Job Recruitment Website - Job seeking and recruitment - What are the starting and ending points of G65 Baomao Expressway?
What are the starting and ending points of G65 Baomao Expressway?
Inner Mongolia Autonomous Region
G65 Baomao Expressway starts from Baotou City, Inner Mongolia, and passes through Ordos City to Sujiahe River (Mongolian-Shaanxi boundary) in Xinjie Town, Ejinhoro Banner, with a total length of 182.438+03 km. It consists of Bao (Tou) Dong (Sheng) Expressway and Dong (Sheng) Su (Jiahe) Expressway.
Baotou-Dongsheng section
Bao (Tou) Dong (Sheng) Expressway, built in 1998, was opened to traffic on June 18, 2002. The starting point is the junction of Baotou Jiuyuan Interchange and Danla National Highway, and the end point is Dongsheng Buli Beida Bridge, with a total length of102.75km (including Dongsheng Ring Road 65438).
Extended data:
The originally designed expressway runs through the urban area of Baotou and starts from the urban area, but the expressway is closed, which brings inconvenience to citizens. Therefore, some expressways and national highways 2 10 in the original urban area of Baotou do not belong to closed first-class highways.
Later, in order to relieve the pressure of Baotou section of Baomao Expressway, the Shaerqin Interchange Bridge was added at the eastern end of Baotou in the reconstruction and expansion project of 201/and the section from Hohhot to Baotou of Beijing-Tibet Expressway (G6), which led to a newly-built section connecting Guannianfang Village, Zhao Shulin Town, Dalat Banner, Ordos, so that from Beijing-Tibet Expressway to Ordos, you can directly enter Baomao Expressway, which saves trouble.
Therefore, the new starting point of Baomao Expressway should be Shaerqin Interchange. The reporter then contacted the Inner Mongolia Expressway Company and learned that the Inner Mongolia section of Baomao Expressway generally refers to the junction of Shaerqin and Mengshan.
August 20 16, the Development and Reform Commission of Inner Mongolia Autonomous Region approved the reconstruction and expansion project of Baotou-Dongsheng section of Baotou Expressway. The main line starts at the intersection of Baotou and Linshuzhao Guanfangran Interchange, connecting Baotou, Shaerqin and Fang Ran (Y Interchange), passes through Erzihao and Wan Li, and ends at Dongsheng Tingdinggai Hub Interchange (G 18 Interchange with Wurong Expressway).
This trunk line is 76 kilometers long. The standard construction of two-way eight-lane expressway is adopted, and the design speed is100 km/h. In addition, the project will also connect the completed Beijing-Tibet Expressway (the western end of Baotou City) with the Dongbao Expressway to be rebuilt and expanded. The total investment of the project is estimated to be 7.88 billion yuan, of which 65.438+0.067 billion yuan enjoys the central automobile purchase tax subsidy. It is planned to start construction on 20 16 and open to traffic on 20 19.
June 5438+065438+1October 65438+May 2020, the main line of the reconstruction and expansion project of Baotou-Dongsheng section of Baotou Expressway-Zhao Shulin-Dongsheng section of Dalaqi was successfully opened to traffic.
- Previous article:Is Guangzhou Deqing optical technology progressing well?
- Next article:How about Peixian COFCO Feed going to work?
- Related articles
- What's the difference between gunner's license and blasting license?
- When does Changfu in Caidian, Wuhan have a subway?
- Is it easy to enter Gemeng International?
- What is the area of Guangxi Normal University?
- How far is it from jiao mei zhen in Longhai City to Bakeng Village in Longhai City?
- Is Kunlun Digital Intelligence outsourced?
- How about Qingdao Lijun's housekeeping?
- Which is the best post-loan collection system?
- Anyang Hongqi Canal Airport Recommended Route Released
- Is Suqian Daliyuan Bread Factory off for six days?