Content of training materials for librarians of water conservancy and hydropower engineering
The contents of the first section preliminary work documents
I. Feasibility Study and Task Book
Second, the design of basic materials
Third, the design documents
Four. Evaluation report of each stage
Section II Project Proposal
I. Concept and function of project proposal
Second, the content of the project proposal
Three. Compilation of project proposal
Four. Examination and approval of project proposal
Section III Feasibility Study Report
First, the basis of feasibility study
Second, the content of the feasibility study report
Three. Examination and approval of feasibility study report
Section IV Evaluation Documents at Various Stages
A, division of engineering acceptance certificate
Second, the unit project acceptance certificate
Third, the contract project completion acceptance certificate
Section 5 Archive Scope and Preservation Period of Documents and Materials
Chapter II Documents and Materials for Construction Management of Water Conservancy and Hydropower Projects
Section 1 Project Management Documents
I. Resettlement planning
Second, compensation for land acquisition.
Thirdly, resettlement.
Fourth, the water resources demonstration report
Five, project bidding and subcontracting management documents
Section II Commencement Documents
I. Conditions for applying for commencement
Second, the application materials to be submitted to start construction
Third, the application for project commencement
Section 3 Project Construction Scheme
A, the preparation of engineering construction scheme
Second, the project construction plan audit
Section IV Filing Scope and Preservation Period of Documents and Materials
Chapter III Construction Documents of Water Conservancy and Hydropower Projects
The first section construction technical data
A, construction technical disclosure
Second, the minutes of the blue prints.the design
Third, the construction organization design
IV. Notice of Design Change
V. List of Project Negotiations
Technical contact person of intransitive verbs (notice)
Construction survey records in the second quarter
A, construction lofting inspection sheet
Second, the construction positioning measurement records and to submit for approval table
Section 3 Building Materials and Materials
A, the classification of engineering materials
Second, the preparation of engineering materials
Third, the material approach inspection related information
Fourth, the material test report
The fourth quarter construction records
A, concealed engineering acceptance record
Second, preview records
Third, the handover inspection records
Four, concrete inspection records
Five, component lifting records
Six, welding material baking record
Seven, on-site prestressed tensioning records
Eight, grouting inspection records
Section 5 Construction Test Records
A, construction test record general form
Second, the geotechnical compaction and backfill soil test report
Third, build mortar.
Fourth, concrete.
Five, reinforced connection test report
Section 6 Construction Quality Inspection
I. Basic provisions
Second, the construction inspection content
Three, water conservancy and hydropower engineering appearance quality evaluation
Four, quality accident inspection and quality defects for the record
Section 7 Filing scope and storage period of documents and materials
Chapter IV Supervision Documents of Water Conservancy and Hydropower Projects
Section 1 Overview of Work of Supervision Units
A, supervision unit work procedures
Second, the preparation requirements of supervision data
Three, supervision agency personnel responsibilities
Project progress control data in the second quarter
A, project schedule control and supervision procedures
Second, the project construction permit
Third, the project schedule control
In the third quarter, engineering quality control data
A, engineering quality control procedures
Second, the project subcontracting application form
Three, the construction quality joint inspection certificate (open)
Four, engineering quality defects treatment
V. Declaration Form for Project Acceptance
Six, supervision engineer's notice and reply
Seven, unqualified project notice
Eight, the station supervision on duty, patrol records
Nine, engineering accident report
The fourth quarter project contract cost control data
A, the project contract cost control program
Second, the engineering survey
Third, the declaration and audit of contract payment
Fourth, the contract payment management
Section 5 Contract Business Management Information
I. Engineering changes
Second, the contract claim
Third, the owner breached the contract.
Fourth, the contractor breached the contract.
Verb (abbreviation of verb) subcontracting
VI. Construction insurance
Section 6 Engineering Information Management Data
I. Engineering Information Management
Second, the management of supervision documents
Third, the delivery and acceptance of engineering documents
Four, supervision file management
Section 7 Supervision Coordination
First, the main work of supervision and coordination
Second, the coordination meeting
Third, meet with the contractor's project manager.
Four. Meeting minutes and documents
Section 8 Acceptance of Contract Works
A, the contract project acceptance basis and acceptance stage division
Second, the stage acceptance
Third, the unit project acceptance
Four, the contract project completion acceptance
Verb (abbreviation of verb) contractual liability
Section 9 Others
I. Project Handover
Second, the engineering defects liability period
Third, reward.
Fourth, evaluation
Section 10 Filing scope and storage period of documents and materials
The fifth chapter of water conservancy and hydropower engineering process equipment material file
Section 1 Equipment, Materials and Documents
A, the preparation of machinery use plan
Second, buy machinery and equipment.
