Immigrants from wudongde hydropower station

According to the pre-feasibility study report, the land requisition for construction in wudongde hydropower station involves Sichuan and Yunnan provinces 10 counties (districts), 32 towns and 69 administrative villages, with a land area of 105.36 square kilometers (the construction area of the hub project10 square kilometers, and the flooded area of the reservoir is 94.5%). The total population of the construction requisition area is 23,408, and the housing area is 1, 504,38+0,000 square meters; The cultivated land garden area is 42,900 mu, and the forest land is 0.74 million mu; Underwater secondary highway 1 .7km, tertiary highway 3.4km, tertiary highway 1 7.0km, two bridges, six wharves, high-voltage transmission line1/6.3km, 35kV substation1,and communication line 67.33km..

The project preparation period is 3 years, the power generation period of the first batch of units is about 6.5 years, and the total construction period is about 8 years.

Wudongde hydropower station's early "three links and one leveling" construction projects include external traffic, internal traffic, artificial sand and gravel processing system, owner's base and construction camp construction, slag yard and storage yard, construction power supply system, construction water supply system, oil depot and gas station construction, land acquisition and demolition, environmental protection and water and soil conservation projects in the construction area, and other preliminary projects. The construction period is 33 months.

The dam site area of Wudongde is 12.32 square kilometers, including land 10.95 square kilometers and water10.37 square kilometers. The right bank involves Xincun and Aqiao Village in Wudongde Town, Luquan County, Yunnan Province, and the left bank involves Shiziwei Village, Baihe Village and Santai Village in Xinma Township, Huidong County, Sichuan Province, Hemenkou Village in Zuoluo Township and 6 villages in 3 townships (towns). The population within the land requisition area is 1477. The planned production resettlement population is 102 1, all of which are planned to be resettled in the village (town), including 2 12 people in the village and 809 people in the village (town). The total population of relocation and resettlement is 1752 people, all of whom are resettled in their own townships (towns), including 943 people in their own villages and 809 people in their own townships (towns).