Job Recruitment Website - Ranking of immigration countries - Responsibility of water conservancy project
Responsibility of water conservancy project
In daily life and work, job responsibilities are more and more widely used in life. Job responsibilities can clarify what everyone's job responsibilities are, what kind of work they should undertake, what kind of responsibilities they should undertake, how to do better, what they should not do, and so on. There are many points for attention in formulating job responsibilities. Are you sure you can write it? The following are my responsibilities for water conservancy projects. Welcome everyone to learn from them, I hope it will help you.
Responsibility of water conservancy project 1 (1) is responsible for ensuring the rational development and utilization of water resources in the whole region. Implement national water conservancy policies and laws and regulations, and draft relevant local normative documents; Compiling comprehensive river basin planning, flood control planning and other major water conservancy planning for important rivers; Formulate relevant systems and measures for water conservancy project construction and supervise their implementation; To be responsible for putting forward opinions on the scale, direction and financial and water conservancy fund arrangement of district-level water conservancy fixed assets investment; To examine and approve fixed assets investment projects within the planning and annual planning scale of the whole region in accordance with the prescribed authority; Put forward suggestions on investment arrangements for water conservancy construction in the whole region and organize their implementation.
(two) responsible for the overall planning and protection of life, production, management and ecological environment in the whole region. Unified management and supervision of water resources; Formulate the long-term supply and demand planning and water distribution plan of water resources in the whole region and supervise their implementation; Organize the investigation and evaluation of water resources, and carry out the investigation of hydropower resources according to the regulations; Responsible for water resources scheduling in important areas and major water transfer projects; Organize the implementation of water permit, paid use system of water resources, water resources demonstration and flood control demonstration system; Guide water supply in water conservancy industry and water supply in villages and towns.
(3) Responsible for water resources protection. Organize the preparation of water resources protection planning, organize the formulation of important river water function zoning and supervise the implementation, verify the water pollution capacity, put forward opinions on limiting the total discharge, guide the protection of drinking water sources, and guide the development and utilization of groundwater in urban planning areas and the management and protection of groundwater resources.
(four) responsible for saving water. Carry out the water-saving policy, compile the water-saving plan of the whole region, and guide and promote the construction of a water-saving society.
(five) responsible for the prevention and control of floods and droughts, and undertake the specific work of the district flood control and drought relief headquarters. Coordinate and guide the flood control and drought relief work in the whole region, implement flood control and drought relief dispatching and emergency water quantity dispatching of important rivers and important water projects, prepare district-level emergency plans for flood control and drought relief and organize their implementation; To guide the emergency management of water conservancy emergencies.
(six) responsible for the safe production of water conservancy industry according to law. To organize and guide the safety supervision of dams of reservoirs and hydropower stations; Responsible for the supervision and management of water conservancy construction market, and organize and supervise the implementation of water conservancy projects; Responsible for investigating and handling illegal water-related incidents, organizing the implementation of water administrative law enforcement, coordinating, arbitrating and handling water disputes between departments and regions.
(seven) to organize and guide the management and protection of water conservancy facilities, waters and coastlines in the whole region; Organize and guide the comprehensive management and development of rivers within their jurisdiction; To organize and manage the construction and operation of water conservancy projects in the region; To undertake the work related to the resettlement management of water conservancy projects; Responsible for the management of river sand mining within the jurisdiction according to regulations.
(eight) to guide the rural water conservancy work. Organize and guide the construction of farmland water conservancy, and guide the construction and management of rural drinking water safety, reservoir reinforcement, water-saving irrigation and drainage of ponds and dams; Guide the construction of socialized service system of rural water conservancy; According to the regulations, guide the development of rural hydropower resources, guide rural hydropower electrification and small hydropower to replace fuel.
(nine) responsible for the prevention and control of soil erosion. Draw up regional water and soil conservation plans and supervise their implementation; Organize the implementation of comprehensive prevention and control of soil erosion, monitoring and forecasting, issue announcements on a regular basis, and be responsible for the examination and approval, supervision and implementation of soil and water conservation schemes of related construction projects and the acceptance of soil and water conservation facilities as required; Guide the implementation of key soil and water conservation construction projects in this area.
(ten) responsible for water conservancy science and technology and education and training. Implement technical specifications of water conservancy industry and undertake water conservancy statistics.
(eleven) to undertake other tasks assigned by the district government.
Responsibilities of water conservancy project 2 1. Strictly implement the technical regulations for small and medium-sized water conservancy projects, and be responsible for the implementation and execution of this year's spring repair project.
2. Seriously implement the construction specifications, procedures, quality inspection and evaluation standards and various management systems to ensure the quality and safety of the project.
3. Strictly disclose and guide the team's technology, process, operating procedures and quality requirements, and organize the construction process and quality assurance.
4. Seriously implement engineering survey and construction lofting according to technical requirements, make all kinds of construction records and quality inspection evaluation records in time, and be responsible for archiving engineering technical data.
5. Be responsible for the inspection and acceptance of building materials and equipment installation of this year's spring repair project and the final inspection of process construction quality.
