Construction woodworking contract

Construction Woodworking Contract (1)

Entrusting Party: (hereinafter referred to as Party A) Construction Party: (hereinafter referred to as Party B) Newly-built residential projects shall be decided by both parties through consultation and in accordance with the Economic Contract Law of the People's Republic of China.

Employer:

Contractor:

Party A intends to build a new house. After fair competition, Party A will select the best one to contract the woodworking project in the construction and repair of the house to Party B. In order to complete the woodworking project designed by Party A and clarify the rights and obligations of both parties, this contract is hereby signed through negotiation. In order to abide by and strictly perform this contract, * * * agrees to abide by the following terms:

1. Project scale: Party A's newly-built house has two floors and one bottom, two rows of doors, reinforced concrete structure, and each floor is poured with reinforced concrete.

2. Woodworking price: Party A shall calculate the price according to the pier, floor, tunnel beam and column per meter.

3. Quality requirements: Party B must ensure that the columns, piers and floor beams are constructed in accordance with the specifications of Party A's house design, and at the same time ensure that the floor surface of each floor is flat and the stairs of each floor are even.

Four. Safety accident responsibility: Party B always puts safety awareness in the first place during the project construction. In the event of a safety accident, once Party A has purchased accident insurance and handled it according to the accident insurance stipulated by the state, Party A will not assume any other responsibilities.

Verb (abbreviation of verb) This contract shall come into effect as of the date of signature by both parties.

Matters not covered in this contract shall have the same effect as this contract after both parties reach an agreement through consultation.

Seven. This contract is made in duplicate, one for each party.

Party A:

Attend:

Party B: * * YY.

Construction Woodworking Contract (2)

Project name:

Party A:

Party B:

Through negotiation between Party A and Party B, Party A will contract the carpentry of this project to Party B in the form of labor contract and material assistance. Following the principles of equality, voluntariness, fairness and good faith, both parties sign this contract for mutual compliance.

I. Scope of Contract:

The design drawings of this project include formwork fabrication, scaffold fabrication, wooden formwork installation and removal, formwork arrangement, repair, oiling, removal and stacking, etc. After the completion of the main project, the materials will be classified and stacked at the designated place. Pay-off work around the wood and the production of required stakes, the production of square and rigid roof joints and the contents of technical disclosure, etc.

Second, the time limit for a project:

What is the total duration from the date of the month to the date of the month? Jesus Christ.

Third, the quality standard:

Project quality: According to the current national construction and acceptance specifications and quality evaluation standards for construction and installation projects, this project must meet the quality evaluation standards.

Four, drawings:

At the beginning of labor subcontracting, Party A shall provide Party B with a set of drawings. In the process of construction, if the drawings are insufficient, Party B will solve them by itself.

Verb (abbreviation for verb) Contract price:

According to the above contract, the payment is calculated according to the actual construction area, and each square meter is denominated in RMB. During the construction period, Party B shall pay% of the floor area in advance for each main floor completed, and the rest shall be paid within months after the completion and acceptance of the project.

Intransitive verbs pay labor remuneration:

For each floor (foundation floor) of the main structure,% of the building area of this floor shall be paid, and the rest shall be paid within months after the completion and acceptance of the main project.

Seven. Obligations of both parties

Obligations of Party A:

1. Provide Party B with construction drawings and technical data, and be responsible for the supervision, inspection, guidance and management of engineering technology, quality, safety and construction period.

2. Be responsible for examining and approving the list of materials needed for the project and the mechanical equipment plan provided by Party B. ..

3. According to the approved list of materials provided by Party B, provide materials, mechanical equipment and temporary facilities needed for the project. ..

4. Make written technical disclosure and safety disclosure to Party B, and examine and approve Party B's construction plan.

5. Be responsible for the management of the whole construction site, coordinate the work of Party B, and ensure that Party B carries out the construction according to its approved construction plan.

6, responsible for contact with the owner, supervision, design and related departments, coordinate the working relationship.

7, responsible for the location of the main axis of the floor, floor elevation transfer.

Obligations of Party B: Organize corresponding skilled workers to take up their posts, be responsible for completing the main acceptance work, and consciously abide by laws and regulations and relevant company rules and regulations.

1, accept the overall management of Party A, obey the command of the on-site management personnel, and report the sub-projects to Party A for acceptance after they pass the self-inspection.

