Job Recruitment Website - Job seeking and recruitment - Safety production operation rules for garment workers?

Safety production operation rules for garment workers?

1. Wear tools as needed. Long hair will endanger the safety of operators, so roll it up or put on a hat.

2. Before starting the machine, strictly check whether all parts of the machine are in normal state, and check whether tools, fixtures and measuring tools are in good condition.

3. No matter whether the equipment is running or not, it is forbidden to tamper with the equipment parts and supporting devices. If maintenance is needed, professional personnel should be informed to maintain it, and unauthorized disassembly is strictly prohibited.

4. When operating the machine, a trial run must be carried out; Only after it is confirmed to be safe and normal can it be operated.

5. When feeding by hand, it is forbidden to put your fingers into the needle protector. Fingers, head (hair) and clothes should be far away from the upper wheel, belt and motor. In addition, don't put anything around the upper wheel, belt and motor.

6. Don't put your finger near the rotating shuttle when it is running at high speed; When replacing the spool, please turn off the power supply of the equipment.

7. When the machine is running, don't put your hands in the take-up cover; Don't put your fingers into the machine when lifting the nose.

8. When lifting the nose, moving the belt cover, hand protector or safety device, the machine must be shut down.

9. Sewing machines using servo motors; When the machine is not running, the motor has no sound. In order to prevent the machine from suddenly starting and causing accidents, be sure to turn off the power supply.

10. In case of power failure, maintenance, adjustment, cleaning, threading and needle replacement, be sure to turn off the power supply for safety confirmation.

1 1. When maintaining the equipment, be careful not to let the lubricating oil contact the eyes, skin and other parts; Prevent injury.

12. When you leave the machine after operation, pay attention to turn off the machine in time, and remember to turn off the power when working.

For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd