In the process of production contract management, in addition to being tested by security risks and market risks, it is inevitable to face legal risks. Therefore, special attention should be paid to signing the production contract agreement. The following is a sample of the production contract agreement I have compiled for you. Thanks for reading it.

Model production contract agreement 1

Customer (Party A): Service Party (Party B):

According to the Contract Law of People's Republic of China (PRC), both parties to the contract reached an agreement on the production contract and technical service of the cement project of t/d rotary kiln of Cement Co., Ltd., and signed this contract, which shall be implemented by both parties.

Rule number one. The object and scope of the contract

Production management and technical services of Party A's rotary kiln production line (from raw material crushing to clinker storage).

Article 2: Time limit, place and method of performance of the contract

1. Performance period: calculated from the date when Party B's personnel officially enter the clinker production line and meet the standards within 72 hours; The plan is divided into two stages:

1, the first 3 months are the running-in period of the production line (starting from 72 hours after reaching the standard);

2. Officially take over the production stage.

2. Place and method of contract performance: Party B sends management personnel and technical personnel to Party A's production site for service.

Article 3. Production and economic and technical indicators

The production line managed by Party B shall meet the following indicators:

1, daily output of rotary kiln clinker: ≥ t/d (burning bituminous coal); ≥ t/d (burning anthracite);

2. Clinker strength: ≥28MPa(3 days) ≥55MPa(28 days);

3. f-CaO content in clinker: ≤ 2.0%; The qualified rate is ≥ 85%; The qualified rate of stability is 100%

4. Kiln operating rate: ≥85%

5. Annual output of clinker 10000 tons.

Article 4. Responsibilities, authority and requirements of Party B.

After Party B officially takes over the production, it is fully responsible for the production of the production line and performs the following duties:

First, introduce advanced management concepts to manage Party A's cement production line and improve the production management level of the whole enterprise;

Second, optimize the establishment of production institutions and personnel to improve labor productivity;

Third, strengthen the management of on-site equipment and environmental sanitation, and provide reasonable rectification plans for existing problems; 4. Strengthen the training for the operators of Party A's production posts, including: theoretical and practical training for cement technology, equipment maintenance and repair, automation, electricity, analysis and testing, etc. , so as to improve the comprehensive quality of post personnel;

5. Formulate various rules and regulations related to production, including operating procedures, safety procedures, inspection procedures, product quality management procedures, sampling inspection procedures, equipment management procedures and other technical management documents, so as to standardize management and institutionalize production management;

Six, standardize all kinds of production records, documents, forms, accounting, etc. ;

7. Prepare and provide various materials supply and procurement plans, such as the supply plan of bulk raw materials and quality control indicators, spare parts procurement plan, etc.

Eight, strengthen the management of production safety, improve the safety awareness of post personnel;

Nine, do a good job in saving energy and reducing consumption, repairing the old and using waste.

Authority of Party B:

Party B has absolute personnel rights and labor rights for all personnel in Party A's production posts. Requirements:

1. The personnel sent by Party B to the site shall be healthy, experienced, capable of working, competent and satisfied with on-site operations, and have the ability to deal with and solve emergency problems.

Two. Quantity and specialty of Party B's service in the factory:

Party B plans to have 15- 18 employees, including project leader 1 person, chief technician 1 person, equipment supervisor and deputy supervisor 1 person, electrical supervisor and deputy supervisor 1 person, and process supervisor/kloc-.

Three. Party B's personnel stationed at the site must abide by national laws and regulations and Party A's management system;

Article 5. Responsibilities, authority and requirements of Party A.

Responsibilities:

1. During the running-in period, Party A and Party B jointly manage the production line;

2. Party A shall timely review the documents and plans declared by Party B, and notify Party B in time if there are any problems or need to be revised;

3. Provide all kinds of raw materials and combustible materials and other materials related to production (including spare parts and tools, etc.). ) According to Party B's requirements;

Four, timely provide technical information related to production and analysis and test data of raw materials and combustible materials;

Verb (abbreviation of verb) provides suitable office space and facilities for Party B's personnel;

6. Party A shall provide accommodation, on-site transportation and other work convenience for Party B's on-site personnel free of charge;

Seven. Party A shall protect the personal and property safety of Party B's personnel. Power: Party A has the right to supervise the production management of Party B. ..

