Job Recruitment Website - Ranking of immigration countries - Reservoir dam site selection
Reservoir dam site selection
Dams are generally selected in canyons, and reservoir sites should be selected in "pocket-shaped" basins or depressions in river valleys and valley areas. The reservoir area should be a closed area composed of the dam and the highest contour line it touches. If power is generated at the same time, it is necessary to choose places with large topographic differences and build more hydropower. Avoid the fault zone, so as not to induce fault activity, leading to earthquake, landslide, leakage and other adverse consequences. For large-scale water conservancy facilities, geological structure should be considered when site selection. Generally, it should be selected on the geological structure with solid foundation. Compared with syncline, the top of anticline is easy to be eroded into canyons due to the influence of tension, and syncline is not easy to be eroded by the extrusion of trough, so syncline should be arranged at the dam site of reservoir. In short, we should choose areas with solid geology, large canyon area, rich water energy and few immigrants. At the same time, water conservancy engineering areas such as reservoirs need to avoid karst landform areas during construction.
- Previous article:Classification of self-employed immigrants in Canada
- Next article:What noodle restaurants in Hefei make delicious noodles?
- Related articles
- Education that teaches people to become better and good people to become better is a good education.
- Ask an English expert to translate a sentence.
- A speech on protecting the mother river
- The real life of Norwegian immigrants
- Travel guide for the elderly in Britain: the travel market for the elderly in Britain.
- Immigration situation in Clinical Fellow
- Is Macy white?
- Can Jersey immigrate?
- Skilled immigrants from New Zealand need job opportunities provided by New Zealand employers. How to get this job?
- Do Koreans like immigrants very much? Why?