Job Recruitment Website - Job seeking and recruitment - Manual labor contract

Manual labor contract

Model manual labor contract (6 selected articles)

In a progressive society, more and more things need contracts, and it is also very necessary to sign contracts. Do you know what the main contents of the contract are? The following are the samples of labor contracts (6 selected ones) I collected for you, hoping to help you.

Employer of Labor Contract 1: (hereinafter referred to as Party A)

Contractor: (hereinafter referred to as Party B)

Party A has built a Di Chin business hotel integrating catering, entertainment and accommodation, and Party B has contracted to operate catering series. Based on the principle of mutual benefit, Party A and Party B have reached the following contract terms on the rights and obligations of both parties through friendly negotiation:

1. Six restaurants and 65,438+0 kitchens (with an area of about 65,438+080 square meters) on the first floor of Di Chin Hotel owned by Party A, with complete ancillary facilities and decoration, have been delivered to Party B for business use. Tableware, dining table, dining chair, air conditioner and other related electrical equipment shall be prepared by Party B (see Party B's self-raised property list for details).

Two. The contracted operation period of Party B starts from _ _ _ _ _ _

Three. During the contract operation period, Party B shall pay Party A the contract fee of RMB 30,000 yuan every year.

Four. Party B's contract fee shall be paid to Party A in one lump sum on _ _ _ _ every year. (Subject to receipt)

5. During the contracted operation period, all kinds of licenses, certificates and taxes payable by the relevant departments of industry and commerce, taxation and health shall be handled by Party B and paid by Party A independently.

6. Both Party A and Party B use the same master meter, and Party B each bears one third of the water and electricity charges every month.

7. During the contracted operation period, without Party A's consent, Party B shall not subcontract or transfer other people's business, and at the same time maintain and repair various facilities and property delivered by Party A to Party B. ..

Eight, after the expiration of Party B's contract, both parties can voluntarily renew the contract. If Party A stops contracting or Party B stops contracting, one party must notify the other party three months before the expiration of this contract.

9. After both parties terminate the contract, the tableware and other related equipment (see property list) prepared by Party B can be disposed of by itself, or handed over to Party A after consultation with Party A..

X. For matters not covered in this contract, both parties can make additional clauses after negotiation, and the supplementary clauses have the same effect as this contract.

XI。 If you unilaterally violate the terms of this contract, you shall pay the other party a penalty of 5,000 yuan.

12. This contract is made in duplicate, with each party holding one copy, and shall come into effect as of the date of signature.

Party A (official seal): _ _ _ _ _ _

Party B (official seal): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Labor Contract 2: Party A: (hereinafter referred to as Party A)

Party B: (hereinafter referred to as Party B)

In order to complete the A4 Bid Section of Wuji expressway, this contract is signed on the basis of equality, mutual benefit, good faith and voluntariness in accordance with the Economic Contract Law of the People's Republic of China and the Regulations on Construction Project Contracting, in the spirit of division of responsibilities and mutually beneficial cooperation.

I. Project, Name and Quantity:

Second, the subcontract unit price:

Digging pile is calculated according to the original ground of the pile location, and the unit price is calculated in meters, with soil mixed with stone layer, 1.2m pile element/linear meter. It must be confirmed by both parties, subject to the on-site visa. The unit price of the project contracting agreement is a one-time price, and the comprehensive contract unit price (excluding tax) includes all ancillary works such as manual excavation, wall protection equipment and materials, water, electricity and transportation.

Third, the time limit for a project requirements:

Otherwise, all consequences and losses arising therefrom shall be borne by Party B. ..

4. Party B must carry out the construction according to the construction specifications and relevant national standards, and the depth and size of digging holes must meet the design requirements, and accept the quality inspection of Party A. For rework that fails to meet the quality standards, Party B must bear all relevant expenses.

5. Party B must strictly implement the safety operation rules to ensure 100% safety accidents. If a safety accident is caused by an operational error, and all economic losses are caused thereby, B.

Rights and obligations of intransitive verbs;

1. Party A is responsible for three links, one leveling, surveyor's model, technical disclosure, all-round supervision of various contacts with the owner and supervisor during the construction process, and coordination of the relationship between the local government and the local people.

2. Party B is responsible for digging pile construction.

Seven, project payment settlement:

After the bored pile meets the requirements of Party A, it shall be paid in full after obtaining the measurement visa from the owner.

Eight, other terms:

1. Site representative dispatched by Party B during the construction period.

2. Party B shall not engage in illegal economic activities in the name of Party A's subordinate units, otherwise it shall bear the legal consequences arising therefrom.

3. In case of disputes in the future, if it is difficult for both parties to reach an agreement through coordination, they shall reply to the Nanjing court's ruling.

