County (city), District People's government, Liaohe Agricultural Reclamation Management Zone, Development Zone Management Committee, the relevant departments of the municipal government:
In order to implement the spirit of the special meeting held by the municipal government on April 26th, according to the requirements of the municipal government, the supervision office of the municipal government led media reporters to conduct special supervision on the project construction of counties (cities) and development zones from May 6th to May 6th, 201May, through TV interviews with leaders in charge and inspection of the project construction site. The relevant information is hereby notified as follows:
First, the basic situation of project construction work in various places
County (city) district governments and development zones attach great importance to this inspection organized by the municipal government. After receiving the inspection notice, they made full preparations according to the inspection contents. During the inspection, it was found that many projects in various places were in full swing, and the leaders in charge of project work in various places were full of confidence in completing the task. I feel that this year's project construction in our city presents the following remarkable characteristics:
(1) The spirit of the meeting has been thoroughly implemented. According to the inspection, the special work meeting of the municipal government on April 26th had a great influence on all localities. On the second day after the conference, all localities held implementation meetings to study the measures and methods to implement the project and ensure growth. This meeting dispelled the misconception in the minds of some cadres that the downward pressure on the national economy is great, and the national and provincial indicators are not high. Waiting and seeing the situation will not delay the achievements of that year. Everyone felt that at the meeting on April 26th, the message sent by the municipal government was very clear, and those who failed to complete the task would be held accountable, which further established a sense of crisis and urgency.
(2) All localities have paid unprecedented attention to the project work. In view of the project construction growth target set by the municipal party committee and the municipal government this year, all counties (cities), districts and development zones have formulated their own work targets in light of the actual situation, and are making secret efforts to realize a new round of revitalization and development. In order to promote the project construction, working groups headed by main leaders have been set up in various places to ensure the leadership of key projects, and the tasks have been implemented, responsibilities have been clearly defined, measures have been formulated, and assessment has been refined. Formed a working mechanism of weekly scheduling and monthly supervision.
(3) Pay more attention to the actual effect of project construction. In promoting project construction, all localities do not create momentum and do not want results, but concentrate on silently promoting project construction. For example, before April 26th, there were not many projects reported by Lishu County, so it was criticized by the main leaders of the municipal government. However, during the inspection, it was found that the first phase of the county's annual output of 6.5438+0.2 million tons of food-grade carbon dioxide and downstream products has been fully launched. The total investment of the project is 330 million yuan, of which the first phase investment is 654.38+35 million yuan. After all the projects are put into production, the estimated annual output value is 7 billion yuan, the profit is 495 million yuan, and the tax revenue is 360 million yuan. The implementation of this project will greatly promote the economic development of Lishu County.
(four) focus on supporting local enterprises' capacity expansion and transformation projects. Tiedong district: Actively help Siping Line Equipment Factory to upgrade. This enterprise invested 400 million yuan in this project this year, which is expected to be completed in July. After the project is put into production, the annual output of power fittings can reach 20,000 tons. After the project is put into production, the average annual operating income is 826.74 million yuan, and the profit and tax are127.87 million yuan. Relying on local oil resources, Yitong County plans to invest 800 million yuan this year and drill 82 wells, which can increase production by 49,000 tons, with considerable benefits.
(V) The proportion of eco-environmental tourism projects has increased significantly. Shuangliao city Qingda Agricultural Photovoltaic Ecological Demonstration Industrial Park covers an area of 52 1 10,000 square meters, with a planned total investment of 2.55 billion yuan. After the project is put into production, the annual output value is 630 million yuan, the profit is 65.438+82 million yuan, the tax revenue is 38 million yuan, and 5,000 people can be employed. At present, the fund has reached 300 million yuan, and the construction work is under way. Yitong County relies on unique natural, historical and cultural resources to develop Dagushan geothermal hot springs with a total investment of 654.38+0.3 billion yuan to build a hot spring water world. At the same time, dig deep into local historical and cultural resources and carefully create religious and cultural sightseeing spots and other service projects. The implementation of this project will further improve the tourism quality of our city and become a trump card tourism product to attract Changchun tourists. Tiedong district fully implements the "Hundred Flowers Happy World Project" and plans to build a flower tourist resort with an area of 1.500 mu. Colorful Sakura Valley, Baihua Valley, Xinyoumiao Demonstration Base and Taiwan Province Characteristic Organic Fruit Picking Garden will be built in the park, which is a comprehensive service project integrating leisure and vacation, crop planting and fertilizer sales. After the project is completed, it is estimated that the annual operating income will be 654.38+500 million yuan, the profit will be 400 million yuan and the tax will be 654.3+200 million yuan. Lishu County has developed the "North Bali Sightseeing Amusement Park Project", covering an area of 500,000 square meters, including sightseeing area, picking area, amusement area, leisure area and service area, which can receive 20,000 tourists at the same time every day. Now the scenic spot has begun to receive tourists. Hongzui Economic and Technological Development Zone has implemented the ecological and environmental protection project of Xiaohongzui watershed management, including sewage treatment, domestic garbage treatment, pollution control of scattered livestock and poultry breeding, river cleaning and regulation, etc. The implementation of this project will completely solve the problem of water pollution in the basin and help to build the villages around Hongzui Development Zone into a new rural model with ecological balance, beautiful environment and perfect facilities.