Article 6. Fees and payment methods

1. The expenses shall be settled monthly according to the output (inventory result) of the products produced. The specific rate standard is as follows: clinker, and Party B's output is calculated according to the kiln shutdown time of tons/day. Monthly clinker settlement output = monthly actual inventory+Party A's kiln stopping time × ton/day Note: Party A's kiln stopping includes the following contents:

1, materials (raw materials, spare parts, etc. ) None or the quality deviation is large.

2. Product expansion

3. Power failure (insufficient power supply)

4. Plan maintenance or vacation. 5. Party A stops the kiln for other reasons.

Second, the payment method:

(1) Pay salary of 654.38+ten thousand yuan as advance salary after signing the contract; (Fees do not include tax)

(2) After the personnel enter the factory, their wages will be settled monthly and before the 5th of the following month;

(3) The salary for the first three months shall be settled at 200,000 yuan/month. (Fees do not include tax);

(4) The formal takeover of the production stage shall be settled at the agreed rate. (Fees do not include tax);

Article 7. Liability for breach of contract and compensation methods for losses

1. If Party B's employees in the factory are incompetent, can't safeguard Party A's interests and reputation, and can't guarantee the production and economic and technical indicators, Party A has the right to ask Party B to replace people or suspend the execution of this contract (when the contract is suspended, the total wages will be deducted according to the actual number of people on site, actual working days and Party B's post).

2. When Party B receives the salary in advance, this contract will come into effect. If Party B terminates this contract, it shall return the deposit twice; If Party A terminates this contract, the prepaid salary received by Party B will be used as the expense of the resident;

Article 8. Methods of resolving contract disputes

First, solve it through consultation;

2. If negotiation fails, it may apply to the contract arbitration department where Party A is located for arbitration or bring a lawsuit to the people's court where Party A is located.

Article 9, Others

1. The debugging personnel sent by Party B to Party A's site must wear labor protection articles provided by Party A. Party B shall bear all responsibilities for personal safety accidents caused by Party B;

2. The technical personnel of Party B shall safeguard the interests and reputation of Party A. ..

Three. On-site management and technical personnel of Party B shall properly handle the relationship with Party A and actively carry out their work;

Four. This contract shall come into effect after being signed by both parties;

Five, the two sides respect each other's intellectual property rights and technical secrets, and shall not transfer or disclose technical documents, technical data, operating essentials, etc. To a third party;

Article 10 Any change, modification or addition or subtraction of the terms of this contract shall be agreed by both parties through consultation and signed by authorized representatives, which shall be an integral part of this contract and have the same legal effect.

Article 11 This contract is made in quadruplicate, with Party A and Party B holding two copies respectively.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Model production contract agreement II

Party A (Employer):

Party B (contractor):

Home address: ID number: Party A and Party B have reached the following agreement through equal consultation in accordance with the Contract Law of People's Republic of China (PRC) and relevant laws and regulations:

Article 1: Signing Methods and Requirements

& lt 1 & gt; During the contract period, Party B shall independently manage and account for the production personnel of semi-finished products and finished products such as blank making, palletizing, shelf storage, kiln loading, kiln discharging and kiln burning. Party A is responsible for soil supply and bulldozing, and the wages of the employees employed by Party A shall be borne by Party A, which has nothing to do with Party B. ..

& lt3> Workers required for Party B's production are recruited by Party B independently, and there is no labor contract relationship with Party A. Minor injuries below 1 10,000 yuan in the production process shall be borne by Party B, and personal injury accidents shall be borne by both parties, and both parties shall bear 50% of the expenses.

Article 2: Contract Quota and Expenses

& lt 1 & gt; During the contract period, the coal and electricity costs shall be borne by Party A.. Under the condition of ensuring the supply of raw materials, Party B must complete the production of/kloc-0,000,000 pieces of qualified standard bricks within 20__ years, and the price per 10,000 pieces is 800.00 yuan (in words: eight hundred yuan). In case of irresistible natural disasters, the resulting losses shall be borne by both parties through consultation.

