Summary of technical work of electric power supervision specialty

Inadvertently, a piece of work is over. After this period of hard work, we have made greater progress in our continuous growth. Let's write a work summary for this year's work. So, do you know anything about job summary? The following is a summary of my professional technical work in electric power supervision, which is for reference only and I hope it will help you.

Summary of electric power supervision technology work 1 Looking back and looking forward to the future, I have the joy of this year's harvest and the eager expectation for the future. Happily, with the care and help of leaders and colleagues, I have earnestly studied and understood the corporate culture spirit of the company, guided by the company's service concept, and successfully completed my work and the tasks assigned by the leaders through my unremitting efforts; Hopefully, I deeply realize that there are still many shortcomings in the supervision work that need to be studied and improved. I will sum up my experience, reflect on my own shortcomings, improve my supervision business level and become a member of the company in the process of better and faster development. This year's supervision work is summarized as follows:

I. Personal annual main work contents and job responsibilities.

In the first half of 20xx, he mainly participated in the site supervision of soft foundation treatment project in the central business district of xx development zone, and in the second half of 20xx, he mainly participated in the site supervision of artificial beach project in xx tourist resort. In this year's work, I obey the arrangement of the leader and earnestly perform my duties. During my work, I have never relaxed and strengthened my study of theory and practice, and have been strict with myself, serving the construction unit earnestly and enthusiastically, abiding by the requirements of the supervision contract, and performing the supervision duties in strict accordance with the supervision norms and procedures. In the process of construction, the process control of each working procedure is carried out by means of standing by, patrolling and parallel inspection. Investigate and study the quality and safety problems existing in the site, find out the root causes of the problems, ask the construction party to take effective solutions to solve them, and follow up and supervise the construction party to implement rectification throughout the process to prevent similar problems from happening again.

For materials (high strength geogrid, geotextile, fence board, presser foot block, stepping stone, etc.). ) approach, the relevant inspection data submitted by the construction party shall be inspected according to the standards and design requirements, and the appearance quality of the materials shall be inspected when entering the site. If the appearance quality does not meet the requirements, it shall not be used in the project. For the construction of key parts of the project, arrive at the station in advance, check the construction preparation work, and make a written record of the station in time and completely. Acceptance of concealed works shall be carried out in strict accordance with the acceptance specifications. If the acceptance is unqualified, rectification should be carried out, and the next working procedure can only be carried out until it is qualified. Inform the project management department of the construction unit of the problems found in the inspection in the construction process orally or in writing, and report to the director in time to urge the construction unit to carry out rectification and re-inspection. Try your best to do a good job of supervision in the construction stage of the project.

Second, the experience and feelings at work

In the process of supervision work, through the study of supervision theory and the cognition of the development state of supervision industry at this stage, I deeply realize that as a supervisor, taking the initiative to think about the interests of the construction unit, being responsible for the quality of the project and the safety of the construction personnel is the belief and infinite strength of supervision work. Only with high professional skills, comprehensive quality and good professional ethics can we really do a good job in supervision and embody the practice principles of law-abiding, honesty, justice and fairness. Understand the importance of supervision work, establish a correct attitude towards supervision work, deal with various problems in construction with a realistic attitude, so as to effectively carry out work, actively use their professional skills and intelligence, scientifically and fairly exercise supervision rights and obligations, cooperate with the construction unit, meet the requirements of the construction unit, and provide quality and efficient services for the owners.

Three. Future work plan and personal career development advice

As a young supervision worker, I love my job, have a good work style and hard-working spirit, and my work attitude is strictly prohibited. I like to study the causes and solutions of problems in engineering supervision, and I am keen on accumulating solutions to engineering problems.

In the future work, we should conscientiously perform our post responsibilities, strictly follow the national standards, and carry out supervision work based on design drawings. In the work, we should constantly reflect on our own shortcomings, strengthen the study of supervision business, constantly improve our own quality, do a good job in supervision, strengthen the study of management theory knowledge, handle practical problems flexibly, conscientiously complete all the work assigned by leaders, and strive to raise our professional and technical level to a new level and truly become a qualified supervisor.

Four. Comments and suggestions on departments/companies

1. It is suggested that the company conduct targeted professional training for different employees and recruit more talents with professional qualification certificates who can work independently;

2. It is suggested that the company organize talents with good public relations skills and set up relevant departments to deal with the socialization of supervision industry and the openness and complexity of supervision bidding.