(VI) The scale of tertiary industry projects is relatively large. This year, all localities regard service industry project construction as an important measure to accelerate economic development, and the tertiary industry will drive the development of primary and secondary industries. Shuangliao city upgraded Liaohe Road, the main road of the city. The reconstructed road is 4066 meters long and 42 meters wide, which can effectively alleviate the traffic pressure in Shuangliao urban area and facilitate citizens to travel. Through attracting investment, Changchun Eurasia Supermarket Project was successfully introduced, and the project has started construction. Yitong Railway Station and Station Square Project of Liaochang Railway in Yitong County will completely end the history of no railway in Yitong County. At present, the station square is being built, including site hardening, greening, square modeling, parking lot and other projects. The project of Siping Central Hospital Building in Tiexi District has an investment of 450 million yuan and a construction area of 80,000 square meters, including 55,000 square meters of central hospital and 25,000 square meters of commercial complex. After the completion of the new internal medicine building, more than 0/000 beds and 0/6 departments can be added, which can greatly improve the medical and health conditions in our city. The central hospital project will also introduce internationally renowned enterprises Wal-Mart or Carrefour to meet the living needs of the hospital and surrounding residents. The central hospital in Liaohe reclamation area has a total investment of 400 million yuan, and the construction standard is a second-class general hospital. At present, the hospital is discussing cooperation with many large well-known hospitals in China to improve the medical technology level of the hospital. At the same time, the hospital bought helicopters to transport foreign experts and seriously ill patients. It is estimated that the time from Liaohe Reclamation Area to the First Hospital of Jilin Medical University in Changchun is only 17 minutes, which can win valuable time for rescuing critically ill patients. The implementation of this livelihood project can not only greatly improve the medical and health conditions of residents in the surrounding areas, but also create greater economic and social benefits for Liaohe reclamation area.
Second, the existing problems
(1) Individual cadres are afraid of difficulties. I think there are too many constraints now, and investment projects will involve many problems. It is not feasible to get on the bus before buying a ticket as in the past, and the risk is great. I want to see the situation. The work performance is lack of energy and enthusiasm, which affects the project construction effect to some extent.
(2) The project construction funds are insufficient. Affected by the downward pressure of the national economy, enterprises have a wait-and-see attitude towards the market prospects, and their willingness to invest is not strong enough. Some projects that have started construction have a low rate of funds in place. In addition, the difficulty of financing for enterprises, expensive financing and difficult matching of local funds are also important reasons that affect the project construction.
(3) Some projects have insufficient investment intensity and occupy too much land. The inspection found that some projects with an investment of only tens of millions and an annual output value of only tens of millions cover an area of over 65,438+10,000 square meters. In addition to the land occupied by the factory, there are a lot of idle construction land, and some of them are even used to grow flowers and grass. The input-output ratio of land is seriously unbalanced, and the waste of resources is extremely serious. Land is an advantageous resource in our city, and it is also a one-time resource. With the increasing pressure on resources, if we don't pay attention to the intensive use of land, our city will eventually lose this advantage, which will definitely affect the subsequent development.
(d) There are few large and good projects supporting regional economic development. The inspection found that although a number of projects were launched in various places this year, good projects are still rare. Some projects mainly focus on the production of primary products, lacking projects with high technology content, good output benefit, long industrial chain and strong driving ability, which play a supporting role in regional economic development.
