Job Recruitment Website - Job seeking and recruitment - Refer to the template of the second sublease contract of the house.
Refer to 1 for the template of the second sublease contract.
Party A (Employer)
Party B (contractor):
Accord
Refer to the template of the second sublease contract of the house.
Refer to 1 for the template of the second sublease contract.
Party A (Employer)
Party B (contractor):
Accord
Refer to 1 for the template of the second sublease contract.
Party A (Employer)
Party B (contractor):
According to the Contract Law of People's Republic of China (PRC) and relevant laws and regulations. In order to protect the legitimate rights and interests of both parties, on the basis of equality and voluntariness, Party A and Party B reached the following contract on Party B's lease of the factory from Party A through consultation:
1. Party A voluntarily leases the factory building located in the area of square meters, including machinery and equipment and some auxiliary rooms to Party B for use. Party B has fully understood the workshop to be leased by Party A and is willing to contract the workshop.
Two, the lease is used for stone processing and sales, and shall not be used for other purposes. During the lease period, Party B shall not operate in the name of Party A. ..
3. The lease term is from to.
The rent for the first five years is RMB 10,000 per year, and RMB 10,000 per year for the next five years. Payment method: once a year, once a year in the first month. (The actual price does not include water, electricity, heating, gas, equipment and other expenses, excluding taxes, and all taxes and fees shall be borne by the lessee).
Verb (abbreviation of verb) Since the signing of the lease contract, Party B shall pay Party A RMB 6,543,800+500,000 as the lease deposit. After the expiration of the contract, if Party B does not breach the contract, Party A shall return it to Party B without interest. If Party B has a defaulting bank,
Therefore, Party A will compensate Party A for 6,543.8 yuan+500,000 yuan as liquidated damages instead of returning the lease deposit paid by Party B..
Intransitive verb Party B shall perform the following obligations:
1. Party B shall bear all expenses arising from the production and operation during the lease period, such as utilities, taxes, personnel recruitment, wages, equipment maintenance, plant maintenance, transformer maintenance, etc. Party B shall be responsible for its own profits and losses and conduct independent accounting, so the responsibilities arising therefrom have nothing to do with Party A. ..
2. Party A shall provide transformers for Party B's use, and Party B shall pay the generated electricity fee to Party A on a monthly basis according to the electricity meter (electricity bill) provided by Party A. All government fees such as taxes (including national tax and local tax), stone powder treatment fee and pollution control fee shall be remitted by Party A, and Party B shall pay it to Party A in time within seven days after the payment is generated.
3. Party B shall bear the labor disputes and industrial accidents in the production process. If losses are caused to Party A due to Party B's industrial accident, Party A has the right to fully recover from Party B. Party B shall also bear other losses caused to Party A, including attorney's fees, notarization fees, evidence collection fees and legal fees.
4. The contracting workshop shall not be carried out in a way that affects the safety of use. If it is really necessary to modify it, it must be approved by Party A, and the expenses shall be borne by itself. The ownership belongs to Party A and will be transferred to Party A free of charge upon the expiration of the lease or the termination of the contract.
5. Stones and sundries shall not be piled around the leased plant, so as not to affect the traffic of vehicles and personnel.
6. Without the written consent of Party A, the leased plant shall not be sublet, lent, sublet or used interchangeably with others, and the leased plant shall not be mortgaged. It is also not allowed to transfer the factory to others by partnership or joint venture. The leased plant shall not be used in industrial and commercial registration.
7. Do not change the lease purpose without authorization, do not engage in illegal activities such as bootlegging, manufacturing drugs, selling fake goods in the leased plant and site, do not produce, process or store inflammable and explosive articles, and do not store, produce or sell harmful articles that corrode, pollute or damage the surrounding environment, real estate and ancillary facilities and equipment. Production and operation must meet the requirements of urban management and environmental protection.
8. Consciously abide by relevant state regulations, obey the management of Party A, and accept the supervision and inspection of relevant departments of the local people's government.
9. The workshop shall publish the safety operation instructions of the equipment. If Party B violates the operating rules, Party B shall bear all responsibilities for safety accidents or hidden dangers, and Party A shall not be responsible for fire control, electricity consumption, production and processing, workers, their families and related personnel during the lease period. ..
