Responsibilities of civil budget officer 1
1, responsible for preparing the budget, settlement and quantity analysis of engineering construction drawings, editing and reviewing engineering subcontracting and service layer settlement;
2. Prepare the monthly project progress budget and material adjustment (according to the market price provided by the material engineer) and report it to relevant departments for approval in time;
3, audit the subcontract, labor layer of the project progress budget (approved by the technician workload);
4. Assist the financial department in cost accounting;
5. Adjust the budget in time according to the on-site visa and changes.
6, in the project bidding stage, timely and accurate budgeting, provide the basis for quotation;
7, grasp the accurate market price and budget price, timely adjust the budget and settlement;
8. Provide timely prices for the work content of the labor service layer as the basis for decision-making;
9. Participate in the tender documents, tender preparation and contract review, collect the project cost data, and provide the basis for bidding;
10, establish unit project budget, settlement and progress report ledger, and fill in relevant reports.
Responsibilities of Civil Budget Officer 2
1) can independently complete the budget work, and be familiar with the budget method, bidding process and related contract management;
2) Be responsible for the preparation and review of the company's project budget and final accounts, and participate in the project bidding activities;
3) Participate in contract business preparation, negotiation and contract formulation of the project;
4) Participate in the on-site visa in the process of engineering construction, grasp the progress of the construction site in time, find problems and control costs;
5) Responsible for the establishment of infrastructure project files and the management of engineering data.
Responsibilities of civil budget officer 3
1, responsible for design budget, construction drawing budget, bidding documents and engineering quantity calculation;
2. Project settlement audit and financial audit;
3. Draft and manage contract documents, track and analyze the implementation of the contract, and review relevant clauses;
4. Change negotiation, review and handle claims;
5. Writing of the consultation report.
Responsibilities of civil budget officials 4
1, responsible for the pre-settlement of the company's engineering projects, bidding and contract-related work;
2. Prepare the subcontractor's bidding documents and contracts;
3. Be responsible for the design change and visa approval within the corresponding authority during the project construction;
4. Conduct inquiry investigation on relevant materials and equipment, and provide pricing basis for department managers;
5. Be familiar with the construction drawings, attend the blue prints.the design, and review the visa and change documents uploaded by the project department.
6, the preparation of project completion settlement documents, audit, management companies and other units to check;
7. Cooperate with other departments to complete other tasks assigned by the leaders.
Responsibilities of civil budget officials 5
1, responsible for preparing the budget, settlement and quantity analysis of engineering construction drawings, editing and reviewing engineering subcontracting and service layer settlement;
2. Prepare the monthly project progress budget and material adjustment (according to the market price provided by the material engineer) and report it to relevant departments for approval in time;
3, audit the subcontract, labor layer of the project progress budget (approved by the technician workload);
4. Assist the financial department in cost accounting;
5. Adjust the budget in time according to the on-site visa and changes.
6, in the project bidding stage, timely and accurate budgeting, provide the basis for quotation;
7, grasp the accurate market price and budget price, timely adjust the budget and settlement;
8. Provide timely prices for the work content of the labor service layer as the basis for decision-making;
9. Participate in tender documents, tender preparation and contract review, collect cost information of various projects, and provide basis for bidding;
10, establish unit project budget, settlement and progress report ledger, and fill in relevant reports.
Responsibilities of civil budget officials 6
1, can be familiar with the national laws and regulations and the relevant provisions of the project cost, master the professional theoretical knowledge, be familiar with the engineering drawings, master the project budget quota and related policies and regulations, and lay the foundation for the correct preparation and audit of the budget.
2, responsible for the audit of construction drawings, to participate in the blue prints.the design and technical disclosure, according to its records for budget adjustment.
3. Assist in organizing bidding, examination and approval before commencement and acceptance after completion.
4. After the project is completed and accepted, the final accounts shall be made in time and sent to the audit department for audit.
5. Be responsible for the analysis of engineering materials, recheck the price difference of materials, collect and master the records of technical changes and material substitution, conduct cost accounting at any time, and provide scientific basis for leadership decision-making.
Responsibilities of civil budget officials 7
1. Be familiar with the calculation rules of quantities in the quota list, and be responsible for reviewing the budget bill of quantities and group pricing;
2. Independently draft relevant contracts according to the standard contract text;
3. Review the construction site project visa and progress payment;
4. Make various accounts such as contracts, visas and project funds;
5. Complete other tasks assigned by the leaders.
Related articles on the specific content of civil affairs budget staff's job responsibilities;
★ Job responsibilities of the latest project budgeter in 2020.
