Hydroelectric slotting machine how much is it for a day ?

In the basic decoration, whether it is self-installation or installation by decoration companies, water and electricity account for the largest proportion. Therefore, owners will inevitably pay more attention to hydropower. If they install it themselves, they will be very concerned about the working hours of hydropower workers, and asking a decoration company to install it will not only care about the working hours of workers, but also care about the quality of materials. In the past, the price of decoration plumbers may be paid by the day, but now it is mostly calculated by the square, that is, by the meter.

How much is the water and electricity installation fee? How to calculate the installation price of water and electricity? If it is completed in the form of contracting, the increase in money depends on whether the materials and materials are contracted. So it is difficult to determine the price.

First, the price of water and electricity for home improvement

The water and electricity installation price is divided into three parts: 1. High-voltage installation part. 2. Weak current installation part. 3. Waterway reconstruction. Next, Kuwang Bian Xiao will introduce in detail how the prices of these three parts are calculated, and Bian Xiao will introduce them to you in this article.

1. Negotiate slotting and slotting price.

Water circuit reform can be divided into two prices: slotting and slotting. Some companies divide the slotting price into "non-load-bearing wall slotting and load-bearing wall slotting", so we must discuss their respective prices in advance.

2, weak current installation materials and installation price

1. Wire: used for telephone line, network cable, TV cable, audio cable, audio cable, video cable and background music.

2. Conduit: PVC hard flame-retardant electrical conduit diameter D 16 Conduit 3 weak current (telephone and TV network cable) passes through the conduit separately. Switch socket bottom box 86 is 10 yuan/piece; 1 18 type 15 yuan/piece. Add 16 information integration box and 160 yuan/set. Ensure that there is no joint in the pipe, and fill it with gypsum or cement mortar after burying the pipe. Concealed pipe price: 28 yuan/meter. Ming Guan price: 18 yuan/meter

Material: 1PVC conduit thickened cold-bent pipe wire.

3. High-voltage installation materials and prices

The threading in the flame-retardant electrical pipe shall not exceed 3 buttons, and 5 yuan shall be added for every meter exceeding 3 buttons. There is no connector for the wires in the pipe, and the junction box is used. Type 86 switch socket box 10 yuan/piece; 1 18 type 15 yuan/piece, 4 m2 conductor per meter plus 10 yuan. Multiple pipes in the same tank are charged according to multiple hidden lines. Remove the groove, bury the pipe, and fill it with gypsum or cement mortar.

Covered pipe: 35 yuan/meter

Ming Guan: 25 yuan/meter

Material: PVC wire thickened cold bending pipe, electric wire.

4. High-voltage installation materials and prices

The threading in the flame-retardant electrical pipe shall not exceed 3 buttons, and 5 yuan shall be added for every meter exceeding 3 buttons. There is no connector for the wires in the pipe, and the junction box is used. Type 86 switch socket box 10 yuan/piece; 1 18 type 15 yuan/piece, 4 m2 conductor per meter plus 10 yuan. Multiple pipes in the same tank are charged according to multiple hidden lines. Remove the groove, bury the pipe, and fill it with gypsum or cement mortar.

Covered pipe: 35 yuan/meter

Ming Guan: 25 yuan/meter

Material: PVC wire thickened cold bending pipe, electric wire.

Second, how to increase the cost of water circuit

1, the water circuit transformation can be divided into two prices: no slot and slot. Some companies divide the slotting price into "non-load-bearing wall slotting and load-bearing wall slotting", so we must discuss their respective prices in advance.

2. Hydropower transformation is the biggest concealed project, and it is also the most expensive one among the additions. It depends on whether the workers deal with it in a conventional way. For example, the deviation of going through the wall will make you walk around the wall. Originally, two pipes with one groove were forced to become double grooves.

3. Don't completely rely on other people's suggestions in the process of water circuit transformation. You will live in the future home, and each family has its own special needs. On the basis of listening to other people's suggestions, you must also know what you really need in the future, so that you can eliminate some suggestions that you don't really need from others.