Representative of Party A (signature): Representative of Party B (signature):
(seal): (seal):
Signing time: year month day
Housing secondary sublease contract template reference 2
Party A (Lessor):
On behalf of:
Address:
Contact telephone number:
Party B (lessee):
ID number:
Address:
Contact telephone number:
Party C (Lessee):
On behalf of:
Address:
Contact telephone number:
Through friendly negotiation, Party A, Party B and Party C have reached the following agreement on subletting the house:
I. Sublease of the house
Party A leases the house to Party B, and agrees that Party B will sublease its own-(the total area of the house is-㎡) to Party C as a business office building.
Party B rents Party A's house and agrees to sublet it to Party C. ..
When Party C rents Party B's house for the second time, it enjoys the following rights and obligations.
II. Lease Term/Lease Price/Payment Method
1. The term of Party C's lease of this house is year month day, and the monthly rent is RMB.
2. The rent shall be paid by. Rental housing must be paid before use (that is, pay in advance). On the date of signing this agreement, Party C shall pay the first rent to Party A, and Party C shall pay the rent for the next month in advance.
3. Deposit: Party C shall pay a deposit of RMB (with receipt) to Party A before leasing; During the lease period, the deposit cannot offset the house or property fee. When Party C cancels the lease, it shall go to the property management office to settle all the expenses of the property according to the facts, go through the check-out procedures, and Party A shall refund the deposit.
4. Before the signing date of the house lease agreement, Party B shall settle all the expenses of the house with the property management office; From the date of signing the house lease agreement, Party C shall pay all the expenses during the lease period to the Property Management Office.
Three. Services and applications
During the lease period, the Property Management Office provides routine maintenance services to Party C, and Party C shall apply to the Property Management Office, and the expenses shall be borne by Party C. ..
Four, door lock management
For the safety of Party C, after Party C pays the lease deposit and down payment, Party C will assemble a new door lock and keep the new key.
Verb (abbreviation of verb) liability for breach of contract
1. During the lease term, if the agreement needs to be terminated early due to Party A's reasons, Party A shall notify Party C 30 days in advance, and Party A shall pay Party C the rental as a penalty.
2. During the lease term, if the agreement needs to be terminated early due to Party C's reasons, Party A shall be notified 30 days in advance, and Party C shall pay the rental to Party A as liquidated damages.
3. If Party C fails to pay the rent to Party A within the time limit, Party A has the right to charge a late fee of% of Party C's default amount on a daily basis. If Party C fails to deliver the house over 10 days, it shall be deemed that Party C voluntarily renounces the lease right of the house, and Party A has the right to take back the house. After Party A repossesses the house, all the office facilities in the house shall be handled by Party A itself, and Party C has no right to interfere.
Mediation of intransitive verb disputes
Any dispute arising from the execution of this Agreement shall be settled by both parties through consultation; If negotiation fails, it shall be submitted to the people's court for settlement.
Seven. Other agreements
1. Party A guarantees that it is the only operator who has the right to legally lease the right to use the house and the only operator who has the right to collect rent from Party C. Anyone who wants to collect rent from Party C on behalf of Party A must have a written authorization from Party A. ..
2. Party C shall not destroy the original structure of the room during the lease period and when the lease is cancelled; If there is any damage, Party B and Party C shall pay compensation according to the price.
3. During the lease period, Party C shall consciously abide by the property management regulations of this building. If it is necessary to rebuild the house, a written application should be submitted to the property management office in advance, and the written consent of the owner and the property management office can be obtained before implementation. When Party C withdraws the lease, the fixed decoration at its own expense shall not be removed or destroyed.
4. Without the written consent of Party A, Party C shall not sublet, transfer or lend it to a third party, otherwise Party A has the right to terminate the agreement and recover the right to use the house.
5. Within the day before the expiration of this Agreement, Party A shall send a notice of renewal to Party C; If Party C renews the lease, it shall renew the lease agreement within 7 days after the renewal notice is issued. Under the same conditions, Party A will give priority to Party C's renewal. Failing to sign the contract within the time limit shall be deemed as Party C's automatic waiver of the lease renewal.