2, in strict accordance with the design drawings and joint review, drawing changes, construction acceptance specifications, relevant technical requirements and construction organization design, careful construction, to ensure the engineering quality to meet the agreed standards. Scientifically arrange the operation plan and invest enough manpower to ensure the construction period; Strengthen safety education, conscientiously implement safety technical specifications, strictly abide by the safety system, and implement safety measures to ensure construction safety; Strengthen site management, strictly abide by the management regulations of relevant units on the construction site, and achieve civilized construction.

3. The materials and mechanical equipment needed for the project shall be submitted one week in advance, otherwise the losses caused shall be borne by Party B. ..

4. Bear the losses caused by quality modification, rework, construction delay, safety accidents, messy site and various fines. After the completion of the project, all used square timber, beam-column formwork, veneer, etc. Will be pulled out and stacked in the designated location.

5. Do a good job in the protection of finished products of buildings, structures, underground pipelines and completed projects around the construction site. If the damage is caused by Party B's responsibility, Party B shall bear all economic losses and various fines caused thereby.

6. Properly keep and reasonably use the equipment, tools, turnover materials and other facilities provided or leased by Party A. ..

7. Be responsible for floor setting out (except for the main positioning axis that Party A is responsible for).

8. Party B shall be responsible for the expenses for planing the deformation of beams, columns and plates caused by Party B's construction.

Eight, safety construction and inspection

1. Party B shall abide by the regulations on production safety in engineering construction, carry out construction in strict accordance with safety standards, accept the supervision and inspection carried out by industry safety inspectors according to law at any time, obey the instructions of Party A, and take necessary safety protection measures to eliminate potential accidents. Party B shall be responsible for all safety incidents during the construction period.

2. Party B shall provide safety education to its employees on the construction site and be responsible for their safety.

Nine, prohibit subcontracting or subcontracting.

Party B shall not subcontract or subcontract the labor services under this contract, otherwise Party B will bear the responsibilities according to law.

X. others

1, Party A

(1) Notify Party B in advance of the changes and changes in the construction process, and compensate Party B for the losses caused by Party A's untimely notification according to the actual quantities.

(2) If Party B's personnel organization is not in place or the construction quality and time limit can't meet Party A's requirements within the time specified by Party A, Party A has the right to change teams and terminate the labor contract. In normal construction, if Party B's foreman does not obey Party A's management, Party A has the right to ask Party B to replace other foreman within 7 days.

2. Party B

(1) Party B shall carry out the construction according to the time limit, quality and safety agreed by both parties. Except in special circumstances, Party B will be fined RMB for every day of delay in the construction period, and take measures to remedy it according to Party A's requirements, otherwise Party A has the right to take necessary measures to carry out the construction. If the quality can't reach the standard agreed in the contract, all losses caused thereby shall be borne by Party B. ..

(2) Party B must clean up the site every day, keep the materials neatly stacked and keep the site clean and tidy. At the same time, Party B shall not stop work because Party A's temporary funds are not in place, otherwise all losses caused shall be borne by Party B. ..

(3) Party B shall unite and be friendly during the construction, and shall not fight or damage the public image. In case of similar incidents, it shall be handled according to the seriousness of the case. Take care of public goods and materials. If it is lost or damaged, press double indemnity.

(4) The quality rework waste caused by poor management shall be compensated by Party B, and the fine caused by quality shall be borne by Party B and deducted from the payment by Party A..

(5) Employees shall be in good health, and shall not employ workers who are not allowed to engage in this occupation as stipulated in the Labor Law.

Twelve. Matters not covered in this contract shall be settled by both parties through consultation and supplemented in written form.

This contract is made in duplicate, with Party A and Party B holding one copy respectively. It will come into effect after being signed by both parties, and the project payment has been paid.

Self-invalidation.

Party A:

party B

Year? Month? sun

Construction Woodworking Contract (3)

Person in charge of Party A:

Person in charge of Party B:

In accordance with the Contract Law and relevant national laws and regulations, and following the principles of equality, voluntariness, fairness, honesty and credibility, Party A and Party B have reached an agreement on the following contents through full consultation? Wanyuan Xindian Gaoshan Resettlement House? This contract is hereby concluded by reaching an agreement on the manufacture, installation and other related work of carpentry, formwork and support, and the contracting of all consumable materials, mechanical equipment and tools.

Rule number one Project overview

Project name: Xinyuan Xindian Gaoshan Resettlement House

Project location: Xindian Township, Wanyuan City

Rule number two Unit price and scope of project contracting

1, according to the construction area of 40.00 (thirty-five) yuan /m2 for cost settlement (the slope roof is calculated according to the horizontal projection);

2. The project contracting scope includes carpentry, formwork, supporting system, safety and other work (including auxiliary materials) related to this project.