(5) It is difficult to supply land for demolition, and sometimes the land planning adjustment is not timely, which affects the project construction progress.
Third, the inspection requirements
Liu Xijie, secretary of the Municipal Party Committee, pointed out: "This project is the anchor of Siping's economic development". It is an indisputable fact that there will be more projects and better projects in places with rapid development, whether from the whole country or from other cities and States in the province. We should carry out our tasks, strengthen our responsibilities and make strict assessment according to the targets set by the Fifth Plenary Session of the Sixth Municipal Committee, so as to ensure that our city is the first phalanx in the province.
(1) Ensure the fixed assets investment growth 15% determined at the beginning of the year. It is necessary to continue to transmit pressure, stimulate enthusiasm, promote the emancipation of minds in counties (cities), districts and development zones, further consolidate * * *' s understanding of projects and guarantee development, make full use of the industrial policies recently promulgated by the state and the province, firmly seize all favorable opportunities, and strive to achieve new development in project construction.
(2) Create a public opinion environment conducive to promoting the project construction. In the process of supervision, it is obvious that cadres are under great pressure and have the courage to take on tasks and requirements, but they may encounter resistance anytime and anywhere in the process of promoting their work. If you try again like in the past, and you are afraid of being investigated, it will inevitably affect your work. Therefore, it is necessary to create a public opinion orientation that organizations will support as long as they work hard for economic and social development and are honest and clean, and form a good environment conducive to promoting work.
(3) Land should be supplied according to the actual needs of the project in the future. All localities should scientifically calculate the construction land of the project, carefully study the input-output ratio, and do not wash the mud when the radish is fast, regardless of the land cost of any project. As long as the project can be built, the land supply will be responsive.
(four) as soon as possible to study and solve the problem of reducing financing costs. At present, bank lending funds require avoiding financial risks and maximizing benefits. Large enterprises have strong risk-taking ability and relatively good financing environment, and are also the easiest to enjoy the benefits brought by national industrial policies. However, the ability of small and medium-sized enterprises to resist market risks is weak. Although financial support is most needed, financial institutions are unwilling to provide financial support for these high-risk SMEs. The high financing cost of guarantee companies will inevitably affect the investment desire of small and medium-sized enterprises. In fact, small and medium-sized enterprises, as market players, contribute more to increasing employment than large enterprises, so it is also an important measure to promote the docking between banks and enterprises and strive for practical results.
(5) Strengthen the supervision and scheduling of project construction. At present, it is the golden period of project construction. It is necessary to strengthen the supervision and scheduling of project construction in various places, transmit pressure, enhance motivation, find problems in time, help solve problems, and promote the smooth development of project construction.
June 2008 19
Bulletin of engineering construction supervision
Party committees and governments of towns, street party committees and offices, and relevant departments directly under the municipal government:
At the beginning of this year, the municipal party committee and the municipal government incorporated the construction of key education projects into the city's 100 key projects and key projects for doing practical things for the people, and the municipal party committee and municipal government supervision office and the municipal assessment office tracked, supervised and assessed. Since July, the supervision office has registered and supervised the key education projects that lag behind the monthly promotion plan, and dispatched the progress of the projects every week. The relevant information is hereby notified as follows:
In 20 16, 55 key education projects were planned and constructed in our city. As of September 12, there were 27 * * started projects, with the operating rate of 49. 1% (7 completed projects, with the completion rate of12.7%); Six projects are in the stage of construction bidding; The preliminary procedures for 22 projects are being processed. Of these 55 projects, 26 are progressing normally and 29 are behind schedule.
Gangshan Street * * * undertakes two key education projects, but as of September 12, the construction has not started, and the progress is backward. By the end of August, Chongyi Primary School should have completed the foundation excavation, actually completed the construction drawing design, and the drawings are under review; Suzhuang Kindergarten in Yankuang No.2 Primary School should complete the bid opening, sign the construction contract, bid for the project supervision company and sign the contract, actually complete the construction drawing design, and is conducting the seismic review.
Fushan Street * * * undertakes three key education projects. As of September 12, construction has not started, and the progress is backward. At the end of August, * * * Qingtuan Road Primary School should have completed the foundation excavation, actually completed the construction drawing design, and the drawings are under review; The kindergarten affiliated to Fushan Primary School should complete the renovation of the main building, actually complete the drawing review, and the project cost is in progress; The kindergarten affiliated to Xiguan Primary School should complete the main construction on the first floor, actually complete the planning and design, and design the construction drawing.