Eight. Matters not covered in this contract shall be implemented in accordance with relevant national laws and regulations.
Nine. This agreement is made in triplicate, with Party A, Party B and Party C holding one copy respectively, which shall come into effect after being signed and sealed by the three parties, and each copy has the same legal effect. The handwritten or printed part of this agreement, as well as the attachments based on this agreement, have the same legal effect as this agreement.
Seal of Party A:
Legal representative or authorized representative:
Date: Year Month Day
Signature and seal of Party B:
ID number:
Date: year month
Seal of Party C:
Legal representative or authorized representative:
Date: year month
Housing secondary sublease contract template reference 3
Lessor (Party A):
Lessee (Party B):
According to the relevant regulations of the state, on the basis of voluntariness, equality and mutual benefit, Party A and Party B have reached an agreement and signed a contract on matters related to Party A's lease of its legally owned factory to Party B as follows:
1. Leased Factory: The factory leased by Party A to Party B is located in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ The plant type is _ _ _ _ _ _ _ _ structure.
Two. The payment date and lease term of the factory building are 1, and the renovation date of the factory building is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2. The lease period of the workshop starts on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3. After the lease expires, Party A has the right to take back the leased plant, and Party B shall return it as scheduled. If Party B needs to continue the lease, it shall submit a written request to Party A three months before the lease expires, and sign a new lease contract after Party A agrees. ..
Three. Payment method of rent and deposit 1. Party A and Party B agree that the daily rent per square meter of the factory building area is RMB. The monthly rent is RMB, and the annual rent is RMB.
2. The annual rent will remain unchanged for the first year, and will increase by 3%-5% from the second year. 3. After Party A and Party B sign the contract, Party B shall pay Party A the factory lease deposit, that is, one month's rent. The rent shall be paid in advance for three months, and the payment date shall be paid to Party A before the 5th of the payment month.
Other expenses 1. During the lease period, Party B shall bear the communication expenses such as water, electricity, gas and telephone when using the factory, and pay within three days after receiving the receipt or invoice.
2. During the lease term, Party B shall pay the monthly property management fee, and the daily property management fee is RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Five, the factory use requirements and maintenance responsibilities
1. During the lease period, if Party B finds that the factory building and its ancillary facilities are damaged or damaged, it shall promptly notify Party A for maintenance; Party A shall carry out maintenance within 3 days after receiving Party B's notice. If the maintenance is overdue, Party B can repair it on behalf of Party A, and the expenses shall be borne by Party A. ..
2. During the lease period, Party A shall ensure that the plant and its ancillary facilities are in normal use and safe state. Party A shall notify Party B three days in advance to inspect and maintain the factory. During the inspection and maintenance, Party B shall cooperate. Party A shall reduce the impact on Party B's use of the plant.
3. If Party B needs to decorate or add ancillary facilities and equipment, it shall obtain the written consent of Party A in advance. Where approval from relevant departments is required according to regulations, Party A shall report to relevant departments for approval before proceeding.
Representative of Party A (signature): Representative of Party B (signature):
(seal): (seal):
Signing time: year month day
Housing secondary sublease contract template reference 4
Lessor: (hereinafter referred to as Party A)
Lessee: (hereinafter referred to as Party B)
According to the Contract Law of People's Republic of China (PRC) and the Regulations on Hearing of Urban House Lease, Party A and Party B, on the basis of equality, voluntariness, fairness, honesty and credit, reached an agreement through consultation that Party A sublets the leased factory to Party B for use according to law, and Party B pays the rent to Party A, and entered into this contract.
Article 1 Location, area and use of the leased house
1. 1 Party A will locate and lease it to Party B for use. Both parties confirm that the area of the leased house is
1.2 If it is necessary to change the use of the leased property, it shall obtain the written consent of Party A, and Party B shall report the procedures required for changing the use according to the relevant regulations of the government or economic association (village committee), and all expenses paid for changing the use shall be borne by Party B. ..
Article 2 Lease Term and Delivery Term
2. 1 The lease period starts from the date of the month and ends on the date of the month.