Including carpentry production, installation, erection, hoisting, transshipment, pull rods, wall pipes, butterfly buckles, fire hooks, nails, iron wires, sealants, safety belts, helmets, equipment, tools, cleaning, cleaning, etc. , including overtime expenses at night and in rainy days.

Article 3, the construction period

1. Time limit: days.

Year? Month? Started working in June,

Year? Month? Completed in June.

If the project cannot run normally due to Party A's reasons, Party A shall be responsible for it; If the construction period fails to meet the requirements due to Party B's reasons, Party B shall be responsible for and compensate Party A for the losses.

2. Party B shall prepare the construction progress plan of this project from commencement to completion acceptance (and implement it in strict accordance with the progress plan after submitting it to Party A for review), and implement Party A's schedule (including the newly adjusted schedule).

3. If the construction period is delayed by one day, it will be fined 1000.00 yuan; Reward 500.00 yuan one day in advance.

Article 5? Engineering quality standard

The engineering quality within the scope of contracted projects must meet the qualified engineering standards and pursue Excellence.

Article 6? Responsibilities and obligations of Party A

1, responsible for the unified formulation of various management objectives, supervision, inspection and acceptance of project quality, time limit for a project, safe production and civilized construction.

2. Coordinate the working relationship on site.

3. According to the progress of the project, Party B needs to increase or decrease the number of construction workers to meet the needs of construction and production. Educate, punish and repel the personnel with poor construction quality, poor technology, disobedience, violation of laws and regulations and non-compliance with industry regulations.

4. Pay the labor service fee and progress payment to Party B as agreed by both parties.

5. Assist Party B to handle the entry and exit certificates of the on-site construction personnel, purchase clothes and purchase "three guarantees" equipment.

Article 7 Responsibilities and Obligations of Party B

1, abide by national policies and laws and regulations; Abide by the relevant rules and regulations of the construction unit (owner), supervision unit and Party A, carry out civilized construction, do a good job in safety training and education before taking up their posts, prevent accidents, and do a good job in "three-level" education on environment, occupational health and safety and labor protection.

2. Carefully organize the construction in strict accordance with the engineering design drawings, construction acceptance specifications, requirements of relevant operating procedures and construction organization design, ensure that the engineering quality reaches the agreed standards, and be responsible to Party A for all the engineering quality within the scope of the labor service contract of this project; According to the plan requirements of the owner or Party A (including the adjusted plan), organize the operation plan reasonably and scientifically, and invest enough manpower and material resources to ensure the project progress, quality, safety and construction period. Party B shall bear the quality repair, liquidated damages for delay and various losses caused by its own responsibility. At the same time, bear the corresponding risks and safety accidents according to law.

3. Party B's own managers, technicians and security personnel should stick to their posts. Skilled workers must hold relevant certificates in accordance with state regulations. The original certificates of all management personnel and special operations personnel shall be submitted to Party A for unified management for future reference.

4. Obey the supervision, inspection and management of Party A and the owner; Accept the management of quality, progress, technology, safe production, civilized construction and environmental protection by relevant personnel of Party A and the Owner. Accept Party A's inspection of the storage and use of equipment and materials and the valid certificates and certificates of operators at any time.

5. Do a good job in the protection of finished products of buildings, structures, underground pipelines and completed projects around the construction site. If the damage is caused by Party B's responsibility, Party B shall bear all economic losses and various fines caused thereby.

6. Stack materials and equipment according to Party A's unified planning and keep them properly.

7. Sign a labor contract with each migrant worker according to the national policy, and pay the wages of migrant workers on time according to the terms stipulated in the contract (the wages of migrant workers are recorded on a monthly basis and submitted to Party A's librarians on the 25th of each month), and bear the disputes caused by the inadequate work or the punishment and responsibility consequences of the local construction administrative department.

8. Equip the construction personnel with necessary and qualified labor protection and safety protection articles (such as safety helmet, safety belt, work clothes, gloves and other related protective articles), and punish them in violation of relevant regulations.

9, in the construction personnel requirements have good ideological quality, good health, skilled technology and other conditions; It is forbidden for/kloc-minors under 0/8 years old, the elderly over 55 years old and the infirm to enter the site for construction; It is strictly forbidden to use illegal personnel, and Party B shall bear the responsibilities and consequences caused by using the above unqualified personnel.

10. When Party A's funds are not in place temporarily, Party B shall try its best to explain to its construction personnel. If the project payment is not paid on schedule, Party A and Party B shall settle it through negotiation.

