and Baise Wacun Hydropower Development Co., Ltd. should attach great importance to the reservoir resettlement work, and do a good job in the resettlement work in accordance with the spirit of the Regulations on Compensation and Resettlement for Land Acquisition in the Construction of Large and Medium-sized Hydropower Stations (the State Council Decree No.471No.7) and the State Council's Opinions on Improving the Support Policies for Large and Medium-sized Reservoir Resettlement (Guo Fa [2006]1No.7). The environmental protection, water saving and other facilities of the project must be designed, constructed and put into use simultaneously with the main project. 7. Please ask Baise Wacun Hydropower Development Co., Ltd. to conduct project bidding according to the requirements of the Decision on Approving Bidding Matters attached to this reply, and send the bidding documents and bid-winning notice to our Committee and relevant units for the record in time according to regulations. 8. Relevant supporting documents for approving the project include: Letter on Issuing Planning Consent for Wacun Hydropower Station (Zhushuigui Basic Letter [2010] No.458), Letter on Granting the Development and Use Right of Hydropower Resources for Wacun Water Control Project (Guishuihan [2009] 15), and Opinion on Site Selection of Construction Project. Kloc-0/65448 Letter on Sending Review Opinions on Water Resources Demonstration Report of Wacun Hydropower Station Project (ZZZ [201] No.90) and Letter on Sending Approval Document for Water Intake Application of Wacun Hydropower Station Project (ZZZ [2011] Notice of the Reservoir Resettlement Administration of the Autonomous Region on Printing and Distributing the Review Opinions on the Planning and Design Report of Land Expropriation Resettlement in the Feasibility Study Report Stage of Wacun Hydropower Station in tianlin county (Ji Jian Han [201] No.30) and the Registration Form of Geological Disaster Risk Assessment Report (Ji Jian Jian Jian Jian Jian Jian Jian Jian Jian Jian Jian Jian Jian Jian Jian Jian Jian Jian Jian Wa Cun Hydropower Station Project Site Seismic Safety Evaluation Results Approval Administrative License Decision) (20/ Kloc-0/0)No. 1565438), Letter from the Cultural Department of Guangxi Zhuang Autonomous Region on Opinions on Disposal of Cultural Relics in Baise Wacun Hydropower Station Construction Land and Its Influence Area (Gui 20 10) No.45 1), Reply on Relevant Issues Concerning Access System of tianlin county Wacun Hydropower Station, etc. 9. If necessary. 10. Baise Wacun Hydropower Development Co., Ltd. is requested to go through relevant procedures such as urban and rural planning, land use, resource utilization, and safety production according to this approval document. XI。 This approval document is valid for 2 years, counting from the date of promulgation. If the construction has not started within the validity period of the approval document, it shall apply to our Committee for extension 30 days before the expiration of the validity period of the approval document. If the project fails to start construction or apply for extension within the validity period of the approval document, or the application for extension is not approved, the approval document will automatically become invalid. Attachment: Decision on Approving the Bidding, 20th11year1October14th.
commencement
The completion ceremony of Nabi Hydropower Station and the commencement ceremony of Wacun Hydropower Station were held in Nongwa Village, tianlin county, Baise City.
Luo, vice mayor of Baise, presided over the ceremony. Yue, director of the Pearl River Committee, member of the Party Group of the Pearl River Committee, Su Xun, chairman of Wacun Hydropower Company, Gu Yue, deputy director of the Water Resources Department of Guangxi Zhuang Autonomous Region, Lai Derong, secretary of Baise Municipal Party Committee, Zhou Bingqun, mayor and chairman, and Secretary General of the Municipal Party Committee attended the ceremony.
Lai Derong, secretary of the Municipal Party Committee and director of the Standing Committee of the Municipal People's Congress, announced the completion of Nabi Hydropower Station and the start of Wacun Hydropower Station.