Yishan Town * * * has undertaken two key education projects, and as of September 12, construction has not started and the progress is backward. By the end of August, Yishan Town Central Kindergarten should have completed the foundation excavation, actually completed the construction drawing design, and is reviewing the drawings; Dianzi Primary School Kindergarten has to complete the foundation excavation and actually complete the seismic review, and the project cost is under way.
Taiping Town has undertaken six key education projects, four of which have been completed and two are behind schedule. By the end of August, the comprehensive building project of Taiping Middle School should have completed the underground engineering, actually completed the seismic evaluation, and is undergoing financial investment evaluation; The teaching building project of Dongli Primary School should be completed underground, and the construction drawing design is actually completed, which is being put on record by the bidding agent.
A city * * * undertook four key education projects, and as of September 12, none of them had started construction, which was behind schedule. At the end of August, the bidding for the expansion evaluation of Xiangcheng Middle School Restaurant should be completed, and the seismic evaluation has actually been completed, and the project cost is under way; The comprehensive building of Xiangcheng central primary school should complete the financial investment review, actually complete the project cost, and is undergoing the financial investment review; Xiang Town Center Kindergarten and Xiang Town Second Center (Wangcun) Kindergarten should complete the financial investment evaluation, actually complete the project cost, and are conducting financial investment evaluation.
Tangcun Town * * * undertook two key education projects, but neither of them started construction, and the progress was backward. By the end of August, Tangcun Central Kindergarten and Baizhuang Kindergarten should have completed the foundation excavation, actually completed the project cost, and are conducting financial investment review.
Zhangzhuang Town * * * undertook three key education projects, and as of September 12, none of them started, and the progress was backward. By the end of August, the teaching complex of Laolin Primary School should have completed the project cost, actually completed the seismic evaluation, and is undergoing financial investment evaluation; Bian Xi primary school teaching building should complete the basic project, actually complete the financial investment evaluation, and the construction bidding is under way. Wanggou primary school kindergarten should complete the basic project, actually complete the project cost, and is conducting financial investment review.
Chengqian Town * * * has undertaken 7 key education projects, of which 1 has been started, 2 have been completed, 1 has been promoted normally, and 3 are behind schedule. By the end of August, the third middle school student dormitory and canteen project should have completed the signing of the construction contract and foundation excavation, actually completed the financial investment review, and is under construction bidding; Chengqian Town Center Kindergarten and Shanghe Kindergarten should complete the construction bidding, actually complete the project cost, and are conducting financial investment review.
Dashu Town * * * undertakes two key education projects, which have started 1 project and are behind 1 project. By the end of August, Mengzi Lake Kindergarten should have completed the foundation construction, actually completed the seismic evaluation, and the project cost is under way.
Shiqiang Town * * * undertakes three key education projects, which are under construction 1, and two projects are behind schedule. By the end of August, the second phase project of Stone Wall Central Kindergarten should have completed the construction of the first and second floors of the main frame, actually completed the financial investment evaluation, and is under construction bidding; Wang Yun kindergarten project should complete the foundation backfill and the first floor construction of the main frame, actually complete the project cost, and is undergoing financial investment review.
Zhongdian Town * * * undertakes four key education projects, of which 1 has been started and 1 has been completed, and two projects are behind schedule. By the end of August, the teaching building project of Dayuan Primary School and the kindergarten project affiliated to Dayuan Primary School should have completed the main construction of the first floor, actually completed the financial investment review, and the construction bidding is under way.
Guoli Town * * * undertakes 7 key education projects, and 6 are under construction. 1 The project is behind schedule. By the end of August, Guo Dong primary school teaching building should have completed the signing of the construction contract, actually completed the project cost, and is undergoing financial investment review.
There are still more than three months before the end of the year. All units should further improve their sense of responsibility, reverse the construction period, fight on the wall chart, take effective measures to catch up with the progress of the project and ensure that the construction tasks are completed on schedule. Towns Street Office shall, before September 25th, form a written material on the catch-up plan and specific measures, which shall be signed by the principal responsible person and stamped with the official seal (in duplicate), reported to the office of the leading group for the construction of key education projects in the city (the south first floor of the Municipal Education Bureau), and submitted to the electronic version.