6 in strict accordance with the provisions of the standard budget and final accounts, careful calculation, reduce waste, reasonable final accounts.
7. Do a good job in the' spring repair project acceptance report'.
Safe irrigation
1. Make statistics at the beginning of the year, and report basic information such as irrigation area, farmers' planting area, water use plan of the association, and organizational structure adjustment of the association.
2 responsible for the management of waterway engineering safety inspection twice a month, and report the safety inspection results and treatment opinions. Find problems and solve them in time, and make corresponding work records.
3. Be responsible for the implementation of the emergency rescue and dispatching plan for the irrigation period.
4. Be responsible for the statistics, adjustment, reporting and distribution of water declarations in paragraphs.
5. Responsible for water transfer management on duty.
6. Responsible for the daily water consumption, irrigation progress, monthly water consumption report and water affairs disclosure of trunk and branch canals.
7 management of irregular inspection, water diversion duty, hydrological test, waterway inspection and overdue service.
8. Be responsible for compiling, sorting, reviewing, reporting and archiving all kinds of safety production and irrigation management data and reports.
9. Be responsible for the skills training of employees in each position.
10. summarize the water diversion of the main canal and the water consumption of each branch canal on time every ten days, and check the matching rate. When it is found unreasonable, check it in time, find out the reason and correct it in time. Extended service work in irrigation area
1. Often go deep into the irrigation area to understand the operation of branch canals and farmland irrigation, and properly solve the problems in irrigation.
2. Do a good job in the construction of morals, do a good job in quality service, publicize the rural water fee reform and price adjustment to the beneficiary units and farmers, and actively do a good job in the extension service of irrigation area associations.
Actively assist leaders to complete other work.
Responsibilities of water conservancy project 3 1. Seriously complete the work assigned by the director and deputy director.
2. Do a good job in government affairs and affairs within the unit.
3. Complete the annual report of comprehensive statistics of water resources.
4. Assessment, allocation, carrying capacity analysis and daily supervision and management of water resources.
5 for water permit registration, renewal and annual examination.
6 timely release of water resources dynamic briefing and water resources bulletin.
7. Check the water meter and water quantity of water users, and collect the water resource fee in full.
8 issued the county (city, district) annual water plan and water users annual water plan indicators.
9 pilot water-saving society, water-saving project approval and water-saving technical measures project acceptance.
10. Delineate the water function area, check the water body's pollution capacity, and put forward the review opinions on limiting the total amount of sewage discharge and the sewage discharge of new reconstruction and expansion projects.
1 1. Carry out law enforcement inspection of water environment to guide water quality protection of drinking water sources.
12. Check and supervise the service quality and project approval of county water supply.
13. Responsible for water administrative legislation and law enforcement in the whole city.
14. Responsible for publicity and training of water laws and regulations and mediation of water disputes.
Responsibilities of water conservancy projects. Strictly implement the laws and regulations of the state and industry on safety in production, and adhere to the working principle of "safety first, prevention first and comprehensive management".
Two, responsible for establishing and improving the safety construction management, supervision system and security system, and earnestly perform the supervision and management functions of safety construction management. Be responsible for reviewing the safety measures and safety construction plans prepared by each unit.
Three, often in-depth inspection of the construction site, supervise and urge the implementation of various safety production systems, the implementation of safety technology operating procedures, and check the safety status of the construction site and construction machinery and equipment.
Four, responsible for the inspection and supervision of all units in accordance with the relevant national and industrial safety technical specifications for construction, and strictly implement the approved safety construction plan.
Five, timely correct and stop all kinds of illegal operations, risky operations and other acts, put forward the rectification plan, and supervise the implementation.
Six, strengthen safety education and safety training, and punish those responsible for violating the safety management system according to regulations.
Seven, establish and improve the safety management accounting, do a good job of safety information submitted. Responsible for the preparation of safety production statistics.
Eight, complete other work assigned by the leadership.
Responsibilities of water conservancy projects. Work under the leadership of the company's deputy general manager and accept the guidance of the company.
Second, strictly abide by the laws and regulations of the state and local governments on engineering construction and various management systems of the company.
Third, hold regular work meetings of the project department, preside over the formulation of monthly and weekly plans of the project department and be responsible for organizing their implementation. Supervise and inspect the progress of each work and the completion of the plan.
Fourth, go deep into the construction site, coordinate and deal with the problems in the construction process of each unit in time, and be responsible for organizing the inspection and acceptance of the project.
5. Be responsible for organizing the acceptance of the project and the materials, materials and equipment provided by Party A, and reviewing the payment application of each unit.
Six, conscientiously implement the safety production system, laws and regulations, do a good job in the construction safety management and emergency plan preparation and implementation.
Seven, responsible for the drafting of the contract, organize or participate in the contract negotiation and signing. Responsible for checking and urging the design, construction and supervision units to carry out various tasks as agreed in the contract to ensure that the project quality and progress meet the requirements.
Eight, do a good job in the basic management of the project, to ensure that all kinds of documents and materials get accurate and timely delivery and feedback, standardized filing and preservation.