Taken the engineering budget member job responsibilities 2020 responsibilities daquan
★ Responsibilities and work contents of civil construction personnel
Taken the engineering budget member job responsibilities 2020 latest daquan
★ Seven job responsibilities of the project budgeter
★ Job responsibilities of the project budgeter
★ There are 7 selected model essays on the job responsibilities of project budgeters.
★ Job responsibilities of the project budgeter
★ Job responsibilities of the project budgeter
What professional skills should a construction project budgeter have? 1, college degree or above, graduated from civil engineering or related major, holding the employment certificate of budget officer.
2, to have the basic knowledge of architectural drawings, building structure and building structure.
3, understand the construction technology, general construction methods, engineering quality standards and safety technical knowledge.
4, understand the commonly used building materials, components, products and commonly used mechanical equipment.
5, to be familiar with the quota, understand the composition and charging standard of labor cost, material budget price and mechanical machine-team fee.
6. Be familiar with the calculation rules of quantities and master the calculation skills.
7, understand the laws and regulations of construction economy, familiar with the terms of the project contract, can participate in bidding, bidding and contract negotiation.
8. Have a basic knowledge of computer application, and be able to use computers to prepare construction budget.
The specific work contents of the construction project budgeter are as follows:
Master design budget and construction budget management first, that is, secondary calculation management. Specifically, prepare and compare the second calculation, and increase or decrease the budget for the received design changes, technical approval documents and materials.
Second, contract control, planning, drafting and starting the corresponding contract approval process for labor and professional contracting, and evaluating the performance of the contract.
Third, claim management. If the owner fails to perform or fails to perform the obligations stipulated in the contract correctly, causing losses to the construction party, the construction party shall claim compensation from the owner and draft the claim documents.
Fourth, the project settlement, according to the completion data of settlement book, determine the final cost of the project.
At present, the budget officer's salary is about 2500~4000 yuan per month.
It includes civil budget officer and installation budget officer, but now it has been renamed as cost officer. The five members of the building are: the builder, the budget officer, the material officer, the safety officer and the quality inspector. Among these five members, it is best to be a budget officer, and the salary is higher.
Which is better, the power budget officer or the civil budget officer?
There are few separate hydropower installation contracts, so the prospect of civil budget staff is better, and the salary of civil budget staff is higher than that of electric budget staff, so the civil budget staff is good.
Budgeting staff refers to the detailed or rough statistics of the most basic labor, materials, machinery and other expenses completed by a project, including taxes, profits and so on.
Responsibilities of civil affairs budgeter 7. Civil affairs budgeter needs to handle and review project completion settlement, claims, etc. According to as-built drawings, changes, visas and other related information. The following are my responsibilities carefully collected as a civil budget official. I will share it with you and enjoy it together.
Responsibilities of civil budget officer 1
1, can independently complete the civil engineering budget. After the project is completed and accepted, the final accounts of the completed project can be carried out independently.
2, complete the economic analysis of the project cost, timely complete the project final accounts data archiving.
3. Be responsible for reviewing the construction drawings, participating in the blue prints.the design and technical disclosure, and making budget adjustment according to its records.
4. Assist leaders in project declaration, organize bidding, examination and approval before commencement and acceptance after completion.
5. Participate in the procurement of engineering materials and equipment, be responsible for the analysis of engineering materials, check the price difference of materials, collect and master the records of technical changes and material substitution, conduct cost accounting at any time, and provide scientific basis for leadership decision-making.
6, a comprehensive grasp of the terms of the construction contract, in-depth understanding of the construction situation, to lay a good foundation for the final accounts review.
7. Be able to review project engineering changes and visa information, and control unreasonable expenses.
Responsibilities of Civil Budget Officer 2
1, can independently complete the project owner visa change settlement and subcontracting settlement,
2. Skillfully use Guanglianda reinforcement, graphics software and pricing software.
Responsibilities of civil budget officer 3
1, responsible for the preparation of scientific research budget, budget estimate, construction drawing budget and settlement of the project;
2, audit project settlement, progress payment, settlement audit;
3, the preparation of project bidding list, tender offer;