Verb (abbreviation of verb) conclusion

The concern and support of company leaders and comfortable working conditions have given me the motivation to work hard. The warm care and cooperation of my colleagues make me feel comfortable and practical in my work, and the unique corporate culture atmosphere of the company makes me full of confidence in my work. I firmly believe that I can do better in my future work and contribute to the development of the company.

Summary of professional technical work of electric power supervision: I was hired to work in xx supervision company on xx, xx, 20xx, and was arranged to supervise electric power engineering and cable TV network engineering at the construction site. After nearly a year's work, with the help of company leaders and colleagues, the corresponding supervision tasks have been successfully completed in the past year, which has been recognized and praised by the owners and contractors. In the supervision work, I work hard, dare not be tired, work carefully, and have a good professional ethics and a strong sense of responsibility. Now, I will report my work and management experience in the past year as follows:

I. Work situation

Just arrived at the construction site, in a different place, but faced with objective unfavorable factors such as large supervision tasks, wide supervision area and few supervision personnel. So I did encounter some difficulties in the actual supervision work. I didn't flinch in the face of difficulties, and I made progress despite all the difficulties. In practical work, I actively communicate with the owners and contractors to coordinate various relationships, so as to carry out supervision work as soon as possible, and take the time to familiarize myself with the construction drawings and related design instructions. In the shortest possible time,

In the actual supervision work, I require the construction unit to implement total quality management, establish and improve the quality assurance system, and make reports on commencement, construction measures, technical disclosure, positioning review, material and equipment inspection, concealed works, quality inspection, special inspection and completion data.

In the aspect of engineering quality control, we should combine active control with passive control, actively carry out supervision work, and focus on prevention. Review the contractor's qualification, focusing on the enterprise registration certificate and technical level, submitting relevant documents (copies), understanding the general situation of technical force, main building installation experience, etc. , and check the supply of sand, stone, cement, steel and the mixture ratio of concrete and mortar.

According to the characteristics of the project and the key parts that affect the quality of the project, review the construction organization design submitted by the contractor, put forward improvement suggestions in view of its shortcomings, and check the original vouchers, test reports and other quality certification documents of the purchased materials.

Control in advance to ensure that engineering quality accidents do not occur or occur less. Such as winter construction, low temperature, concrete pouring, masonry, wall plastering and other quality problems. It is not easy to guarantee. Therefore, the construction unit is required to provide a winter construction plan to prevent in advance and avoid freezing injury.

For important engineering parts and subdivisional works prone to quality problems, quality pre-inspection measures shall be formulated. For example, in the construction of cable pipe laying in power engineering, manhole is the key part of the project, which involves many processes such as wall masonry, formwork, steel bar binding, concrete pouring and so on. Once neglected, it may cause engineering quality accidents, especially the manhole on the motorway. Once quality problems occur, the consequences will be serious, so in this part of the construction, strengthen monitoring. Take on-site supervision measures, strictly supervise the construction of all parts, put forward the factors affecting the construction quality in advance, and require the construction unit to prepare preventive measures and construction plans, so as to ensure the construction quality of inspection wells.

Strengthen process control. During the construction process, xx Construction Team found that the red bricks used by the team had quality problems. Although the contractor has the quality inspection report of the laboratory, in the attitude of being responsible to the owner, the batch of red bricks is sampled by parallel inspection in time, and the construction unit is allowed to use it only after all the strength indexes are determined to meet the design requirements. There are also quality problems in concrete pouring, masonry and wall plastering. In order to ensure the construction quality, I issued a supervision notice in time, requiring the construction unit to repair the defective parts to meet the quality standards required by the design and specifications.

In the supervision work, the construction unit is required to lay the cable pipe according to the design content, design requirements and construction acceptance specifications, and after construction, it is required to cover the soil and tamp it in layers to ensure the quality of the road above the trench.

In the construction of each working procedure, the construction unit is required to strictly implement the national and local construction and installation quality inspection system, check and confirm the relevant construction quality statements submitted by the construction unit in time, and review and sign the completed project quantities declared by the contractor according to the design documents and the provisions on the calculation of quantities in the contract.

