Job Recruitment Website - Immigration policy - How many people are needed for Grade B qualification of wind power generation?
How many people are needed for Grade B qualification of wind power generation?
The power industry, which belongs to the power industry with engineering design qualification of 2 1, has six categories, including many professional wind power, thermal power, new energy, power transmission and transformation, and hydropower generation has Grade A, Grade B and Grade B. ..
Class B hydropower personnel in the power industry are equipped as follows:
Registered Electrical Engineer (Power Generation and Transformation) 2
Planning (Senior Engineer) 2
Geology (Senior Engineer) 2
Hydraulic Engineering (Senior Engineer) 4
Soil and Water Conservation (Senior Engineer) 1
Land requisition and demolition (senior engineer) 1
Engineering Construction (Senior Engineer) 2
Environmental Protection (Senior Engineer) 1
Hydraulic structure monitoring (senior engineer) 1
Hydraulic/Wind Machinery and Metal Structure (Senior Engineer) 2
Engineering Economics and Budget (Senior Engineer) 2
- Previous article:Chengdu haochi
- Next article:What is the reputation of global immigrants in Wuhan?
- Related articles
- What are the farming conditions in Russia?
- Which country's richest man immigrated to China the most?
- What is the international welder certificate?
- Immigrants. com
- Has Ma Fang emigrated?
- How to watch the live broadcast of Xinjiang 10?
- How can I go back to Australia after five years in Australia without being punished?
- Which city is Wani Village located in?
- How to become an armed police and so on.
- You need two kinds of visas to go to Malaysia. What's the difference between them?