This contract is made in quadruplicate, three for Party A and one for Party B, and shall come into effect as of the date of signature by both parties. After the project is completely completed and settled, the contract will automatically become invalid after the payment is received.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Labor Contract III Party A:

Name of Party B:

1. According to the provisions of the national labor law, Party A and Party B voluntarily sign this agreement through equal consultation to establish labor relations. Both parties shall abide by the terms listed in this contract.

Second, the contract content:

1. Through equal consultation between Party A and Party B, Party A agrees to contract the kitchen project of Qingjiang Holiday Villa in Changyang County, Yichang City to Party B for management, and engage in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. The gross profit margin of monthly completion cost is between _ _ _ _ _ _ _.

3. The _ _ _ _ _ _ day of each month is the salary payment date, and the salary payment shall not be delayed by two days at most. After two days, the employee has the right to terminate this contract and protect his rights and interests according to law. In other cases, the labor contract must be dissolved 65,438+05 days in advance and reported to Party A for approval before the account can be closed and the employee can leave.

4. During the contract period, if Party B fails to meet the kitchen management requirements specified by Party A and needs to terminate the labor contract in advance, Party A shall notify Party B in writing 15 days in advance. If the labor contract must be terminated without notifying the other party in advance, the party proposing to terminate the contract shall compensate the other party for economic losses according to the validity period of 15 days.

5. Term of the labor contract. The contract is valid for _ _ _ _ _ years (months). The effective date is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Three. Agreement content:

1. On the premise that Party B's personnel operate various facilities and equipment in a standardized manner during working hours and working areas, Party A shall be responsible for the safety of life and property of Party B's personnel.

3. In case of accidental injury during working hours, Party A shall be responsible for treatment or reimbursement of treatment expenses. Provide Party B's personnel with meals, accommodation, bedding and articles needed for work (such as work clothes and appliances) free of charge.

4. Party B's personnel shall abide by various management rules and regulations formulated by Party A, and strictly abide by labor safety, food hygiene, production technology, operating procedures and production work specifications. Take good care of Party A's property, abide by professional ethics, actively participate in various trainings organized by Party A, and improve ideological awareness and professional skills. If Party B's personnel violate labor discipline, Party A may give warning or punishment according to the rules and regulations of the unit.

5. During the working period, Party A shall manage Party B through supervision and performance appraisal, and Party A shall not participate in or intervene in the kitchen management for any excuse or reason. Party A and Party B solve problems in information communication, kitchen management, problem handling and management methods through various forms of meetings.

6. The recruitment, resignation, dismissal and salary of the kitchen staff shall be adjusted and arranged by Party B according to the actual working conditions and work needs of the kitchen staff, and the salary shall be paid and managed. The monthly salary shall be collected by Party B and distributed to the kitchen staff. Party B shall notify the management of the company after arranging work for the resigned employees, and the employees can check out and leave after completing the handover procedures.

7. Party B shall strictly control and manage the cost, ensure the quality and hygiene of the dishes, and be responsible for launching new dishes every month to increase the selling point and attraction of the villa.

8. Party B's daily purchase (kitchen supplies and raw materials) and requisition list must be signed by the chef and submitted to the finance department. Party A shall provide Party B with food management, cost data, gross profit rate, etc. Every week.

9. Party A shall provide Party B's personnel with health certificates, employment certificates, temporary residence permits and other expenses.

10. Matters not covered in this agreement shall be settled by both parties through consultation.

1 1. This Labor Contract is made in duplicate, with each party holding one copy.

Signature of Party A:

Signature of Party B:

20_____ _ _ _ _ _ _ _ _ _ _ _ _ _

Labor Contract 4 Party A:

Party B:

Contract mode: contract cleaning, formwork erection, contract quality and contract progress.

Contract contents: erection and dismantling of beam underframe and sweeping pole, and dismantling of steel pipe fasteners after dismantling (note: stair shelf shall not be erected or dismantled).

Contract unit price: Party A shall contract to Party B according to the construction area of RMB/m2.

Cool calculation method: during the construction period, each person shall pay the living expenses in advance of _ _ _ _ _ yuan per month, 70% after the completion of concrete, and within _ _ _ days after all the shelves are removed.

Safety accidents: the safety accidents of all personnel of Party B shall be borne by Party B for less than RMB 65,438+0,000, and Party A for more than RMB 65,438+0,000. ..

Construction site: any change by both parties above _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

This contract is made in duplicate, one for each party, and this contract will automatically become invalid after the balance is paid.

Signature of Party A:

Signature of Party B:

date month year

Labor Contract 5 Party A: _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _

According to the principles stipulated in the Economic Contract Law of the People's Republic of China and the Regulations on Construction Project Contracts, combined with the actual situation of housing construction, Party A and Party B reached the following agreement through consultation.

