Job Recruitment Website - Job seeking and recruitment - Pearl industrial park infrastructure

Pearl industrial park infrastructure

[Road] The roads in the park are planned in advance, spacious and smooth. According to the industrial planning of the industrial park, meet the traffic requirements of large trucks and extended container trucks. Roads are divided into three levels: main roads, secondary roads and branch roads, in which the section width of the north-south main roads is 60 meters, and other main roads are 40 meters; Secondary highway 25 meters, 20 meters; Branch road 15m. [Power supply] Conghua City has Guangzhou Pumped Storage Power Plant with the largest installed capacity and 2.4 million kilowatts of power generation in the world, and Liuxihe Power Plant with an annual power generation of 65.438+0.25 billion kWh. The power supply of the park comes from Guangzhou first-class power grid, and the line planning is double-loop; Provide 1 10KV voltage and peak-valley electricity, and charge no capacity increase fee; The line leads to the enterprise power switch room, which can meet the power demand of various industrial projects. There is a 1 10KV substation in the middle of the west area of Mingzhu Industrial Park, with a capacity of 3×5.0KVA, which can meet the needs of industrial enterprises and living facilities in the west and central areas. In the future, a 1 10KV substation with a capacity of 2×5.0KVA will be built in the northwest outside the planning area. [Water supply] The main water supply pipe in the park is from the third waterworks in Conghua City, and the water quality reaches the national second-class standard. It is transported by DN600 pipeline, with a daily water supply capacity of 50,000 tons and a water supply pressure of not less than 0. 14MPa. In order to ensure the water pressure, a water supply pumping station is set up in the North Group. Fire water supply intensity is 45L/s each time. Outdoor fire hydrants are set along the road 120M. Adopt domestic fire-fighting common water supply pipe network system. [Drainage] Rain and sewage in the park are strictly separated. Sewage discharge treatment: A sewage treatment plant is set up at the southern end of the South Group of West Zone, with a planned treatment capacity of 60,000 tons/day, and the first phase is about 20,000 tons/day. After secondary treatment, the discharge of sewage meets the requirements of Integrated Wastewater Discharge Standard (GB8978). Rainwater drainage: it is laid along the slope by gravity flow and discharged into the nearby water body in sections and sections. Retain the original river, do not destroy the original drainage system, and ensure the rainwater drainage outside the planning area. [Communication] The park has a broadband communication network, which can provide local and long-distance telecommunication services and large-capacity data communication services (ADSL, optical fiber Ethernet, DDN, VPN, etc.). )? The industrial supporting park focuses on the leading automobile industry (with Guangzhou Automobile Hino Co., Ltd. as the core), focusing on the development of five major industries: machinery and equipment manufacturing, household appliances manufacturing, medicine/cosmetics, light industrial building materials and modern logistics. By introducing a number of supporting industrial projects to settle down and doing a good job in industrial extension and diffusion, the industrial chain system between industries and upstream and downstream products in the park has been gradually improved, and the structure has become increasingly reasonable, forming a certain international competitiveness. Pearl Industrial Park of Science and Technology Innovation adheres to the core of improving independent innovation ability, continuously increases investment in science and technology, strengthens talent introduction, accelerates the construction of public R&D service platform, actively introduces famous R&D institutions, R&D enterprises and projects at home and abroad that serve the development of science and technology, and strives to build itself into a science and technology center in Conghua and even Guangzhou. Public Technology Innovation Platform: Guangzhou SME Entrepreneurship Base Guangzhou Conghua Mingzhu Overseas Students Entrepreneurship Base

☆ The industrial supporting park closely focuses on the leading automobile industry (with Guangzhou Automobile Hino Co., Ltd. as the core), focusing on the development of five major industries: machinery and equipment manufacturing, household appliances manufacturing, medicine/cosmetics, light industrial building materials and modern logistics. By introducing a number of supporting industrial projects to settle down and doing a good job in industrial extension and diffusion, the industrial chain system between industries and between upstream and downstream products in the park will be gradually improved, and the structure will become increasingly reasonable, forming a certain international competitiveness.

☆ Science and Technology Innovation Pearl Industrial Park adheres to the core of improving independent innovation capability, continuously increases investment in science and technology, strengthens talent introduction, speeds up the construction of public R&D service platform, actively introduces famous R&D institutions, R&D enterprises and projects that serve the development of science and technology at home and abroad, and strives to build itself into a science and technology center in Conghua and even Guangzhou.

