Investment and construction of Longtan hydropower station

According to the 2000 price level, the static investment of the project is 20.37 billion yuan, and the total investment of the project is 24.3 billion yuan. Capital accounts for 20% of the total investment of the project, and financing other than capital is 654.38+09.44 billion yuan, which is led by China Development Bank and provided by a consortium composed of China Construction Bank, China Bank and China Agricultural Bank. 1In March, 1999, the State Power Company and the government of Guangxi Zhuang Autonomous Region decided to jointly invest in the construction of Longtan Hydropower Project. State Power Company (33%), Guangxi Electric Power Co., Ltd. (32%), Guangxi Investment (Group) Co., Ltd. (30%) and Guizhou Capital Construction Investment Company (5%) signed an agreement with the joint venture company to form Longtan Hydropower Development Co., Ltd., which was established in199965438+February. In 2002, after the reform of the national power system, the original state power company's equity was handed over to China Datang Corporation. After the change, China Datang Corporation owns 65% of the shares of Longtan Hydropower Development Co., Ltd. ... Longtan Hydropower Development Co., Ltd. has set up 9 departments, namely: General Manager's Work Department, Engineering Construction Department, Planning and Contract Department, Engineering Technology Department, Mechanical and Electrical Equipment Department, Financial Management Department, Immigration and Environmental Protection Department, Human Resources Department and Party-Mass Work Department. The company has 84 full-time employees with an average age of 39. In order to ensure the normal development of the company's work, six experts and 60 auxiliary personnel were hired as necessary supplements.

The construction period of Longtan hydropower project is 9 years. In July 2006 1, the main project of Longtan was officially started, and the river closure was realized in June 2003 1 1; In 20061water storage in late October 165438+, the first power generation was carried out in July 2007. All 7 units were put into production in June 5438+February 2009.

Longtan Hydropower Project is designed by Zhongnan Survey and Design Institute. The main civil engineering is divided into five blocks. Bid 1: Left bank slope+diversion tunnel. The construction unit is China Gezhouba Group Company and the supervision unit is Sichuan Ertan International Engineering Consulting Co., Ltd.; Bid Ⅱ: right bank slope+diversion tunnel. The construction unit is Longtan Gui Jiang Hydropower Engineering Joint Venture, and the supervision unit is Sichuan Ertan Construction Consulting Co., Ltd.; Bid Ⅲ: Dam+Cofferdam. The construction unit is the Gezhouba Joint Venture of the Seventh Bureau and the Eighth Bureau of Longtan Hydropower Project, and the supervision unit is the supervision department of Chenghua International Longtan Joint Venture; Ⅳ standard: underground water diversion power generation system. The construction unit is Longtan Project 1478 consortium, and the supervision unit is China Water Conservancy and Hydropower Construction Engineering Consulting Zhongnan Company; ⅴ Bid Section: Navigation structure.