How long is the construction period of Yichuan ancient water conservancy project?
9.5 years. The ancient water conservancy project is located in Qikou-Yumenkou reach of the Dabei main stream of the Yellow River. The dam site is located at the upstream of Hukou Waterfall 10 km, with Jixian County in Shanxi Province on the left bank and Yichuan County in Shaanxi Province on the right bank. It is a large-scale water control project focusing on flood control and siltation reduction, taking into account the comprehensive utilization of power generation, water supply and irrigation. The total storage capacity of ancient water conservancy projects is 65.438+02.942 billion cubic meters, and the total installed capacity of hydropower stations is 265.438+10,000 kilowatts, with an average annual power generation of 5.442 billion kWh. The dam is a roller compacted concrete gravity dam with a maximum dam height of 2 15m. The total investment of the project is 53.855 billion yuan, and the total construction period is 9.5 years.
- Previous article:Modern history of Vietnam
- Next article:Can I apply for immigration to Canada by myself?
- Related articles
- How about Jingyuan Sanyang New Energy Co., Ltd.?
- Are you a Canadian immigration program major?
- Can foreign hukou take the college entrance examination in Tianjin?
- What's the difference between Shanghai and Shenzhen?
- Why is there no night market in India?
- What major natural disasters occurred in China in 2014~2015?
- Who has the detailed information of all counties and towns in Zhangye city! ! ! !
- Who is the director of the movie Man-Han Banquet? Behind the scenes personnel introduction.
- Will infinite time have something to do with aliens, and can the future be acquired by humans?
- Interview why immigrants