Public Technology Innovation Platform: Guangzhou SME Entrepreneurship Base Guangzhou Conghua Mingzhu Overseas Students Entrepreneurship Base

Professional technical platform:

Enterprise R&D Center: ☆ The government service park has set up a pro-business investment service organization, formulated and implemented fair, just and transparent policies, and operated in accordance with international business practices, providing enterprises with efficient, thoughtful and high-quality services. -Fast one-stop service-thoughtful investment consulting service-regular government visits to enterprises-lowest government fees-low-cost business environment

☆ Logistics Support In order to better serve the manufacturing enterprises in the park and further improve the supporting facilities in the park, the Conghua Municipal Government has planned about 4.4 square kilometers in the Conghua entrance and exit section of the Beijing-Zhuhai Expressway to build a modern logistics system integrating logistics park system, logistics transportation platform, logistics information platform, warehousing, transportation, processing, distribution, multimodal transport, exhibition and transaction. The project has been approved by the Conghua Municipal Government, and the management committee of Conghua Mingzhu Industrial Park is responsible for the development and construction, with a total investment of about 600 million yuan. It is divided into two functional areas: the domestic comprehensive logistics park and the international transit logistics park. The project has now completed the land survey and the compilation and review of the master plan and regulatory detailed plan. The project is planned to invest about 50 million yuan in 20 10, and the whole project is planned to be completed and put into use 20 12 years ago. After the completion of the project, it will effectively improve the logistics environment in Conghua, promote investment attraction and build a modern industrial system in Conghua, and accelerate the development of Mingzhu Industrial Park.

☆ Financial services developed from the financial industry in Conghua, with nearly 200 financial outlets. The city's financial assets are of good quality, abundant funds, convenient credit and balanced financial operation. In 2008, the balance of local and foreign currency deposits of financial institutions was 442,654.38 billion yuan, and private funds were abundant. Conghua Rural Credit Cooperative has branches in the park, and Agricultural Bank, China Construction Bank, Industrial and Commercial Bank of China and China Bank are also actively expanding their business in the park. In addition, a number of guarantee companies and venture capital companies are trying to enter the park, creating a good financial environment for the development of high-tech industries.

☆ Adequate and high-quality human resources (1). Conghua is located in the transitional zone between the Pearl River Delta, northern Guangdong and eastern China, and often has a large number of laborers. Relatively superior to other areas in Guangzhou; Conghua has a low wage level and is easy to attract stable local workers. More importantly, there are nine large-scale higher vocational colleges in the city, which can train and transport more than 50 thousand applied professionals for various enterprises every year; Conghua has developed basic education and vocational and technical education, and the comprehensive higher education industrial park is stepping up planning and construction. (2) Diversified vocational skills training channels. In order to meet the needs of enterprises and continuously improve the quality of workers, Mingzhu Industrial Park actively builds diversified vocational skills training channels. After years of hard work, a vocational skills training system with "pearl characteristics" has been formed, the training promotion policy system is becoming more and more complete, and the professional, characteristic and practical training platforms and carriers are diversified.

operating costs

Investment density of land introduction (calculation standard) RMB 1885 yuan/square meter (investment intensity) cost: the predetermined price of land use right (used for 50 years) USD 45/ square meter: rental fee of standard rental factory 1.5 yuan/square meter/monthly infrastructure electricity fee (RMB/kwh).

Capacity: KVA basic

Electricity price transformer capacity

(yuan/. Monthly) The maximum demand is 23.00 yuan (including tax)

(Yuan/kW. Month) 32.00 yuan (including tax) kWh

Peak time of electricity price

(14: 00-17: 0019: 00-22: 00)1.4219 yuan/kwh (including tax) in the low valley period.

Usually (0:00-8:00) 0.45 17 yuan/kwh (including tax)

(8: 00- 14: 00, 17: 00- 19: 00, 22: 00-24: 00) 0.8735 yuan/kwh (including tax) waterway surface water 1.96 yuan. Groundwater (including sewage charges and taxes) can be used for coal gas (liquefied gas, coal and natural gas) with a sewage treatment fee of 0.95 yuan/ton after approval by relevant departments. The basic monthly fee for fixed telephone is 65,438 yuan +08 yuan/set for urban residence and 65,438 yuan +05 yuan/set for 35 yuan residence and rural residence. (1) Scope of application

1, automobiles, motorcycles and accessories, daily fine chemicals, medicine, food, jewelry, new materials, machinery and equipment manufacturing, electronic information, animation (original), modern logistics (in the logistics park, it will be audited by the Municipal Economic and Trade Bureau and the Investment Service Center and reported to the municipal government for confirmation).

2, the world's top 500 enterprises, well-known trademark enterprises at or above the provincial level, technology-intensive and high-tech enterprises (identified by the higher science and technology departments).

3. Other industrial enterprises and tourism projects with fixed assets investment of 20 million yuan (including land price) within one year (audited by the Municipal Tourism Bureau and the Investment Service Center and reported to the municipal government for confirmation).

Enterprises that meet one of the above conditions must be registered in Conghua industrial and commercial registration (unless otherwise stipulated by foreign-funded enterprises and industrial and commercial departments), and pay taxes in Conghua.

(2) Applicable time: from the date of publication to 20111231.

(three) the relief of administrative fees and service fees (that is, fee relief)

1, new projects (enterprises) that meet the scope of application of these Measures shall be exempted from the temporary occupation fee of urban roads; Six service charges, such as land registration fee, real estate rights registration fee, engineering survey fee, water sample testing fee, notarization fee and lightning protection facility testing fee, are charged according to the provisions of 50%.