2.2 Before the expiration of the lease term, with the consent of Party A, Party A and Party B will re-sign the lease contract on related lease matters. Under the same lease conditions, Party B enjoys priority.
2.3 From the effective date of this contract, Party B agrees to lease the leased premises and facilities according to the current situation.
Article 3 Rent and expenses
3. 1 Party B shall pay the rent every month, and Party B shall remit the rent to the bank account designated by Party A every month. If Party B fails to pay the rent, it shall pay a late fee to Party A, the amount of which is: the number of days in arrears multiplied by five thousandths of the total rent in arrears.
3.2 Party B shall pay the deposit (RMB) (30%), that is, when the defaulting party expires, Party A will unconditionally return the deposit to Party B within days after Party B pays all the rent, property management fees and all expenses arising from this lease to Party A and assumes the responsibilities agreed in this contract (such as returning the leased property to Party A according to the provisions of this contract).
3.3 The management fee is RMB per square meter per month. Party b shall pay the management fee to party a before the th of each month. If the management fee is overdue, Party A shall be paid a late fee, the amount of which is: the number of days in arrears multiplied by five thousandths of the total rent in arrears.
3.4 After this contract comes into effect, Party A starts to apply for power supply expansion, and the fees payable for power supply expansion, including but not limited to expansion, shall be borne by Party B. Party B shall pay relevant fees to Party A when applying for relevant procedures.
Article 4 Facilities, maintenance and repair requirements of factory buildings
4. 1 Party B shall reasonably use and care for the plant and its ancillary facilities. If the house is damaged or damaged due to Party B's improper or unreasonable use, Party B shall be responsible for the maintenance. If Party B refuses to repair, Party A can repair on behalf of Party B, and the expenses shall be borne by Party B. ..
4.2 When Party A conducts regular inspections, Party B shall cooperate. Any consequences caused by Party B's obstruction of maintenance shall be borne by Party B..
4.3 If Party B needs to decorate, expand, rebuild or add ancillary facilities and equipment, it must do so in advance.
Party B shall notify Party A within days, submit the renovation design scheme, obtain Party A's consent and approval, and apply to the relevant departments for consent and approval before proceeding, otherwise Party B shall bear all responsibilities for the consequences of unauthorized decoration, expansion, reconstruction and addition without Party A's consent.
4.4 When Party B discovers the damage or failure of the factory building and its ancillary facilities, it shall notify Party A in advance for maintenance.
4.5 When the lease expires or the contract is terminated prematurely, Party B shall clean up the leased property, complete the relocation and return the leased property to Party A. If Party B fails to clean up the sundries when returning the leased property, Party A shall be responsible for the expenses incurred by cleaning up the sundries.
Article 5 Fire safety and exemption clauses
5. 1 During the lease period, Party B shall strictly abide by the Fire Protection Regulations of People's Republic of China (PRC) and the relevant systems of _ _ _ _, and actively cooperate with Party A to do a good job in fire control, otherwise all responsibilities and losses arising therefrom shall be borne by Party B. ..
5.2 Party B shall allocate fire extinguishers in the leased property according to relevant regulations, and shall not use the fire-fighting facilities in the building for other purposes.
5.3 If it is really necessary to carry out Grade I temporary hot work (including open flame work such as electric welding and wind welding) in the leased property due to maintenance and other matters, it must be approved by Party A and the competent fire department.
5.4 Party B shall be fully responsible for the fire safety of the leased house according to the relevant regulations of the fire department. Party A has the right to check the fire safety of the leased premises within a reasonable time agreed by both parties, but shall notify Party B in writing in advance. Party B shall not unreasonably refuse or delay giving consent.
5.5 If Party A can't continue to perform this contract due to the revision of government laws and regulations on lease behavior or due to special reasons of Party A, it shall notify Party B one month in advance, and Party A may be exempted from liability.
5.6 If either party is unable to perform this contract due to natural disasters such as earthquake, tsunami and war or other unforeseeable force majeure whose occurrence and consequences cannot be prevented or avoided, the party with the above-mentioned force majeure shall immediately notify the other party, and shall provide the details of the force majeure and the supporting documents of the reasons for the failure, partial performance or delayed performance of this contract within 30 days. The certificate shall be issued by the notary office in the place where the force majeure occurred. If the certificate issued by the notary cannot be obtained, other powerful certificates shall be provided. The party suffering from force majeure is therefore exempted from responsibility.
