Request for instructions on engineering quantity increase

you need to apply to the superior for the increase of engineering quantity. How to write the request for instructions on the increase of engineering quantity? The following is the request for instructions on the increase of engineering quantity, welcome to read!

Request for instructions on the increase of engineering quantity I

Yuechi County People's Government:

The comprehensive building of the overall relocation project of Pingtan Central Health Center has a construction area of 5,191 square meters, which will be implemented in two stages: main frame and interior decoration. The price of the first-stage main frame in April of 2XX was 5,468,9 yuan through public bidding. At present, the earth and stone works for site leveling have been finished, and the main construction stage will be entered immediately. However, some projects that need to be implemented in one stage are not included in this tender. In order to avoid the influence of secondary construction on the main structure and meet the requirements of engineering functions, some projects need to be added in this main project construction stage:

1. Septic tanks. According to the site conditions, the septic tank can only be built on the left side of the comprehensive building, just above the sewage treatment tank, which is convenient for sewage to enter the treatment tank; The construction site of septic tank is all shale, and the depth of septic tank is about 3 meters. At present, the buried depth of independent column foundation of the main project is 1.7 meters, and the inclusion of septic tank in the next stage of construction will inevitably affect the foundation of the main project.

second, water supply and drainage and strong and weak electricity pipelines are reserved and embedded. The main structure of the complex building is a full-frame wall filled with hollow bricks. This tender does not include hydropower projects. Water supply and drainage, sewage pipes, strong and weak electricity distribution boxes, threading pipes, beams and plates will be excavated in the next stage, which will inevitably affect the safety of the main structure and increase the construction cost.

third, the lightning protection project of the comprehensive building. The design of lightning protection engineering is to embed the grounding body from the foundation and lead it from the main structure to the roof, but it has not been included in the tender at present, so it can not be implemented in the next stage.

fourth, indoor floor tiles. Because this tender includes doors and windows, the installation of doors and windows will directly affect the construction of floor tiles.

in view of the above-mentioned actual situation, the county government is requested to instruct relevant departments to participate in the examination of the projects that need to be increased. After the examination is passed, Pingtan Central Health Center will organize the implementation according to the prescribed procedures for increasing the quantities.

if no, please give instructions.

Request for instructions on the increase of engineering quantity II

Santai County Civil Affairs Bureau:

Sanyuan Town Nursing Home Project is a post-disaster reconstruction project, which was approved by Santai County Development and Reform Bureau [2xx] No.64 and approved by Sanfagai [2xx] No.176 with a total investment of 985,2 yuan. Mianyang Fujiang Construction Engineering Company won the bid with 765, yuan after bidding, and the project has now been basically completed. When the construction supervision, quality inspection, design, geological prospecting and other units carry out foundation acceptance, they think that there are serious safety hazards in the slope of this project, and the slope must be treated. Because the original design of the project did not involve slope treatment, in order to ensure the safety of the project, the town government plans to carry out treatment according to the supervision notice of quality inspection and other relevant units (No.1 [2XX] of No.3 Quality Supervision Bureau). The renovation project has passed the design and budgetary estimate of three Kexing geotechnical engineering companies, and the renovation project cost is 92, yuan. The town government decided that the renovation cost should be included in the construction cost of the nursing home project approved by your bureau, so please approve the construction.

if no, please give instructions.

Request for instructions on the increase of engineering quantity III

District Government:

According to the spirit of the minutes of the 22nd executive meeting of the district government, our bureau submitted the completed project settlement of the first-phase project of Xincun-Donghui section of County Road 43 to the district financial audit office for review. Due to the large amount of silt and garbage excavated and transported outside the bidding list increased by the project visa, it is estimated that the increased cost will exceed 3, yuan. According to the requirements of the district financial audit office, Our bureau specially asked the district government to increase the amount of silt, garbage excavation and transportation as follows:

The original tender list of this project needs to deal with 5,982 cubic meters of silt, 12,316 cubic meters of garbage soil, and the earthwork transportation distance is within 3km, which is handled by the construction unit nearby, and the project cost is 176,459 yuan. Due to the long time span of land acquisition and demolition in this project, the topography within the boundary has changed greatly compared with that in the project design. After the three-party visa confirmation of the construction agent, the supervision unit and the construction unit, 2,362 cubic meters of silt and 8,252 cubic meters of garbage soil outside the cleaning list have been added, totaling 28,614 cubic meters. Moreover, the spoil site of the original project is located near Ernongshanzai Village, which belongs to the resettlement land for Three Gorges immigrants, and the land acquisition has not been implemented. As a result, the abandonment of soil could not be implemented. After that, Heshan Village, Xinmin Town, Tong 'an District was confirmed by the three-party visa of the agent, the supervision unit and the construction unit, and the sludge and garbage soil were abandoned and transported to the landfill site outside the list, with a transportation distance of 15 kilometers. As a result, the amount of silt and garbage confirmed by the project visa is increased by 28,614 cubic meters, the transportation distance is 15 kilometers, and the cost of submitting for review is 715,39 yuan.

in view of the fact that the project was shut down due to the re-routing with National Highway 324, the construction unit has appealed to the court for the interests of the unfinished part. In order to solve the problems left over from history as soon as possible, our bureau requested the district government to study and review the increased amount of silt and garbage removal confirmed in the project visa.

I guess you are interested in:

1. Ask for instructions on increasing engineering quantity

2. Ask for instructions on changing engineering quantity

3. Ask for instructions on increasing business project format

4. Ask for instructions on village dam project

5. Ask for instructions on changing road engineering project

6. Ask for instructions on project report format

7. Ask for instructions on national highway engineering scheme.