The supervision office of the municipal party Committee and municipal government will continue to conduct follow-up supervision. If the work is not taken seriously, the measures are not effective, the project progress is slow, and the annual tasks are not completed, the accountability will be carried out according to the relevant provisions of Zoucheng's Measures for Investigating the Responsibility of "Being an Official and Being Idle" (for Trial Implementation).
Tel: 52372 19
E-mail: zdgctjb@ 163.com
Attachment: 1 City key education project construction progress ranking table (new, expansion)
2, the city's key education project progress ranking table (maintenance, renovation)
Zoucheng municipal Committee municipal government supervision Shi
September 2 1 day
Bulletin of Engineering Construction Supervision Fan Wensan
101From October 22 to 27, the Municipal Supervision and Examination Office, together with the Municipal Development and Reform Commission and the Municipal Bureau of Statistics, formed an inspection team to conduct a special inspection of the project construction in the city by means of on-the-spot inspection, listening to reports and consulting materials. The relevant information is hereby notified as follows:
I. Basic information
(1) Progress of "3341"project. This year, the city's "334 1" construction project * *1145 (336 continued and 809 newly built) has a total investment of1801200,000 yuan and an annual planned task of 59/kloc-0. From June 5438+0 to June 5438+0, the investment was 45.33 billion yuan, accounting for 76.6% of the annual plan. Among them, Wenxian completed an investment of 5.87 billion yuan, accounting for 87.7% of the annual plan; Xihe County completed an investment of 5.965438 billion yuan, accounting for 85.7% of the annual plan; Liangdang county completed an investment of 654.38+0.59 billion yuan, accounting for 83.8% of the annual plan; Lixian completed an investment of 510.5 billion yuan, accounting for 80.3% of the annual plan; Kangxian completed an investment of 5,265.438 billion yuan, accounting for 80.2% of the annual plan; Chengxian completed an investment of 5.78 billion yuan, accounting for 79.9% of the annual plan; Tanchang County completed an investment of 510.90 billion yuan, accounting for 73.9% of the annual plan; Huixian completed an investment of 3.2 billion yuan, accounting for 65.9% of the annual plan; Wudu District completed an investment of 7.43 billion yuan, accounting for 63.8% of the annual plan.
(two) the progress of major projects in the province. By the end of 10, among the provincial key projects, the investment in Longnan section of lanzhou-chongqing railway is1300 million yuan, accounting for 43.3% of the annual plan, and the accumulated investment is154.4 billion yuan, accounting for 73.5% of the total estimated investment of 2 10 billion yuan; The investment of Chengwu Expressway is 2.07 billion yuan, accounting for 9.7 1% of the annual plan, and the accumulated investment is1200 million yuan, accounting for 99.5% of the total estimated investment 12 1 100 million yuan; The Longnan section of Xunhua Expressway has completed an investment of 4.402 billion yuan, accounting for 94.5% of the annual plan, and the accumulated investment is 8.065438 billion yuan, accounting for 45% of the total estimated investment 1804 billion yuan. The investment of Bailong Jiangchengzigou Hydropower Station is 200 million yuan, and the power generation has been completed, with a cumulative investment of 654.38+0.27 billion yuan. The Miaojiaba Hydropower Station in Bailong River has completed an investment of 250 million yuan and completed power generation, with a cumulative investment of 2.9 billion yuan; The feasibility study report of Weinan section of Weiwu Expressway has been submitted to the National Development and Reform Commission for approval, and the bidding for the experimental section has been completed. Longnan Chengzhou Civil Airport has completed 2549 mu of land acquisition, accounting for 90.7% of the total land acquisition area, and the relocation of high-voltage lines and communication base stations in the experimental section of the airport construction area has been completed; The investment of oil pipeline project in the established villages in the province is 654.38+0.2 billion yuan, accounting for 67.8% of the total estimated investment of 654.38+0.7 billion yuan; The National Development and Reform Commission has officially approved the ecological protection and comprehensive management plan of "two rivers and one water", and the proposed plan of the whole city has been reported to the Provincial Development and Reform Commission for inclined support within the existing funding channels; The pre-feasibility study and pre-trial work is being carried out on Wujiu Expressway. Among the three major provincial projects supervised by the province and promoted by the city, the gold mining, dressing and smelting project of Bao Zhong Mining Company in Xihe County of Shandong Gold Group has completed an investment of 21000,000 yuan, accounting for 77.5% of the annual plan, with a cumulative investment of 940 million yuan, accounting for 90104.3% of the total estimated investment; Longnan characteristic agricultural products trading market completed an investment of 65.438+0.8 billion yuan, accounting for 90% of the annual plan, with a cumulative investment of 205 million yuan, accounting for 6.465438+0% of the total estimated investment of 320 million yuan; The construction project of e-commerce incubator in Longnan City has completed an investment of 654.38+0.2 billion yuan, accounting for 49.9% of the annual plan, with a cumulative investment of 654.38+0.2 billion yuan, accounting for 6543.8+0.3% of the total estimated investment of 900 million yuan.