Article 6 Early termination of the contract
6. 1 During the lease period, if Party B fails to pay the rent or property management fee that exceeds the amount paid by Party A in writing within five days, Party A has the right to stop Party B from using the relevant facilities in the leased property, and all losses (including but not limited to those of Party B and the sub-tenant) caused thereby shall be borne by Party B. ..
6.2 If Party B fails to pay the rent or the property management fee exceeds the contract. This contract shall be automatically terminated from the date when Party A notifies Party B by fax or letter. Party A has the right to retain the property in Party B's leased property, and the retained property applied for auction can be used to offset all expenses arising from Party B's lease behavior within five days after the written notice of termination of the contract is issued.
6.3 Without the written consent of Party A, Party B shall not terminate this contract in advance ... If it is really necessary for Party B to terminate this contract in advance, it shall notify Party A in writing months in advance and complete the following procedures before terminating this contract in advance: a. Return the leased house to Party A; B. Pay off the rent, overdue fine and other expenses arising from this contract during the lease term; Party B shall pay compensation equivalent to _ _ _ times of the current month's rent to Party A on or before the day before the early termination of this contract. Within five days after Party B completes the above obligations, Party A shall return the lease deposit of Party B to Party B without interest.
Article 7 Termination of the Contract
If this contract is terminated or expired in advance, and Party A and Party B fail to reach a renewal agreement, Party B shall move out of the leased property and return it to Party A on the date of termination or expiration of the lease term ... If Party B fails to move out or return the leased property within the time limit, it shall pay double rent to Party A, but Party A has the right to notify Party B in writing not to accept double rent, and to take back the leased property and forcibly remove the items in the leased property without supervision.
Article 8 Additional clauses
8. 1 If Party B does not move out, the furniture and sundries left behind will be regarded as abandoned and can be disposed of by Party A. ..
8.2 If the lease is cancelled after the expiration of the lease period or due to Party B's (one party's) responsibility, the accessory decoration of the factory building shall be owned by Party A ... unless otherwise agreed by both parties.
Article 9 the validity of the contract
This contract shall come into effect after being signed and sealed by both parties and receiving the deposit paid by Party B. ..
Representative of Party A (signature): Representative of Party B (signature):
(seal): (seal):
Signing time: year month day
Housing secondary sublease contract template reference 5
Sub-lessor: (hereinafter referred to as Party A)
Lessee: (hereinafter referred to as Party B)
According to the Contract Law of People's Republic of China (PRC) and the Regulations of Beijing Municipality on House Lease, on the basis of equality, voluntariness, fairness, honesty and credit, Party A and Party B have reached the following agreement on matters such as the subletting of the legally rented house by Party A to Party B, the income and the payment of rent by Party B to Party A through consultation. ..
First, the situation of subletting the house
1. The public housing (public housing/non-public housing) legally rented by Party A in the residential area at StreetNo. has been (notified in writing to the lessor of public housing/agreed in the sublease contract/obtained the written consent of the lessor) in the urban area, and Party A subleases part (all/part) of the leased housing, namely, Room _ _ _ _ (hereinafter referred to as the house) to Party B ..
2. The scope of use and conditions of the shared or contracted part of the house; The status of existing decoration, ancillary facilities and equipment shall be agreed by both parties in annexes (2) and (3) of this contract. Party A and Party B agree to use Annexes (2) and (3) as the acceptance basis for Party A to deliver the house to Party B and for Party B to return the house to Party A after the expiration of this sublease.
Second, the purpose of the lease
1. The purpose of Party B's renting out the house is _ _ _ _ _ _ _ _.
2. Party B guarantees that it will not change the use of the house without prior written notice to Party A, and before Party A obtains the written consent of the lessor according to the lease contract and reports it to the relevant departments for approval as required.
