Construction contract reference
Party A: _ _ _ _ _ _ _ _ _
Party B:
In order to implement the _ _ _ _ _ _ _ _ _ county large and medium-sized reservoir fund project for 20 years and solve the _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Project name: 20-year fund project for large and medium-sized reservoirs.
Second, the construction content and scale
1, content: _ _ _ _ _ _ _ _ _ _ human drinking water project.
2. Proportion: According to the design drawings and budget.
Third, the project cost
The total investment of the total project cost is about 340,000 yuan, and the project cost shall be subject to the audit and settlement of the actual acceptance quantities.
4. Contracting method: the work, materials and quality of the project contracted by Party B..
5. Project date: the commencement date is, the completion date is and the construction period is days.
The responsibility of party a and party b with intransitive verbs
Party A: Provide construction design drawings on time. During the construction period, Party A will send supervisors to the site for technical guidance and quality supervision from time to time.
Party B: Carry out the construction according to the construction contract and the construction design drawings provided by Party A.
Work, strictly control the quality, and accept the quality inspection and supervision of Party A during the construction period.
All expenses for rework caused by unqualified project quality shall be borne by Party B. ..
Seven. Do a good job in production safety: Party B should pay attention to safety during the construction process. Party A has nothing to do with the accidents of Party B's personnel during the construction process, and Party B is responsible for them.
Eight. Payment method of the project: After the project is completed, Party A will pay 80% of the project cost after organizing relevant departments to pass the acceptance. Pay 15% after the audit department issues the project settlement audit report. Set aside 5% as the project quality deposit. If there is no quality problem in the project after one year, the deposit will be refunded in full.
Nine, this contract shall come into effect as of the date of signature and seal by both legal persons, and will be automatically terminated after the project is completed and accepted and the deposit is returned clearly.
X this contract is made in quadruplicate, two for party a, one for party b and one for the finance bureau.
Party A: _ _ _ County Reservoir Immigration Bureau.
Legal representative:
Project leader:
Party B:
Legal representative:
Project leader:
Date of signature: year month day.
Construction contract 2
Employer (Party A):
Contractor (Party B):
According to the Contract Law of People's Republic of China (PRC), Construction Law of People's Republic of China (PRC), Model Text of Construction Contract of Construction Project and other relevant regulations, following the principles of equality, voluntariness, fairness, honesty and credit, and combining with the specific conditions of this project, Party A and Party B reached an agreement through friendly negotiation and signed this contract for both parties to abide by.
1 project name and project location
1. 1 Project name: factory wall of Wuzhi Liwei New Energy Equipment Manufacturing Co., Ltd.
1.2 Project location: Liwei Factory, Zhao Qian Village, Qiaomiao Township, Wuzhi County.
Article 2 Scope and Mode of Contract
2. 1 contract scope: the project scope includes the fence foundation and the main body. The north fence is 4 15m long, the west fence is 135m long, the south fence is 4 15m long and the east fence is 135m long.
2.2 Construction contents include: foundation cushion (60cm wide and 40cm thick 3:7 lime-soil cushion); Foundation (two layers of 50cm high brick foundation and two layers of 37cm high brick foundation); Building brick walls with a height of 2.5m in the west and north, and building houses with 60mm high and 60mm overhangs at the top; Bricks with a height of 0.85m are laid on the east and south of the two walls; Around the city wall, a battlement is built every 4 meters, and the battlement requires that the wall with a width of 37cm be built without painting.
2.3 Contracting method: contracting for work and materials.
Article 3 Contract Price
3. 1 The total contract price is
3.2 The contract price includes all expenses required for the construction, including labor, machinery, materials, construction period, quality, safety and civilization, measures, water and electricity for the construction, protection of finished products of completed projects, possible secondary handling fees for materials, management fees, profits (excluding taxes, Party B shall provide the receipt of the village committee) and other expenses.
The fourth time limit for a project
4. 1 Duration: calendar days, starting date is year, month and day.
4.2 Due to Party B's reasons, the project can't be started on schedule or stopped halfway for no reason, which affects the construction progress and the construction period will not be postponed.
4.3 In case of power failure or water stoppage due to design changes or force majeure factors not attributable to Party B, the construction period will be postponed accordingly after verification and confirmation by Party A and official seal of Party A, but Party A will not bear the losses caused by Party B's slowdown and shutdown.
Article 5 Engineering changes
According to the needs of the project, Party B shall not refuse the notice of design change issued by Party A, and carry out the construction in strict accordance with the requirements of the change. If the engineering quantity increases, the engineering cost will be calculated separately.
Article 6 Completion settlement
After the project completion experience is qualified, the settlement shall be made according to the actual acceptance of the project progress.
Article 7 Payment Terms
7. 1 Party B shall provide Party A with the account number, and Party A shall settle the account by bank transfer.
7.2 Party A shall pay the first payment when the materials enter the site. 7.3 After Party B finishes building the wall with the height of 1m, Party A shall pay the second payment.