(three) the progress of key projects included in the city. The city has identified 200 key construction projects (82 continued and 8 newly built 1 18), with a total investment of1206.7 billion yuan and an annual planned task of 24.47 billion yuan. During the period of 1- 10, the accumulated investment was1940 million yuan, accounting for 83% of the annual plan. There were 1 12 new projects, and the operating rate was 94.9%. Judging from the investment completion, Wudu District has completed an investment of 654.38+0.24 billion yuan, accounting for 99.2% of the annual plan; Liangdang county completed an investment of 850 million yuan, accounting for 96.4% of the annual plan; Tanchang County completed an investment of 65.438+64 billion yuan, accounting for 96.2% of the annual plan; Chengxian completed an investment of 654.38+35 billion yuan, accounting for 95.6% of the annual plan; Xihe County completed an investment of 654.38+0.22 billion yuan, accounting for 88.5% of the annual plan; Kangxian completed an investment of 654.38+0.08 billion yuan, accounting for 88% of the annual plan; Huixian completed an investment of 654.38+07 billion yuan, accounting for 85.8% of the annual plan; Wenxian completed an investment of 654.38+0.4 billion yuan, accounting for 76.6% of the annual plan; Lixian completed the investment of 1, 0 1 billion yuan, accounting for 69.6% of the annual plan; The investment in municipal projects is 8.865438 billion yuan, accounting for 78.2% of the annual plan. According to the project start-up, all the newly started projects in Wudu District, Wenxian County, Dangchang County, Chengxian County, liangdang county County and Lixian County have started, while three projects in Xihe County have not started, with an operating rate of 82.4%, and one project in Kangxian County, Huixian County and Municipal Government/KLOC-0 has not started, with operating rates of 93.8%, 88.9% and 66% respectively.
Second, the main problems
(A) the city's low completion rate of project investment. According to the inspection, during the period of 1- 1, the city's "334 1" construction project completed an investment of 45.33 billion yuan, accounting for 76.6% of the annual plan, 6 percentage points lower than the city's balanced progress. From the county perspective, Wenxian, Xihe and liangdang county counties are higher than or reach the balanced progress of the whole city; There are three counties in Lixian, Kangxian and Chengxian that have reached the average progress of the city. There are three counties below the average progress of the city: Tanchang County, Huixian County and Wudu District.
(2) The preliminary work of individual projects is relatively lagging behind. Judging from the inspection, the advance of the preliminary work has been affected by the long examination and approval time, many departments involved and complicated procedures of individual national investment projects. For example, although the trial section of Chengzhou Civil Airport and Weiyuan-Wudu Expressway has started construction, the feasibility study of the project has not been approved so far, so it is impossible to start construction in an all-round way; The two connecting lines between Wujiu Expressway and Shi Tian Expressway are still in the preliminary work stage. Individual investment projects are affected by factors such as the relatively backward preliminary work, such as the slow preparation of the preliminary planning of China Calligraphy Garden in Xixiangsong, Chengxian County, which leads to the failure to start construction as planned.
(3) The land requisition and demolition of the project is very difficult. Judging from the inspection, the difficulty of land acquisition and demolition is still a prominent problem affecting the current project construction. Due to the tight supply of construction land, there are differences in compensation standards for land acquisition and demolition in different regions and projects, and the people's expectations for compensation are too high to coordinate, which leads to the delay in starting some projects. For example, Longnan Agricultural Products (Walnut) Trading Center, Jinping Dam Power Station and other projects have not yet started construction due to unfinished land acquisition tasks; Lanzhou-chongqing railway Longnan Station, Longnan West Station, Orange Station and other issues left over from land acquisition and demolition have seriously affected the project construction progress.
