Bati hydropower station

Among them, the basin controlled by the power station covers an area of 42,000 square kilometers, with an average flow of 553 cubic meters per second for many years. The normal water level of the first-class reservoir is 2075 meters, the maximum dam height is 100 meters, and the corresponding storage capacity is19 billion cubic meters. The installed capacity of the power station is 780,000 kilowatts, the annual power generation is 3.472 billion kWh, and the static investment of the project is 6.99 billion yuan (estimated at the 2005 price level). Planned construction period: 20/200914, with a construction period of 77 months, of which the first unit will be put into operation in 65 months.