How did the river cut off when the Three Gorges Dam was under construction?
Extended data:
The Three Gorges Project has completed all the construction tasks in three stages, with a total construction period of 17 years.
The first stage (1993- 1997) is the construction preparation and the first stage project. The construction lasted five years, marked by river closure.
The second phase (1998-2003) is the second phase of the project, which lasted for 6 years, and was marked by the realization of initial water storage of the reservoir, power generation of the first batch of units and navigation of the permanent ship lock.
The third phase (2004-2009) is a three-phase project with a construction time of 6 years, marked by the completion of all generator sets and hub projects.
The Three Gorges Dam is located in Sandouping Town, Yichang City, Hubei Province, China, 38 kilometers away from the downstream Gezhouba Water Control Project. It is the main project of the Three Gorges Hydropower Station, the core landscape of the Three Gorges Dam tourist area, and the eastern end of the Three Gorges Reservoir. It is the largest hydropower project in the world today.
The Three Gorges Dam Project consists of the main building and diversion works, with a total length of about 3,335 m and a crest elevation of 1.85m, with a total investment of 95.46 billion yuan. 65,438+0,994,65,438+2,004 officially started construction, and the whole line was completed on May 20, 2006.
With the approval of the National Defense General, the Three Gorges Reservoir was officially started at 0: 00 on September 201year 175m for the fourth experimental water storage. By 9: 00 on June 8/kloc-0, the water level of the reservoir reached160.18m .. 20. The upstream inflow surged to 46,000 cubic meters per second. 20 12 On July 24th, the inflow of the Three Gorges Dam reached 7120,000 cubic meters per second, the largest flood peak since the Three Gorges Reservoir was built.
The dam height of Three Gorges Hydropower Station is 18 1m, the normal water level is 1.75m, the dam length is 2335m, and the static investment is1352.66 billion yuan, and 32 hydropower units with a single capacity of 700,000 kilowatts are installed. The last hydropower unit of the Three Gorges Power Station was put into operation on July 4th, 20 12, which means that the Three Gorges Hydropower Station with an installed capacity of 22.4 million kilowatts became the largest hydropower station and clean energy production base in the world on July 4th, 20 12.
20 15- 12, the Three Gorges Dam was selected as the 30 best new tourist attractions in the Three Gorges of the Yangtze River.
There is no fish migration channel in the Three Gorges Dam. After the dam closure, the four major spawning grounds of fish in the Three Gorges reservoir area disappeared, but a new spawning ground was formed in the upper reaches of Jiangjin at the tail of the Three Gorges reservoir (Hejiang-Tomi section), and the hydrological process, riverbed scouring and wetland pattern in the middle and lower reaches also changed to varying degrees.
Baidu Encyclopedia-Three Gorges Dam
People's Daily-People's Daily: Great Achievements and Valuable Experiences of Three Gorges Project
- Related articles
- Violence broke out again in Asian-American communities, and Chinese female doctors were shot dead. Why do such incidents occur frequently?
- What are the customs of Thanksgiving?
- Xixing immigrants
- Which village committees are under the jurisdiction of Jinxi Town, Yongjia County, Wenzhou City, Zhejiang Province?
- Excellent composition in hometown
- The difference between Spanish immigrants and American immigrants
- What are the hard and remote areas stipulated by the state?
- How do Australian immigrants return to China?
- Keep filming, Biden's "shrinking version" of the gun control bill can't cure the American disease!
- If you have a New Zealand permanent green card, how can parents enjoy a New Zealand pension!