4. Assist the financial department in cost accounting;
5. Adjust the budget in time according to the on-site visa and changes.
6, in the project bidding stage, timely and accurate budgeting, provide the basis for quotation;
7, grasp the accurate market price and budget price, timely adjust the budget and settlement;
8. Participate in the tender documents, tender preparation and contract review, collect the project cost data, and provide the basis for bidding;
Responsibilities of civil budget officials 4
1, cooperate with bidding inquiry and participate in bidding business;
2, participate in the project cost analysis, audit project labor settlement;
3. Collect and sort out relevant settlement data in time during construction as the basis of project settlement;
4. Review of process cost data: responsible for timely reviewing design changes, on-site visas, progress payments and various business letters;
5, according to the engineering drawings and related changes, visas and other information to prepare the project bidding, budget and settlement;
6. Complete other tasks assigned by the leaders on time.
Responsibilities of civil budget officials 5
1, responsible for the preparation of construction drawing budget.
Step 2 Apply for an on-site visa
3. declare installment payment
4. Subcontracting settlement.
5. Fill in relevant reports and ledgers.
6. Assist the leader to handle other related affairs.
Responsibilities of civil budget officials 6
1, responsible for organizing the preparation of construction drawing budget for development projects;
2. Review the completion settlement and audit of development projects;
3. Participate in project construction, materials and equipment bidding and investment control;
4, review the bidding activities and the terms of the contract;
5. Participate in the investigation and inquiry of materials and equipment, and check the procurement of raw materials;
6, review the design drawings, grasp the progress of the construction site, found the problem;
7. Constantly establish and improve the settlement system for the completion of construction projects.
Responsibilities of civil budget officials 7
1, responsible for the preparation of civil bidding quotation.
2, responsible for the construction budget, control the project cost price.
3. Responsible for budget negotiation, budget repair and settlement.
4. Be responsible for the actual cost accounting and settlement.
5. Be responsible for subcontracting budget, settlement and subcontracting management.
6. Be responsible for the filing and preservation of pre-budget, settlement book and related materials.
7. Collect and sort out market-related cost information in time and report to company leaders in time to provide reliable data for company leaders' decision-making.
Articles on the job responsibilities of civil budget staff;
★ Job responsibilities of the latest project budgeter in 2020.
★ Job description of on-site budgeter
Taken the engineering budget member job responsibilities 2020 responsibilities daquan
★ What are the responsibilities of the project budgeter?
Taken the engineering budget member job responsibilities 2020 latest daquan
★ Seven job responsibilities of the project budgeter
Taken the project budget member job responsibilities 2020 job responsibilities summary
★ Job responsibilities of the project budgeter
★ Job responsibilities of the project budgeter
Do civil budgeters need to look forward to being at the construction site for a long time? No need.
The civil budget officer is mainly engaged in the estimation, budget and final accounts of civil engineering, as well as other businesses in the construction economy, and his work runs through the whole process of building engineering from project approval to delivery. Engaged in this work requires professional study and work practice, in order to have a certain ability, to participate in the national qualification examination for budget personnel, and to work with certificates after passing the examination.
The main contents include: the concept of construction budget, the calculation of construction area, earthwork, pile foundation engineering, super-high construction cost, scaffolding cost, masonry engineering, concrete and reinforced concrete engineering, doors and windows engineering, floor engineering, roofing and waterproof engineering, decoration engineering, etc.
Extended data:
Requirements for civil budget staff:
1. The material consumption index specified in the budget quota is expressed in different physical or natural units of measurement, including net consumption and loss.
2, the machinery consumption index stipulated in the budget quota, with machine-team as the unit, including the basic number of machine-teams and mechanical amplitude difference.
3. The labor consumption indicators specified in the budget quota are expressed in working days, including basic labor, overtime labor, auxiliary labor and differential labor.
Baidu encyclopedia-civil budgeter
- Previous article:Hefei BOE recruits general workers
- Next article:How about Ganzhou Baoming Display Technology Co., Ltd.
- Related articles
- Are Xifeng Winery marketing staff regular employees?
- Paint recruitment
- Should girls give their parents living expenses every month after work?
- "Taobao Plane Model", working part-time in "58 City", let them take model samples and pay the production fee. Is it credible?
- Working hours of Vu Thang Jiezi Industrial Park factory
- Is there any difference between undergraduate and junior college programs at Dalian University of the Arts?
- Printing time of admission ticket for Panyu second-class auxiliary police recruitment
- Where can I get a welder's certificate in Hengshan County?
- The function of Ganzhou Ganfutong was re-optimized, and eight measures helped to resume work and production.
- The correct spelling of the word Tian Zige.