7.4 After Party B completes the fence, Party A shall pay the third payment.
7.5 Party A shall reserve RMB as quality deposit, which shall be paid one year after the completion of the project.
Article 8 Work of Party A
8. 1 Three days before the commencement of construction, provide Party B with a confirmed construction drawing or practice description, and make on-site disclosure to Party B to handle all kinds of cooperation and coordination work involved in the construction.
8.2 Party B shall be appointed as the representative of Party A at the construction site, with the same telephone number as Party B. Supervise and inspect the quality, progress and safety of the project, and handle matters such as acceptance, alteration and registration.
Article 9 Party B's Work
9. 1 Participate in on-site disclosure of construction drawings or practice instructions organized by Party A, formulate construction plans and progress plans, and submit them to Party A for approval.
9.2 Strictly implement the construction specifications, safety operation procedures, fire safety regulations and environmental protection regulations. Carry out the construction in strict accordance with the drawings or work instructions, and make records of various quality inspections.
9.3 Party B shall provide its own pipeline facilities and bear the water and electricity costs incurred in the construction of this project.
9.4 Take all losses caused by safety accidents, public security and criminal cases during the construction of this project, and bear all legal responsibilities.
Article 10 project quality
10. 1 project quality: qualified (in line with current GJ specifications and quality requirements).
10.2 meets the design requirements.
10.3 According to relevant laws and regulations, Party B shall bear unlimited responsibility for the quality of the contracted projects. 10.4 Every time Party B completes a project, it must be accepted by Party A before entering the next working procedure. 10.5 Party B shall accept Party A's supervision and inspection of the project quality at any time, and Party B shall bear all responsibilities and expenses for the losses and delays caused by Party B's construction quality problems.
10.6 party b must abide by the engineering quality management measures formulated by party a, and seriously rectify and reply the quality problems found in the three-level inspection organized by the company.
10.7 For the claim caused by quality problems after the completion and acceptance of the project contracted by Party B, Party A shall directly deduct it from the quality guarantee, and Party B shall pay the insufficient amount separately.
10.8 If there are defects in the construction quality of Party B, resulting in major defects in the construction quality or unqualified acceptance, Party B shall bear all responsibilities and expenses.
Article 1 1 project acceptance
1 1. 1 In case of quality accident due to Party B, the rework cost shall be borne by Party B, and the construction period shall not be postponed. 1 1.2 After the project is completed, Party B shall submit an application for completion acceptance to Party A. Party A shall organize relevant departments to conduct joint acceptance within 5 days after receiving the acceptance application. After the acceptance, the handover formalities shall be handled.
Article 12 safety and civilization
12. 1 Before the construction, Party B must make safety technical disclosure to ensure the safe use of electricity, safety protection and negative.
Be responsible for testing the construction machinery and tools entering the site to ensure their safety.
12.2 party b must provide three-level safety education and safety knowledge training to workers at least twice a week. 12.3 Party B shall bear the responsibilities and expenses caused to Party A and the third party by Party B's violation of safety operation regulations.
12.4 party b shall bear all the responsibilities and expenses of the safety casualty accidents in the process of construction management.
12.5 Party B shall ensure the civilized construction on the construction site, and the construction waste and domestic waste shall be cleared out at any time. 12.6 When Party B is working on power equipment, transmission lines, underground pipelines, inflammable and explosive areas and near main roads along the street, it shall submit a safety protection plan to Party A, and the expenses for implementing the protection measures shall be borne by Party B. ..
13 material supply
13. 1 Materials shall be purchased by Party B, and those that do not meet the quality requirements shall not be used. If it has been used, except for unconditional rework, Party B shall be responsible for the losses caused to the project.
13.2 During the construction process, Party A or the supervisor has the right to randomly check the unused materials purchased by Party B. If it is found that the materials and equipment used by Party B do not meet the quality standards agreed in the contract, Party B shall not use them. The used materials must be dismantled and redone, and the unqualified materials will be removed from the site, and Party B shall be responsible for the losses and delays caused thereby.
Article 14 Liability for breach of contract
14. 1 Party B shall not subcontract or illegally subcontract, otherwise, Party B shall pay Party A liquidated damages of 10% of the contract price. Previous 1 2 3 4 5 6 7 8 9 Next page
- Related articles
- How to apply for a visa to go abroad for the first time?
- Baby's full moon banquet sends a circle of friends.
- Who can apply for the joint entrance examination of public security colleges?
- Will Baihetan Hydropower Station be accessible after its completion?
- The role of Beidou global satellite navigation system industry and the regional role of Beidou global satellite navigation system
- Hongwu Evonne immigrants
- Some rural people buy a house in the city. Why can they be excluded by all their neighbors?
- The origin of Wellington steak?
- Which district does Sihui Dawang in Zhaoqing City, Guangdong Province belong to?
- Hefei human geography