What information is needed for the completion acceptance of hydropower station?

Owner information needs engineering contract, meeting minutes, owner's notice, material procurement, etc.

Supervision materials need engineering contracts, meeting minutes, letters with the construction party, the owner, the designer, acceptance data of various stages of the project, equipment defect data, etc.

The contractor needs the project contract, construction organization design (overall and each stage), acceptance data of each stage of the project, and the claim basis for time delay and rework caused by equipment problems.

Design drawings, change drawings, etc.

Technical data to be handed over include: technical documents and design changes; Full set of installation drawings (including modified drawings), specifications, quality guarantee and manufacturer's ex-factory certificate; Supplementary geological and hydrological data during construction; Building (structure) and large equipment foundation settlement observation records, main axis measurement; Pay-off records and list of leveling points; Material test records and warranty; Construction and installation engineering quality inspection and acceptance record and intermediate acceptance visa; Handling records of quality accidents and equipment defects during construction and trial operation; Installation records, acceptance visas and commissioning reports; Contracts, agreements, correspondence documents and minutes of important meetings that need to be used as the basis for production; Foreign technical data; Minutes of division of labor and coordination of unfinished projects; Evaluation documents of quality supervision institutions on unit quality supervision, etc.