2.65438+Factory buildings (warehouses), logistics warehouses and business premises (in the logistics park, the same below) for newly-built projects (enterprises) which were reported before February 3, 20081meet the scope of application of these Measures are exempted from supporting fees for urban infrastructure, and supporting facilities such as dormitories and office buildings are charged with supporting fees for urban infrastructure at 50%; The factory buildings (warehouses), logistics warehouses and business buildings built during the period of June 5438+1 October1,June 20 1 and February 3 1 2009 are charged at 50% of the supporting fees of urban infrastructure, such as dormitories and office buildings.

3. The supporting fee for urban infrastructure of tourism projects is charged at 50%, and supporting facilities such as dormitories and office buildings built during the period of 65438+ 10, 20 1, 65438+February 3 1 in 2009 are not exempted.

(3) Financial incentives

1. Newly-established enterprises will be given financial rewards from the date of tax payment (according to the years specified in these Measures, the same below). Before 65438+February 3, 20081,the enterprise will be rewarded with 100% of the financial contribution of the enterprise to the city level (equivalent to the value-added tax, business tax and enterprise income tax retained by the enterprise at the city level, the same below) as a development fund (enjoy for no more than 2 years); In June, 2009, 5438+1 October1June1February, 65438+3 1, 50% of the financial contribution of enterprises will be rewarded as a development fund (the enjoyment time will not exceed 3 years).

2. Projects (enterprises) established in the form of lease (factory buildings) will not enjoy financial rewards temporarily during the lease production and operation; Enterprises to buy land or plant and put into operation (opening), the new project (enterprise) to enjoy preferential financial incentives, financial incentives to be cashed during the lease period, included in the preferential period to enjoy financial incentives.

3. Tourism projects shall be taxed from the date of opening, and 80% of the financial contribution of the enterprise to the city level shall be used as the development fund before February 3, 2008 (the enjoyment time shall not exceed 2 years); From June 5438+1 October1to February 3 1, 20 1 in 2009, 40% of the financial contribution of enterprises to the city level will be rewarded as a development fund (the enjoyment time will not exceed 3 years).

(4) Handling procedures

1, fee waiver procedures. After the project invests in land purchase, when going through the relevant formalities, apply to the Municipal Investment Service Center for fee reduction and exemption. Based on the project construction, the Municipal Investment Service Center shall go through the formalities for examination and declaration of fee reduction and exemption.

2, financial incentive bidding process. Newly-established enterprises should go through the formalities of enterprise tax filing at the municipal investment service center on the day of tax payment, and apply for financial incentives one year later. City investment service center in conjunction with the Municipal Finance Bureau audit, reported to the municipal government for approval.

3, the project investment intensity and construction period, by the municipal investment service center in conjunction with the Municipal Bureau of land and Housing Management, Planning Bureau, Municipal Construction Bureau and other relevant departments responsible for the audit; If the project is not built and completed according to the requirements of investment intensity and construction period, the amount of fee to be reduced or exempted shall be paid (the detailed implementation rules shall be formulated separately by the Municipal Planning Bureau and other relevant departments and shall be responsible for the implementation).

(5) Investment services

1, the municipal investment service center is responsible for the coordination of relevant departments involved in the project, the cumulative statistics of project progress, the review of relevant policies such as fee reduction and financial incentives, and the acceptance of complaints about investment projects in the preparation process.

2. The financial reward for the development fund of the enterprise and the bonus for the project introducer shall be included in the annual budget by the municipal finance every year, and a certain amount of special funds shall be arranged. The municipal investment service center shall apply to the municipal finance for direct payment to the enterprise and project introducer according to the approval of the municipal government.

Financial incentive funds are paid by the municipal finance, and then settled and shared by the municipal finance according to the financial management system of the town (street) and the park according to the principle of "who benefits and rewards".

3, the implementation of municipal leadership responsibility system for key projects, to determine the person to coordinate, follow up the implementation, to achieve "special affairs", "urgent".

4. All functional departments should coordinate and help investors solve problems in the process of construction, production and operation in time, mediate contradictions and disputes in time, and supervise the implementation of the contract.

5. Encourage and support enterprises to introduce talents. Newly-established enterprises introduce and recruit all kinds of senior professionals, giving priority to their households (including their families) and children's enrollment (the application is submitted by the enterprise, and the Municipal Investment Service Center will review it with relevant departments and report it to the municipal government for approval). (a) to meet the preferential policies of the introduction of projects, according to the introduction of the project in the first year of the financial contribution of the city level 5% to give a one-time reward to the introducer, the maximum not more than 500 thousand yuan.

(two) the procedures, calculation methods and payment methods of investment incentives.

1. The project introducer shall apply to the Municipal Investment Service Center within 3 months from the date of signing the import contract of the project or enterprise (including the project invested and constructed by the leased plant), and fill in the Approval Form for Investment Introducers in Conghua City as required (the applicant must sign it himself).

2, the city investment service center after receiving the application materials for review, submitted to the municipal government for approval.

3. After the enterprise has been completed and put into operation (opened for business) for one year, the municipal investment service center will take the lead, in conjunction with the Municipal Finance Bureau and other relevant departments, determine the tax amount of the introduced project and the retained part of the municipal finance, and calculate the amount of investment promotion incentives.