Three. Rent, payment method and time limit
1. Party A and Party B agree that the total monthly rent of the house is (_ _ currency) _ _ yuan. The rent of the house will remain unchanged for _ _ _ years/months. Both parties can negotiate to adjust the rent from. Relevant adjustment matters shall be agreed by both parties (Party A/Party B) in the supplementary terms.
2. The way for Party B to pay the rent is as follows: _ _ _ _ _ _.
Four. other charges
Water, electricity, gas, property management and other expenses during the sublease. The expenses incurred by Party B in using the house shall be borne by both parties. Other related expenses shall be calculated separately.
Five, housing use requirements and maintenance responsibilities
1. During the sublease, if Party B finds that the house and its ancillary facilities are damaged or damaged, it shall notify Party A at the time of application; Party A shall carry out maintenance as agreed in the lease contract.
2. Party B shall reasonably use and care for the house and its ancillary facilities. If the house and its ancillary facilities are damaged or broken down due to improper or unreasonable use by Party B, Party B shall be responsible for maintenance. If Party B refuses to repair, Party A or the lessor can repair it for him, and the expenses shall be borne by Party B.. ..
3. During the sublease, Party A guarantees that the house and its ancillary facilities and equipment are in normal use and safe state. During the inspection and maintenance, Party B shall cooperate. If Party B obstructs the maintenance, Party B shall bear all consequences.
4. During the sublease, if the lessor needs to rebuild, expand or decorate the house, Party A has the obligation to inform Party B. The specific matters can be agreed by both parties in the terms.
5. If Party B needs to decorate the house or add ancillary facilities and equipment, it shall notify Party A in advance, and Party A shall obtain the written consent of the lessor according to the lease contract. In accordance with the provisions of the need for approval by the relevant departments, it shall be reported to the relevant departments for approval before it can be carried out.
Sixth, the state of the house when it is returned.
1. Unless Party A agrees to Party B's lease renewal, Party B shall pay (_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
2. When Party B returns the house according to this contract, it shall be checked and accepted by Party A, and its respective expenses shall be settled before going through the formalities of rent withdrawal.
Seven. Dissolve the provisions of this contract
1. During the sublease, if the lease contract is dissolved, this contract will also be terminated. If Party B suffers losses due to the termination of this contract, Party A shall pay Party B a penalty of twice the monthly rent. If the liquidated damages paid are not enough to make up for Party B's losses, Party A shall also be responsible for compensation. Except in the following cases:
(a) to recover the land use right of the occupied area of the house in advance according to law;
(two) due to social and public interests or the needs of urban construction, the house is expropriated or demolished according to law.
(3) The house is damaged, lost or identified as a dangerous house;
(4) Party A has been informed that the house has been mortgaged before renting, and is now being punished.
2. Party A and Party B agree that under any of the following circumstances, one party may notify the other party in writing to terminate this contract. The breaching party shall pay the other party a penalty of 2 times the monthly rent; If losses are caused to the other party, and the liquidated damages paid are insufficient to make up for the losses of Fu Yifang, the difference between the losses and liquidated damages shall also be compensated.
This contract is made in duplicate. Party A and Party B each hold one copy, which has the same effect.
Party A (signature): Party B (signature):
Year, month, sun, moon, sun.
For the template of secondary sublease contract, please refer to related articles:
★ Sub-lease Contract of Standard Model House
★ Template Agreement of House Sublease Contract
★ Individual house sublease contract template
★ Template of standard house sublease contract
★ House sublease contract template 2020
★ Simple Model House Sublease Contract
★ simple houses sublease contract template
★ Model of Individual House Sublease Contract
★ Three standard versions of demonstration text of individual housing sublease contract
★ 4 samples of sublease contract
- Related articles
- Are there any companies that recruit graphic design apprentices?
- How many stars does Putian Haiyuan International Hotel have?
- Wuhan western food chef salary
- What are the jobs of roads and bridges?
- How about Fujian Quanzhou Li Jiafu Furniture Co., Ltd.?
- Beautiful campus fourth grade composition 300 words
- Where is the factory of Dongfeng Honda?
- Does Hefei Rubik's Cube Pharmaceutical Co., Ltd. have a weekend off?
- How to write the job description?
- What school will be built after the demolition of Laozhou Gudui in Hefei?