Job Recruitment Website - Job seeking and recruitment - When will Qingdao Metro start its preparatory work before operation?

When will Qingdao Metro start its preparatory work before operation?

Phase I Project (M3 Line, 2009-20 14)

The first phase of Qingdao Metro (red line on the left) runs from Qingdao Railway Station to Qingdao North Station, with a total length of 24.9 kilometers, all of which are underground sections. There are 22 stations, rolling stock depot, comprehensive maintenance base and control center, with a total investment of about 654.38+0.3 billion yuan and a construction period of 20 10 ~ 20 14. Among them, the experimental section started construction on June 27th, 2009. Hexi Station in the experimental section is located on the west side of Heilongjiang Road. It is an underground double-deck island station with a length of 200m, a total construction area of about 10640m2 and an interval length of 1 150m. The total investment of the experimental section is about 290 million yuan. According to estimates, after the completion of the first phase of the 20 14 project, the daily passenger flow is expected to reach 235,000.

Railway Station, Daxue Road, Huiquan Square, Tiantai Stadium, Taipingjiao, Zhanshan, May 4th Square, Jiangxi Road, Ningxia Road, Dunhua Road, Liaoyang West Road, Qingjiang Road, Shuang Shan, Changsha Road, Hexi Road, Haier Road, Wannianquan Road, Licun, Junfeng Road, Chongqing Road, Yongping Road and Qingdao North Station.

List of Stations in Phase I Project (M3 Line)

Site selection of the first phase subway project:

Phase II Project (Phase I Project of M2 Line, 20 12 -20 16)

The second phase project of Qingdao Metro (the first phase project of M2 Line, the green line above) runs from Xizhen to Jinshui Road, with a planned length of about 29.6 kilometers, including 27 stations, with a total investment of about 65.438+0.62 billion yuan and a construction period of 2065.438+02 to 2065.438+06. The first phase of M2 Line runs from Shibei District to Licang District via Shinan District and Laoshan District. The specific route direction has been basically determined, but the location of the station is still being demonstrated and adjusted.

long-range planning

In the Comprehensive Urban Traffic Planning of Qingdao (2008-2020), Yuan Jing rail transit network consists of 8 lines (M 1-M8 line), with a total length of 227 kilometers, covering 7 districts, with a daily passenger volume of 1.22 million passengers. It is predicted that the daily passenger volume of rail transit will reach 6.5438+0.22 million in 2020, accounting for 654.38+0.7% of the total public transport. The one-way peak and high-profile traffic volume of rail network is basically above 6.5438+0.2 million person-times; The average passenger intensity reached 14900 passengers/km.

M 1 Line: Zhongshan Road-Chengyang. The line starts from Zhongshan Road, passes through Taitung, Qingdao North Station and Liuting Airport, and reaches Chengyang.

M2 line: Taihang Mountain Road-east of Licang. The route passes through Huangdao District Government, Xuejiadao, Qingdao Railway Station, Taitung, Municipal Government, Beer City and Licun, and reaches the east of Licang.

M3 Line: Qingdao Railway Station-Qingdao North Station. From Qingdao Railway Station to the east, pass the first bathing beach, the municipal government and Licun, and arrive at Qingdao North Station.

M4 line: Taishan Road-Shazikou. Depart from Taishan Road, pass Haibo Bridge, pass East Bus Station along Liaoyang Road, and reach Shazikou.

M5 line: Damai Island-Tiger Island. Depart from Damai Island, pass Xinjiazhuang, Jiang Yan West Road and Shandong Road, and reach the destination of Huxin Island.

M6 line: Jinggangshan Road-Wangtai: It is an L-shaped line running through Huangdao District. Stand up from Taihang Mountain Road, go north along Tuanjie Road, pass Xin 'an and Hongshiya, and arrive at Wangtai Town Station.

M7 Line: Huangdao Ferry-Liuhuabo: It is an east-west line across Huangdao District, starting from Huangdao Wharf and going along huanghe road to Liuhuabo via Xin 'an.

M8 Line: Qingdao North Station-Jimo South Spring: It is a line that runs through the north and south of Hongdao District and connects Qingdao downtown. Depart from Qingdao North Station, cross the sea to the west via Hongdao, Ma Shang Street Office, Jihongtan and Jimo South Spring.