& lt2> If Party B wants to lead the team into the factory on time according to Party A's requirements, Party A shall pay a deposit of 50,000 yuan to Party B in advance (the deposit will be deducted in batches during Party B's normal production).

Article 3: Responsibilities and obligations of both parties

& lt 1 & gt; Before Party A starts the machine, all mechanical equipment shall be thoroughly maintained and handed over to Party B for use and management to ensure the normal production of Party B.. In case of any damage or loss, Party B shall purchase the supplements in time, which shall not affect the normal production.

& lt2> Party A has the right to supervise the quality of products produced by Party B, and the unqualified products will not be put into storage, but it should not be too picky and deliberately make things difficult for Party B. ..

& lt3> For salary settlement, Party A shall pay the contract fee to Party B twice a month, and shall not default.

Article 4: Liability for breach of contract and reward and punishment system

& lt 1 & gt; Party B must complete the annual output of/kloc-0,000,000 standard bricks. If it exceeds/kloc-0,000,000, Party B will be given a bonus of/kloc-0,000 yuan; if it is less than/kloc-0,000,000 yuan, Party B will be fined/kloc-0,000 yuan. After this contract comes into effect, both parties must strictly implement it and shall not violate it.

& lt2> Under any circumstances, Party B and its work shall not interfere with Party A's business, and shall not block or occupy Party A's business premises, otherwise, Party B shall pay Party A a loss fee of 5,000 yuan each. On the other hand, if the normal production of Party B is affected by a dispute between Party A and the local people or land, it shall also pay Party B a loss fee of 5,000 yuan.

& lt3> During the contract period, both parties treat each other honestly, cooperate sincerely, unite as one, communicate diligently, coordinate diligently, deal with problems and difficulties in time, and ensure to complete the annual production tasks, so that everyone can make money and be happy.

& lt4> Matters not covered in this contract shall be supplemented by both parties through consultation, and the supplementary agreement shall have the same effect as this contract. In case of any dispute during the execution of this contract, both parties shall try their best to solve it through negotiation. If no agreement can be reached, it can be settled through litigation in the local court.

& lt5> Supplementary explanation: In case of special circumstances, when the brick factory really can't produce normally, the set output shall be calculated according to the quantity that can be produced at that time, regardless of rewards and punishments.

& lt6> Both parties shall abide by the provisions of the contract, and neither party shall breach the contract. If one party breaches the contract, it shall pay the other party a one-time penalty of RMB 30,000.

& lt7> This Agreement is made in duplicate, one for each party, and shall come into effect as of the date of signature by both parties.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Model production contract agreement 3

Party A:

Party B:

In order to better manage the production workshop, improve production efficiency, improve the quality of finished products and improve product utilization. Through consultation between Party A and Party B, it is decided that the production workshop will be contracted by Party B. In order to clarify the rights and obligations of both parties, this contract is hereby concluded.

I. Contract Scheme:

Party A will contract all the factories owned by Party A to Party B to process them for Party A. During the contract period: ① Party A will provide the site, equipment and production line, and all expenses such as materials, equipment, electricity and water will be paid by Party A. (2) Party B will only bear the wages of workers, equipment maintenance expenses and equipment accessories expenses.

Two. Party A's responsibilities:

1. Party A has the right to carry out various administrative management on Party B's hygiene and safety. Smoking is prohibited in the workshop to avoid fire. In case of factory accidents and personal injuries, all economic losses shall be borne by Party B, and Party A shall not be responsible.

2. Party A has the right to supervise Party B's production environment and labor protection. If Party B is found to have violated the rules, Party A has the right to terminate the contract or give economic sanctions.

3. Party A assigned the production task to Party B a week ago, and Party B should complete the production task with good quality and quantity on time according to Party A's requirements. Party A has the right to impose economic penalties on Party B for delaying the delivery, and deduct 30,000 yuan from Party B for every delay that affects the production speed, and all expenses arising from Party A's delay shall be borne by Party B. ..