Third, technical testing.
Section 2 Management Information of Building Materials
A, material acceptance and test documents
Second, the material factory certification documents
Section III Filing Scope and Preservation Period of Documents and Materials
Chapter VI Financial and Equipment Management Documents
Section 1 Financial Planning, Investment, Implementation and Statistical Documents
I. Capital budget
Second, the use of funds for approval
Third, the material cost management
Section 2 List of Main Equipment and Consumable Materials and Usage Records
Section III Filing Scope and Preservation Period of Documents and Materials
Chapter VII Completion Acceptance and Handover Data of Water Conservancy and Hydropower Projects
The first section project completion acceptance data
A, the general provisions of the project completion acceptance
Second, the completion acceptance inspection
Three. Pre-acceptance of completion technology
Fourth, the completion acceptance
Section 2 Project Handover and Handover Data
I. Project handover
Second, the project handover
Section III Issuance of Completion Certificate
First, the acceptance of the remaining issues and finishing work.
Second, the project completion certificate issued
Chapter VIII Geotechnical Engineering Quality Grade Evaluation Data
Section 1 Overview
First, the construction quality reaches excellent standards.
Second, the construction quality evaluation
Section 2 Excavation Engineering
A, rock slope excavation unit project
Second, the rock foundation excavation unit project
Three, rock underground excavation unit project
Four, soft foundation and bank slope excavation unit project
Verb (abbreviation of verb) Dredge unit project
Section 3 Foundation and Foundation Engineering
A, rock foundation grouting unit project
Second, the backfill grouting unit project
Third, the foundation drainage unit project
Four, bolting and shotcreting support unit project
Verb (abbreviation of verb) prestressed anchor unit project
Six, vibroflotation method foundation treatment unit project
Seven, concrete cutoff wall unit project
Eight, bored pile unit project
Nine, high pressure jet grouting unit project
The fourth quarter concrete engineering
A, concrete construction process
Second, the concrete appearance quality
Third, the concrete unit project
Four, reinforced concrete precast member installation unit project
Five, dam joint grouting unit project
The ninth chapter mechanical and electrical installation engineering quality grade evaluation data
The first section metal structure and hoist installation project
A, pressure pipeline buried pipe installation unit project
Second, the pressure pipeline exposed pipe installation unit project
Third, the gate installation unit project
Four. Mobile trash rack installation unit project
Five, hoist installation unit project
Second water-saving mechanical auxiliary equipment installation project
I. Project Division
Second, the auxiliary equipment installation project
Third, the system pipeline installation project
Section 3 Electrical Equipment Installation Project
A, the main transformer installation unit project
Second, the oil circuit breaker installation unit project
Three, isolating switch installation unit project
Four, oil-immersed transformer installation unit project
Five, lightning arrester installation unit project
Six, oil immersion plant transformer installation unit project
Seven, hard bus device installation unit project
Eight, soft bus device installation unit project
Nine, electrical grounding device installation unit project
X. Protection network installation unit project
XI。 Installation unit project of control and protection device
Twelve, electric lighting installation unit project
Chapter X Composition and Filing of Water Conservancy and Hydropower Engineering Data
Section 1 Archives Management
I. Archives and archival work
Second, the content of file management
III. Information submitted by the project legal person
Section 2 Filing and Handover
I. Documents and materials
Second, the completion figure
Third, audio-visual archives in the project construction
Four, electronic documents and electronic archives management
The establishment of the third quarter project files
A, the engineering document cover
Second, the general catalogue of engineering data
Three, the project file volume directory and archiving
Fourth, file transfer.
The fourth quarter project file acceptance
A, document acceptance requirements
Two, the steps, methods and contents of special acceptance of archives.
Three, the archives special acceptance opinions
refer to
- Previous article:Introduction of Tianjin Binhai Bridge?
- Next article:What are the advantages of registering a Canadian company?
- Related articles
- Is Latvia's national debt immigration reliable? How much should I prepare?
- Who are the main members of the South Vietnamese State established by Zhao Tuo? Where did the original Baiyue people go?
- The Transformers game starts with Bumblebee breaking through the level. I’ve downloaded it before, but it’s not Bumblebee. It’s called the Havoc Warrior.
- Canada's first home purchase has three major advantages. What will happen to the housing market in the next five years?
- How to tap the real needs of customers? Help you at 4 o'clock
- Which countries in the world do not recognize dual citizenship?
- What is the full name of border inspection?
- Luoding's traditional customs
- Is LLM what we call a master? Is its diploma the same as the domestic three-year master's diploma certified by the Ministry of Education (online 100, etc. )?
- Is the property value in Malaysia worth investing?