Job Recruitment Website - Immigration policy - Qualifications for the preparation of immigration planning outline and report?
Qualifications for the preparation of immigration planning outline and report?
The first is the immigration physical examination stage. The main contents of the physical survey of immigrants are to reasonably determine the survey scope of land-expropriated immigrants, collect social and economic data of land requisitioned (occupied) by project construction, investigate the quantity and quality of various physical objects, and analyze the survey results.
The second stage is the outline stage of immigration planning. After the completion of the physical investigation, the design unit began to prepare the outline of resettlement planning (referred to as "planning outline"). Physical investigation is an important premise and foundation for compiling the planning outline. The planning outline mainly formulates plans and principles for resettlement and professional project handling. After completion, it needs to be approved by the provincial people's government, and the approved planning outline is used as the basis for compiling the planning and design report of resettlement. The work contents of the planning outline mainly include:
(1) environmental capacity survey;
(two) to determine the tasks, destinations and standards of immigration;
(3) Determine the mode of production and resettlement of rural migrants;
(4) Determine the overall resettlement plan;
(5) Determine the professional project treatment scheme;
(6) Analyze and predict the production and living standards of the relocated immigrants;
(7) Determine the principles of resettlement planning.
The third is the stage of resettlement planning. The planning and design report of resettlement (hereinafter referred to as the "planning report") is a more detailed planning and design of resettlement work based on the planning outline, a detailed design of resettlement, and an important basis for resettlement and compensation. Its main contents include:
(1) resettlement scheme design;
(2) Resettlement design (residential settlement);
(3) Temporary land restoration design;
(4) Design of cleaning the bottom of the reservoir;
(5) Calculation of compensation standards;
(6) Implementation of schedule design;
(7) Estimation of resettlement compensation investment.
The fourth is the implementation stage of resettlement.
- Previous article:Health care in Gore Town
- Next article:Are there Manchus in Yunnan Province?
- Related articles
- How to fill in the native place of your resume?
- The validity period of TOEFL IELTS test
- Irish nurse immigrants
- The Village Origin of Dagushan Town
- What is written in the acceptance preparation work in the application for acceptance in the water supply stage?
- How to calculate the demolition of old houses whose immigrant accounts have been moved?
- History of Guangzhou Jiaochang
- Can I apply for admission if I buy an apartment in Lanzhou New District?
- The chip is actually very simple because we didn't pay special attention to it.
- The Historical Evolution of Liangcheng County