Article 8? Payment and return of performance bond

1. In order to effectively perform the labor contract of this project, Party B voluntarily pays a labor performance bond of RMB 1 10,000 Yuan only to Party A when signing this labor contract (the performance bond does not bear interest).

2. The performance bond is the guarantee for Party B to effectively perform the labor contract of this project.

3. Return of performance bond:

After the completion and acceptance of the main project, it shall be returned.

Article 9 Environmental protection, safe production and civilized construction

1. Party A mainly organizes the education of Party B's construction personnel on safety production, civilized construction, environmental protection and related systems; According to national laws and regulations and relevant rules and regulations, supervise and monitor the implementation of Party B's related work, so as to make its system run effectively.

2. Party B shall abide by the management regulations on safety production in engineering construction and carry out construction in strict accordance with safety construction standards; In terms of safety, civilized construction and environmental protection, relevant standards, objectives and requirements must be met. Strengthen the safety education of field operators; Seriously implement safety measures and take necessary safety protection measures to eliminate hidden dangers of accidents and ensure safe production; Accept the supervision and inspection carried out by safety inspectors according to law at any time. If an accident is caused by ineffective safety measures or illegal operation, all responsibilities, consequences and economic expenses shall be borne by myself. In case of quality and safety accidents, Party B shall immediately report to relevant departments of Party A in accordance with relevant regulations and handle them in accordance with relevant national laws and regulations.

3. Party B shall strictly implement the management regulations of the competent construction department and relevant departments of environmental protection, fire protection and health on the construction site, so as to achieve civilized construction; Ensure that the construction site is clean and orderly, conform to the relevant regulations and requirements of civilized construction, maintain the good corporate image of Party A, and bear the losses and fines caused by violating relevant regulations.

4. Strengthen site management, take all appropriate measures to protect the internal and external environment of the site and limit noise or other pollution caused by construction; Avoid causing damage and obstruction to the property of the public and third parties.

Article 10? Material and equipment management

The materials and equipment provided by Party B shall be arranged by Party B in a planned way according to the needs of the project progress.

Article 11 Methods of settlement and payment

Allocate 80% of the completed quantities according to the monthly progress; After the project is completed and accepted, except for the 5% quality warranty, the rest of the project funds will be paid in one lump sum after the insurance stipulated by the state expires.

Article 12 Construction acceptance

1. Party B shall organize the construction according to the quality standards agreed in this contract to ensure the construction quality.

After the construction is completed, Party A shall promptly organize relevant departments to conduct preliminary acceptance of Party B's construction achievements, and enter the next working procedure after passing the acceptance; When the acceptance results show that Party B's construction quality is unqualified, Party B shall be responsible for free repair, without extending the construction period, and bear the relevant losses caused to Party A from this. Party B shall unconditionally repair the engineering quality defects proposed by the owner and the supervisor.

Party B shall cooperate with Party A in the acceptance of its work; When Party A or a third party on the construction site must cooperate with Party B, Party B shall cooperate according to Party A's instructions.

Article 14 Insurance

1. The insurance expenses shall be borne by Party A. ..

2. In the event of an insurance accident, both parties have the responsibility to take necessary measures to reduce losses; The expenses incurred shall be borne by Party B within 50,000 yuan.

Article 15 Disputes

1. During the performance of this contract, if there is any dispute between Party A and Party B, it can be settled through negotiation; Otherwise, both parties may apply to the labor department where the contract is signed for arbitration or bring a lawsuit directly to the local people's court according to law.

2. After the dispute occurs, if both parties cannot reach an agreement through negotiation, both parties shall continue to perform the contract, maintain the continuity of work and protect the completed work.

Article 16 Force Majeure

1. In case of force majeure, the contract signed by Party A and the Owner shall be implemented. When there is no corresponding standard in the contract signed between Party A and the owner, the regulations of the state or local government shall be implemented.

2. After the occurrence of force majeure, Party B shall immediately notify the person in charge of Party A's site and take measures to reduce losses as soon as possible. Party A shall assist Party B to take measures to reduce losses, and relevant expenses shall be borne by both parties.

3. The construction period delayed due to force majeure events shall be postponed accordingly.

Article 17 Supplementary Provisions

1. Construction electricity: Party A is responsible for connecting it to the tertiary distribution box on the construction site.

Article 18 Matters not covered in this contract shall be settled through fair and just negotiation.

Article 19 Contract number

This contract is made in quadruplicate, with Party A and Party B holding two copies respectively, and shall come into effect after being signed and sealed by both parties.

Party A (seal):? Party B (seal):

Person in charge: person in charge:

Year and month? sun