Brief introduction of Tankeng Hydropower Station

The power station is located near Tankeng Village, Beishan Town, where the Oujiang River in qingtian county, Zhejiang Province is cut off, 75km away from Jingning, 92km away from Wenzhou and 0/07km away from Lishui/Kloc.

The normal water level of the reservoir is 160m, with a total storage capacity of 465438+55m cubic meters, corresponding to the reservoir area of 70.93km2, the backwater length of the main stream of 80km, the control basin area of 3,330km2, the regulating storage capacity of 265438+26m cubic meters, the flood control storage capacity of 350m cubic meters, and the dam crest elevation of1765,438. There are six spillway tunnels, with the maximum flood discharge 14334 cubic meters per second, installed capacity of 600,000 kilowatts, and annual average power generation10.35 million kilowatts. The total investment is 4.83 billion yuan. The construction period is 5 years (2004 -2009). The project involves 65,438+00 townships in qingtian county and Jingning County, and 80 administrative villages along the river, involving 50,000 immigrants.

Since the construction of Tankeng Hydropower Station started in 2003, under the correct leadership of the provincial party committee and the provincial government, under the careful guidance of the provincial and municipal immigration authorities, and with the strong support of the relevant provincial and municipal departments, the local government has made careful planning, careful deployment and solid development, and steadily promoted the resettlement and reconstruction of immigrants at all levels. With the joint efforts of cadres and the masses, after more than five years' efforts, the resettlement task of Tankeng immigrants has been basically completed and realized.