I. Overview of the Project:

1. Party A will build a new building in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. After contact, consultation and negotiation with Party B, it is decided to contract out its house construction project (from the beginning of the main structure to the completion of painting) to Party B for construction. This project will be started on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Party B shall carry out the construction according to the warranty period of Party A's drawings.

2. Take the form of lump sum expenses. Party B is responsible for facilities (such as scaffolding and springboard). Party A shall be responsible for the supply of materials required by the construction; The commencement of the project will be completed within _ _ _ _ _ days from the date of signing the agreement; The total construction area of the house is square meters, calculated at RMB per square meter, and the cost is RMB only.

3. Payment method: After the main structure project is completed, Party A shall pay 50% of the project payment to Party B, namely (in words): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ..

Second, the quality requirements:

1. The acceptance criteria of this project shall be implemented by Party A in accordance with the following provisions.

2. During the construction, Party B shall carry out the construction according to Party A's requirements. During the construction of the main structure, the wall should be vertical and flat as a whole, and all doors, windows and doors should be aligned with the wall; When painting, the wall thickness should be uniform, without cracks, the inner wall surface should reach the overall level, smooth and without cracks, and the painting at the contact between doors and windows and the wall surface can not have cracks. The ceiling surface should be uniform in thickness, without cracks, all painted colors should be uniform, and the door wall and bathroom tiles should be pasted flat and complete to achieve flatness; The angle of yin and yang is in a line with the wall, vertical or parallel to the wall; Rainwater drainage will be carried out around the house, and Party A will conduct completion acceptance after the project is completed.

Third, security issues:

Party B shall be fully responsible for the safety of the project construction site. In case of any safety accident, Party B shall be fully responsible and bear all the responsibilities, and Party A shall not bear any responsibilities or legal responsibilities.

Need to explain:

5. This contract is made in duplicate, with each party holding one copy. This contract shall come into effect as of the date of signing on.

Party A (signature): _ _ _ _ _ _ _ _ _ _ _ _

Party B (signature and seal): _ _ _ _ _ _ _ _ _ _ _

Party A (signature): _ _ _ _ _ _ _ _ _ _ _ _

Witnesses of both parties (signature and seal): _ _ _ _ _ _ _ _ _ _ _

Party B (signature and seal): _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Employer of Labor Contract 6: (hereinafter referred to as Party A)

Contractor: (hereinafter referred to as Party B)

In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness and good faith, both parties reach an agreement on the construction of this construction project and conclude this contract.

I. Project overview and contract scope:

1, Project Name: Pile Foundation Project of C3# Building of Youth Apartment in Greenland International City

Project Location: Intersection of Fengcheng No.10 Road and Wenjing Road

2. Scope of contract:

Bored cast-in-place pile in C3# building of Xi 'an Greenland International City Youth Apartment.

3. Duration: The total duration of bored pile is 45 calendar days.

Second, the project cost:

The project cost is about xx yuan.

III. Contractor:

The total price of contracted projects and materials is lump sum.

Four. Payment method:

The project payment of this contract shall be handled by Party B. After the money is credited to Party A's account, Party A shall directly pay it to Party B, and the tax shall be withheld and remitted by Party A..

Verb (abbreviation for verb) Contractor's work:

1. Party B shall strictly fulfill all the contents of the same number (X08NO004) signed by Party A and Shanghai Greenland Group Xi Resettlement Industry Co., Ltd., and bear all the responsibilities that Party B should bear in this contract (X08NO004).

2. After the completion of pile foundation construction, Party B shall provide complete completion data as required by Party A..

Liability for breach of contract of intransitive verbs:

1. If the construction period is delayed due to Party B's own reasons, Party B shall bear the corresponding losses.

2. All losses caused by construction quality shall be borne by Party B. ..

Seven, project quality:

1. Party B shall seriously carry out the construction according to the requirements of national standards and specifications and construction design drawings.

2. The evaluation basis of engineering quality standard is the national quality inspection evaluation standard. Party B must ensure that the construction quality of the project reaches the qualified standard.

Eight, safety construction:

During the construction, Party B shall strictly implement the safety operation rules to ensure the safety of mechanical personnel and take necessary safety protection measures. On-site construction personnel must wear safety helmets to eliminate hidden dangers of accidents, and Party B shall bear all responsibilities for accidents caused by unfavorable safety measures.

Nine. Contract disputes:

In case of any dispute during the performance of the contract, the solution:

1. Both parties shall settle it through consultation.

2, to the people's court.

Unfinished business

The two sides negotiated settlement. This contract is made in quadruplicate, with each party holding two copies. This contract shall come into effect after being signed and sealed by both parties.

Employer: (Seal) Contractor: (Seal)

Responsible person: _ _ _ _ _ _ _ _ Responsible person: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Agent: _ _ _ _ _ _ _ _ _ _ Agent: _ _ _ _ _ _ _ _ _

Date of signing: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

;