Job Recruitment Website - Job seeking and recruitment - Xi Metro 10 Line Station

Xi Metro 10 Line Station

The stations of Xi subway 10 line are as follows:

Yangjiazhuang Station, Yuan Huan Middle Road Station, Tuanjie Village Station, Hongqi Station, Xuefu Road Station, Dongfeng Road Station, Weiyang Lake Station, Xingwei Road Station, Liushui Road Station, Jingwei Station, Shengliucun Station, Sangjiacun Station, Jinghuan North Road Station, Yuchu West Station, Yuchu Station, Xingwang Village Station and Waterscape Park Station.

The first phase of Xi subway project 10 line starts from Inoue Village Station in the south and ends at Zhao Hui Square Station in Gaoling District in the north, with a total length of 34.2 kilometers. The line has been connected in series with weiyang district, Chanba Ecological Zone, International Port Area and Gaoling District in Xi City, with a total of 7 stations 10, including 7 underground stations and 7 elevated stations10. Xi Metro 10 Line will be equipped with fully automatic driverless trains based on GoA4 standard, which will be the first batch of driverless trains built in the western region.

Significance of subway construction

Xi 'an Metro Phase I 10 line is laid along the modern industrial belt in the north of the city to support the development of the north of the city. The Gaoling District and Gaoling equipment industrial cluster covered by it are separated from the main city of Xi by a river, which is the key development area for the northward expansion of the main city of Xi. After the completion of the project, the connection between the area and the main city can be further strengthened.

Xi subway 10 line is a rapid rail transit line connecting the main city with the north bank of Weihe River, which is of great significance for optimizing the overall spatial layout of the city, realizing the development strategy of crossing Weihe River in the north, promoting regional integration and promoting industrial upgrading along the line. June 65438+1October 65438+June 2023, Xuefu Road Station-Dongfeng Road Station shield tunnel of the first phase of Xi subway 10 line was successfully completed. At this point, the first phase of Metro 10 Line, except the elevated section, all the underground tunnels are connected.