Nine, complete other work assigned by the leadership.
Responsibilities of hydraulic engineering 6 1. Conscientiously implement the principles, policies, decrees and regulations of the party and the state, and resolutely implement the instructions and work arrangements of superiors;
2. Ensure that the project objectives are achieved and the owner is satisfied;
3. Formulate the phased objectives of the project and the overall control plan of the project;
4. Set up a capable project management team to determine the management responsibilities and authority of departments and personnel;
5. Make timely decisions on implementation plan, personnel appointment and dismissal, rewards and punishments, major technical measures, equipment procurement plan, resource allocation, schedule, contract and design changes, claims, etc.
6. Fulfill the contractual obligations, supervise the execution of the contract, and handle the contract changes. As a party to the contract, the project manager unifies the project parties to the project objectives and contract terms by using the legal binding means of the contract;
7. Take overall leadership responsibility for the quality, planning, cost, safety and civilized construction of the project;
8. Strengthen the construction management, improve the project management system and strictly assess its implementation, and strive to further improve the project management level;
9. Lead all departments of the project department to carry out construction production, timely communicate the situation, coordinate the relationship, preside over on-site office meetings and related special meetings, attend regular supervision meetings, listen to the opinions and expectations of the construction unit and supervision unit on the project, and convey them to relevant departments;
10, responsible for approving and issuing project instructions, reports, internal agreements, plans, statistical statements, meeting resolutions, handling decisions and documents and letters reported to the outside world;
1 1. Implement the company's quality, environment and occupational health and safety policies and powers, be responsible for establishing, perfecting, implementing and maintaining the comprehensive quality, environment and occupational health and safety policy system of the project management department, be responsible for the normal operation of the quality assurance system, and lead all project personnel to realize the quality, environment and occupational health and safety policies and objectives;
12, entrusted by the legal representative to sign relevant foreign economic contracts.
Responsibilities of water conservancy projects. Work under the leadership of the project manager and accept the guidance of the project manager at work.
Second, responsible for the technical management of engineering construction, assist the project manager to do a good job in engineering management, and go deep into the construction site to coordinate and deal with technical problems in engineering construction in time.
Three, it is strictly prohibited to implement the national and industrial engineering construction technical specifications, construction, inspection and acceptance. Responsible for the preparation and review of the project construction plan, and check and urge all units to implement it according to the approved construction plan.
Four, organize or participate in the technical disclosure of the project and the blue prints.the design. Put forward review opinions on design changes.
Five, to participate in the inspection and acceptance of the project, strictly audit the quantities, strictly control the construction technology, materials and technical requirements of the project, and ensure the construction quality meets the requirements.
Six, do a good job in the management of construction technical drawings, completion documents, etc. , and standardize the filing and preservation.
Seven, complete other tasks assigned by the leadership.
Responsibilities of water conservancy project 8 1, responsible for site construction management of water conservancy project;
2, responsible for the review of construction organization design;
3, responsible for organizing the formulation of site management system, the exercise of site management functions, so that the project site management in an orderly manner;
4, responsible for organizing regular inspection of the safety, quality, progress and civilized construction of the project;
5. Be responsible for organizing weekly/monthly meetings of on-site projects and annual, monthly and weekly plans of projects;
6, organize the preparation of the site log, organize the record of important events (weekly, memorabilia, pictures, etc. ), engineering statistics, quality records, meeting minutes, etc. ;
7. Organize to accumulate and sort out the original data of the completion acceptance report, organize to prepare the completion data, and assist in the acceptance and handover;
8, according to the requirements of the project, the deployment of project management personnel related work, and organize their implementation;
9, complete other work assigned by the leadership.
Responsibilities of water conservancy project 9 1. Responsible for organizing professionals to collect structural design data, draw up structural design scheme and write design report;
2. Responsible for organizing professionals to conduct on-site structural investigation before design;
3, responsible for organizing the preparation of structural design documents and drawings;
4. Be responsible for the structural design, review and modification of the engineering scheme;
5. Responsible for foreign technical negotiation and technical disclosure of structural construction;
6. Cooperate with site construction, quality inspection, completion acceptance, design review and design technology summary.
;
- Related articles
- Is it easy for parents and domestic civil servants to handle New Zealand reunion immigration for their children?
- Is it assimilation or adaptation by drawing inferences from one example?
- Which department of the Canadian Embassy in China should I send documents for Chinese immigration to Canada?
- Was Dongchuan Yueming Middle School changed into an industrial office in 22 years?
- What are the welfare advantages of Maltese immigrants?
- Myanmar immigrant area
- Is it possible to cover the whole territory of Xinjiang if the Tibet border card is replaced by Xinjiang?
- Is Xu Fudong's history of crossing Japan true? Thank you, everyone.
- Longkou, a beautiful hometown, writes compositions in spring, summer, autumn and winter.
- Recently, diseases, wars, natural disasters and man-made disasters .. In this troubled times, how can we protect ourselves and become a hero in troubled times?