Job Recruitment Website - Job seeking and recruitment - SDIC Xinji Liu Zhuang Coal Mine Recruitment Phone

SDIC Xinji Liu Zhuang Coal Mine Recruitment Phone

05548665432, this is the telephone number of the labor department of human resources in this mine. The minister of this department is, and the section chief is Jiang. Now the mine manager is Bao, the party secretary is Mu, the production deputy mine manager is Yi Biao, and the electromechanical deputy mine manager is Feng Baoquan. Now the salary and welfare are the best in several mines of the company. You can have a try.

Let me briefly introduce the mine, please refer to it.

Brief Introduction of Liu Zhuang Coal Mine (New)

I. Introduction of Basic Information

Anhui SDIC Xinji Liu Zhuang Mining Co., Ltd. (hereinafter referred to as "Liu Zhuang Coal Mine") is a super-large modern mine newly built by SDIC Xinji Energy Co., Ltd. in Fuyang City, Anhui Province. It is an important part of the "Tenth Five-Year Plan" key construction projects of the country and Anhui Province and the "86 1" energy base construction plan of Anhui Province.

Liu Zhuang Coal Mine is located in the north of Yingshang County, 20km south of Yingshang County and 40km west of Fuyang City. The mine field is about 16 km long from east to west, 3.5-8 km wide from north to south and covers an area of 82 square kilometers. The minable coal seam 13 layer in the mine field has an average total thickness of 27.8m, geological reserves 1560.56Mt and recoverable reserves of 679.4mt. The coal quality of the mine is excellent, and it belongs to medium ash, low sulfur-ultra-low sulfur, low phosphorus-ultra-low phosphorus and medium-high heat value. It is a good blending of power, gasified coal and coking coal, and its products have strong market competitiveness.

Liu Zhuang Coal Mine started construction in early 2003 and is scheduled to be completed and accepted in June 2006.

Production. The mine plans to invest 2.8 billion yuan, and has completed investment of more than 2,654.38 billion yuan. Liu Zhuang Coal Mine has made great achievements through continuous innovation in the construction process. For example, it took the lead in adopting the three-parallel construction (shaft) technology of "injection, freezing and drilling" in China and won the first prize of scientific and technological progress in Anhui Province. Liu Zhuang Coal Mine was awarded the honorary title of "One Million Engineering Innovation Advanced Collective".

Second, the design production capacity

The designed coal production capacity of the mine is 8 million tons/year, and the coal preparation plant has been built. In addition, Liu Zhuang coal mine low calorific value power plant (2×50MW) and Liu Zhuang Kengkou power plant (4×600MW) are also under active planning.

Thirdly, the design and construction of "Digital Liu Zhuang".

The collection, transmission, application and feedback of all kinds of information in Liu Zhuang Coal Mine under design and construction are all closed-loop control processes, and all information will be displayed in digital form, which is reflected in the informationization of coal mine management and the automation of production in Liu Zhuang.

management information

With planning as the leading factor, cost control as the core, and information technology as the support, the double closed-loop control of logistics and capital flow is formed, and the cost advantage competition strategy of Liu Zhuang Coal Mine is realized.

(2) Automation of production process

Through the transmission control platform of iCentroView, all electrical equipment except the tunneling head is centrally monitored in the dispatching monitoring center, and the comprehensive automatic control of the whole mine is realized. Remote control or monitoring of 60 subsystems in 24 categories such as underground main drainage system, ventilation system and gas drainage system.

(3) Equipped with a first-class dispatching monitoring center

Liu Zhuang Coal Mine has designed 14 vertical shaft optical cable, with the total number of cores exceeding 400, which is the highest in the world and provides enough digital channels for future system expansion. The underground video image monitoring system adopts digital uncompressed transmission to ensure that high-definition images are transmitted to the monitoring center.

It is the first time in China to adopt mature industrial Ethernet technology in Liu Zhuang coal mine where the production conditions are very bad, such as high temperature, high humidity and high gas. All nodes adopt German hessman switch with high reliability, which ensures the reliability of control data transmission.

The central monitoring software system (iCentroView) integrates data communication, processing, acquisition, control, coordination, comprehensive intelligent judgment and graphic display, and timely processes and coordinates the work of each system to achieve the purpose of real-time monitoring.

The monitoring center adopts 3x1467 "DLP screen, which is the best in the whole coal industry. Through the projection display wall system, real-time demonstration, monitoring and intelligent management of on-site control information and video monitoring images are carried out, which greatly enhances the intuition and operability of the command and monitoring system and realizes comprehensive management.

Liu Zhuang Coal Mine has fully implemented the "All-in-One Card" project, and realized the intelligent management of attendance, access control, electricity consumption, electricity control and water control functions through one card, so that employees can fully enjoy the convenience and safety brought by modern technology to their work and life, and at the same time, the level of mine property management has been comprehensively improved.

Four. Main technical and economic indicators

1, the designed production capacity of the mine is 8 million tons/year.

2, mine development way for vertical shaft, concentrated alleys, partition development, partition ventilation, centralized coal.

3. The mine level is -762m, the designed engineering quantity is 46,549 m, and the excavation rate of ten thousand tons is 58.2m m.

4. The total design area is 80 hectares.

5, the mine comprehensive efficiency is 20.6 1t/ work,

6, the mine production cycle is 38 months.

Under the leadership of general manager Liu Yi, Liu Zhuang Coal Mine inherits and develops Xinji spirit, and embodies the wisdom of all Xinji people. With the construction concept of "innovation, precision and high-tech" and the construction concept of digitalization, humanization and environmental protection, we will run through the construction of Liu Zhuang coal mine, create a safe and efficient "digital mine", and then innovate and gather new glory for the second venture!