Three. Party B's responsibilities:

1. Party B is responsible for production management and production operation (monitoring and testing, pumping out of eight warehouses of building materials and products, production operation of product workshop, production operation of oxidized asphalt workshop, production operation of asphalt granulation workshop and operation of heat conduction oil furnace).

2. Party B is responsible for implementing the quota of production operators.

3. In production and operation, Party B must obey the management of Party A, complete the production tasks assigned by Party A on time, and carry out production according to Party A's various rules and regulations. ..

4. Party B is responsible for regularly maintaining the equipment and facilities provided by Party A, and should report the abnormal situation of the equipment as soon as possible. Party B shall be responsible for the equipment damage caused by Party B's operational mistakes.

5. During the contract period, Party B shall not subcontract the plant to others.

6. For the personal safety of Party B's staff, Party B shall be responsible for any personal injury or death. Party A is not responsible.

Four. Obligations of Party A:

1. Provide plant, equipment and supporting facilities.

2. Provide materials, water, electricity, office supplies, dormitory, canteen equipment, tools and labor insurance supplies. (If Party B damages the above items, it shall be borne by Party B).

3. Party A is responsible for the sales of all kinds of products, and Party B cooperates with the sales of products. If the production is stopped due to the procurement of opaque solid raw materials and product sales, special circumstances shall be discussed separately.

4. Party A must provide Party B with correct and effective raw material warehousing statements and monthly inventory records every time.

Verb (abbreviation of verb) Obligations of Party B:

1. Responsible for the production and management of the production line.

2. Responsible for the testing of raw materials and products, and the storage operation of the pump room.

3. Responsible for workshop production.

4. Responsible for the production of oxidized asphalt workshop.

5. Be responsible for the production of asphalt granulation workshop.

6. Responsible for workshop operation of heat transfer oil boiler.

7. Be responsible for the maintenance of the equipment.

Six, production personnel capacity of 28 people.

1. 2 people in the production technology department.

2. There are two people in the lab.

3. The raw materials and products of the pump room are put into storage by two people.

4. Product workshop 10 people.

5. There are three people in the oxidation section.

6. There are 4 people in the asphalt granulation workshop.

7. There are 2 people in the workshop of heat transfer oil boiler.

8. Two maintenance workers.

9. There are 1 person in the canteen.

VII. Term of the Contract

The term of the contract is one year, counting from the date of signing.

VIII. Price and Scheme of Contract Products

1, execute the production and processing contract.

2. Party A will provide Party B with enough raw materials every month so that Party B can produce the output required by Party A. ..

3. Party B produces qualified products to maximize profits.

4. Every ton of raw materials produced and processed is calculated as one ton of 20 yuan, and the downstream products of oxidized asphalt and asphalt granulation are calculated as one ton of 35 yuan.

5. If Party A stops production or the output is less than 20_ tons, the processing fee shall be calculated as 1500 tons (except for special reasons such as insufficient power supply and natural disasters).

Nine. Settlement and payment methods

1. Settlement method: After Party B submits the production report of the current month to Party A for accounting, Party A's finance department can make settlement only after checking it correctly.

2. Payment time: the handling fee of the current month will be paid to the account designated by Party B on 20 10/February 15. The second month 10. (If it is a weekend, it will be postponed to working hours)

3. Cooperation security deposit: When the processing fee is paid, 10% of the processing fee of the current month is deducted as the cooperation security deposit, which is paid once every six months.

X. Other matters

1. In case of contract dispute, both parties shall bring a lawsuit at the place where Party A's factory is located.

2. Matters not covered shall be settled by both parties through consultation.

3. This contract is made in duplicate, one for each party, with the same legal effect, and shall be implemented as of the date of signing.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Three related clauses of the model production contract agreement:

★ 5 copies of workshop production contract model.

★ Template of production contract agreement

★ Model text of production contract standard

★ Three sample contracts for the production workshop are the latest.

★ The latest three demonstration clauses of the production contract management contract.

★ Model contract agreement for contract processing

★ Model contract for production workshop

★ 3 copies of production workshop contract model.

★ 3 samples of processing contract

★ 3 copies of standard workshop contract agreement.