(d) Some projects have a large funding gap. Judging from the inspection, due to the local financial difficulties at the city and county levels, the local matching funds involved in the investment and construction projects in the central budget are difficult to reach the designated position, the financing channels are single, the credit procedures are complicated, and the loan is difficult, which leads to the shortage of funds for some projects and the slow progress of project construction. For example, the flood drainage system project in Chengxian city, Huixian-railway station expressway and other projects, the construction progress is slow because the funds are not in place on time or the gap is large.
Third, several requirements.
(1) Strictly implement the leadership responsibility system. Counties (districts) should strictly implement the project responsibility system for leading cadres, further refine the objectives and tasks, and fully grasp the construction of major key projects listed in the "334 1" project and provinces and cities according to the actual responsible units, responsible leaders and time limits. Leaders should regularly listen to the work report of the lead department, go deep into the project site to carry out investigation and study, actively play their functional role, effectively solve specific problems, and speed up the construction progress of the project, especially for projects with slow construction progress, weak management and low investment, we should focus on tracking and supervising, conscientiously implement rectification measures, and strive to fully complete the annual investment plan of various construction projects.
(two) efforts to speed up the progress of project construction. All counties and districts should firmly grasp the construction time in the last two months, strengthen work measures, increase coordination services, accelerate the construction progress in an all-round way, and strive to do a good job in finishing the project construction this year. For projects that have not started, it is necessary to speed up the preliminary procedures, complete the preliminary work such as land acquisition, demolition, water supply and power supply as soon as possible, and start construction as soon as possible; On the premise of ensuring the quality of the project, further strengthen the construction strength, increase capital investment, speed up the construction progress, and strive to form more engineering objects; For completed projects, it is necessary to speed up the acceptance progress, ensure that completed projects are put into use as soon as possible, and bring benefits into play as soon as possible.
(3) Concentrate on solving the financing problem of land acquisition and demolition. All counties and districts should strive to solve the problems of project construction financing and land acquisition and demolition. We must firmly establish a sense of responsibility, plan and demonstrate a number of major projects, and actively strive for national and provincial project funds; It is necessary to innovate the way of attracting investment, concentrate on introducing a number of project funds, and inject vitality into major project construction; It is necessary to strengthen financing services, organize the docking activities between banks, enterprises and governments, and strive to create financial and credit conditions; It is necessary to develop financial products, activate private investment and constantly broaden financing channels. It is necessary to analyze and study the land acquisition and demolition work item by item, effectively integrate the law enforcement forces of land, construction, transportation, justice, public security and other departments, improve the efficiency of law enforcement, and effectively accelerate the progress of land acquisition and demolition work; It is necessary to do a good job in the ideological work of the masses, safeguard their legitimate rights and interests in accordance with the law, properly resettle the production and life of the people who have been expropriated, and solve the problem of land acquisition and demolition in a timely manner.
(4) Strengthen statistical analysis. All counties and districts should strengthen communication and convergence with the statistical departments of provinces and cities, strictly implement the statistical reporting system of project information, strengthen statistical analysis in accordance with the principle of territorial management, comprehensively sort out the projects under construction, and carry out the "review" of fixed assets investment statistics to ensure that no weight is missed. In particular, it is necessary to track and analyze key projects, pay close attention to the progress of the projects, and urge enterprises to truthfully fill in the data of fixed assets investment, and comprehensively and accurately reflect the completion of fixed assets investment in the county.
?
Attachment: Summary of the progress of the "334 1" project in June 1- 10.
xxxx
Date, year and month
Related articles in the bulletin of engineering construction supervision:
1. engineering construction bulletin
2. About the template of supervision notice
3. Model test report 5 Model test report
4. Work supervision and notification
5. Special inspection briefing
6. Work supervision report
7. Supervision and supervision briefing
- Related articles
- Foreign female stars
- Immigrants insult China.
- How many countries hold Palau passports and can be exempted from visas?
- What should I do if my immigration to the United States fails to pass the medical examination?
- Chongqing Three Gorges Vocational College is good.
- Does anyone know how the Han people in Qing Dynasty went to Northeast China?
- How to find a way out of debt? Are you going to work or start a business?
- Welfare of polish immigrants
- Qingdao Yilin Autism Rehabilitation Center Charge Standard
- Common sense of real estate tax of Irish immigrants