In his speech, Director Yue pointed out that the construction of Wacun Hydropower Station and Nabi Hydropower Station is an important measure to develop renewable energy, further improve the ecological environment, improve the economic benefits of Youjiang water resources and continuously improve the operation level. It is also a concrete embodiment of investing in farmland, building farmland and realizing the harmony between enterprises and local governments. Director Yue requested that the project owners and contractors should strengthen cooperation with local governments, follow the objective laws of hydropower project construction, pay more attention to the interests of migrants, pay more attention to ecological environment protection, pay more attention to resource conservation, ensure safety and quality, strictly control the project cost, and ensure that Wacun Hydropower Station will be put into production on schedule, so as to build it into a green demonstration hydropower station with high quality, high efficiency, energy conservation and environmental protection, and first-class benefits, and make greater contributions to local economic and social development.
Baise Wacun Hydropower Development Co., Ltd. is jointly funded by Guangxi Youjiang Water Conservancy Development Co., Ltd., Baise Electric Power Co., Ltd. and Zhujiang Water Conservancy and Hydropower Development Co., Ltd., and is responsible for the construction and operation management of Nabi Hydropower Station and Wacun Hydropower Station. The total investment of Nabi Hydropower Project is about 480 million yuan, the installed capacity of the power station is 48 MW, and the average annual power generation is 65.438+78 million kWh. The main project of Nabi Hydropower Station was started in June 2009 1 65438+1October1. In March, 1 unit was put into production. On June 23, all three units were put into operation to generate electricity, and the project construction has been completed. By the end of 5438+ 10, * * has generated 52 million kwh, which is 205 days safer than the hydropower station.
Wacun Hydropower Station is the second step of Yujiang River comprehensive utilization planning. The project focuses on power generation, taking into account the comprehensive utilization of water supply, flood control and shipping. The total investment of the project is 2.37 billion yuan, the total installed capacity is 230 MW, and the designed annual power generation is 700 million kWh. The long-term planning of the river where the project is located is a seven-level channel. Navigation structure adopts two-stage wet vertical ship lift, and the navigation scale is designed as a 50-ton ship. The construction of Wacun Hydropower Station can also alleviate the problem of insufficient water supply downstream in dry season, and play an important role in improving the ecological environment of rivers, improving the water environment and water resources allocation in the Pearl River Basin.
Directors of Management Committee Office, Construction Management Office, Water Conservancy Bureau (Hydrology Bureau), Xijiang Bureau, Zhuhai Academy of Sciences, Technology Center, Service Center, Development Company, Zhongshui Design Company, Xinzhu Supervision Company and other units attended the ceremony together with Director Yue. The total project duration is 53 months, the planned preparation period is 2 1 month, the main project duration is 27 months, and the project completion period is 5 months. The power generation cycle of the first unit is 48 months. The permanent project covers an area of 45 1.65 mu (the project hub covers an area of 36 1.5 mu, and the permanent road construction area is 90. 15 mu), and the total land area affected by reservoir flooding is 23,744.15 mu. Temporary project covers an area of 1495.78 mu.
- Previous article:Can a mother get gastric cancer and pass it on to her son? What are the chances?
- Next article:I may get married next year.
- Related articles
- "Mountains and Seas" is scheduled to be a hit in 2021. How strong is the cast from the director to the cast?
- I am from Qingtian. Is it better to live in Wenzhou or Qingtian?
- Sharla Cheung, a stunning beauty in the 1990s, whose parents have no background, why should she be afraid of playboy?
- The only countries that have made soft landings on the moon are China, the United States and Russia. Why did Israel and India fail to land on the moon one after another?
- What continents are black, white and yellow people distributed in now? Analyze the reasons.
- Mars immigrant army
- Seek all the translations of Xu Yuchuan in the later Han Dynasty.
- The materials are still well prepared. As a result, the visa officer didn't ask to see the materials when answering the questions, so I didn't hand them in. I don't know how to reapply immediately.
- Studying in Singapore: introduction to the application process and application materials for student visas.
- What is the significance of "looking for extraterrestrial life" to human beings?