Supervision record is an indispensable part of engineering supervision. I have a complete and sufficient supervision diary, which records the relevant situation of the construction site every day in detail, providing a reliable basis for solving the dispute between the owner and the contractor fairly.

During the supervision of the two construction sites, I actively coordinated the relationship between various units to make them cooperate with each other and support each other, and do a good job of linking up to ensure the construction quality and progress.

Through the above work, I completed the laying and burying of underground cable pipes in two construction sites (this number is the length of the ditch), and made xx underground manholes with an investment of xx million yuan. In the CATV project, the underground upvc pipe is buried for xx meters (the number of times is the length of the ditch), and xx underground inspection wells are drilled, with an investment of xx million yuan.

One year's supervision has gained a lot, but there are also shortcomings. For example, I am a civil engineering major, and I don't know much about the professional knowledge of electric power engineering, and I am not familiar with some process requirements. However, the supervision industry requires supervision engineers to have rich knowledge in many disciplines and industries. Therefore, I need to continue to study hard in various disciplines and constantly improve my business ability and professional level.

Second, some suggestions.

1, strictly implement the supervision procedures.

At present, the on-site supervision work is not completely carried out in accordance with the supervision procedures, such as design disclosure, joint review of drawings, first site meeting, introduction of supervision engineers and supervision contents to owners and contractors, formulation of supervision plans and supervision details, etc. , leading to the supervision engineer to the scene after no one cares, do not know the scope of supervision and how to supervise and other practical problems. In order to avoid the recurrence of such problems in the future supervision work, it is necessary to strictly implement the project construction supervision procedures so that the supervision engineer can clearly supervise.

2. Improve the organization of the project supervision department.

Project supervision institutions are fully staffed, with clear responsibilities of chief supervision engineers, professional supervision engineers and supervisors, and complete communication and transportation facilities. Due to the long route and wide area of municipal engineering supervision, only convenient transportation can ensure the inspection and on-site supervision of each construction section, so that there will be no mistakes in the supervision work and the quality of the supervision work will satisfy the owner.

3, training supervision personnel, improve the quality of all staff.

Strengthen the training of supervisors, organize employees to seriously study the Supervision Code and the Supervision Code for Municipal Local Engineering Construction, unify supervision standards, participate in various classes organized by the Municipal Construction Committee and the Quality Supervision Station, master new policies and standards, and lay a good foundation for supervision work.

The above is a summary of my supervision work in the past year. Because of the short working hours in the company, some problems may be one-sided, and there are still many shortcomings in the work. Please correct me in my future work.

Summary of technical work of electric power supervision specialty. After accepting the supervision task of the company, I entered the construction site on 20xx, x, x, and as a supervision engineer, under the direct leadership of the director, I overcame difficulties and carried out my work in combination with the engineering practice. Based on the principles of law-abiding, fairness, science and honesty, I strictly follow the supervision policy of "three controls, three pipes and one cooperation" for the construction unit, combine supervision with help, enthusiastically serve the construction unit, and earnestly carry out the professional supervision of this project. Facing the end of the year, I will summarize my specific work as follows:

First, the attitude and understanding of supervision work

Transmission line engineering is a special product with great value and long service life, which will be completed and put into use in 20xx years. It is related to people's life and property safety, health and environment. Therefore, ensuring the quality and safety of construction projects has become a very important issue. Because our supervisors are professionals with skills, management skills, economy and law, our supervisors will play an important role in ensuring the quality and safety of construction projects through excellent supervision and management of contracted construction units. Therefore, if our supervisors think that the project construction does not meet the engineering design, engineering quality standards and quality requirements, they should report to the director in time. And timely issue rectification notice to the construction party to ensure the quality of the project. Must strictly abide by GB503 19-2000 national standards for engineering supervision; From the supervisor's arrival at the construction site to the completion and acceptance of the project, the work should be carried out in accordance with the professional standards of "law-abiding, honesty, fairness and science"; Seriously study GB50303—20xx Code for Acceptance of Construction Quality of Building Electrical Engineering, GB50 168-92, GB50 169-20xx national standards and specifications, etc. At work, I can study the relevant norms seriously, which has played a positive role in carrying out professional supervision work.

Second, be familiar with the drawings carefully, review the construction drawing design, and do a good job in the preparatory work for supervision.

In the past three months, I have been able to control the quality, progress and safety during the construction process, abide by the rules and regulations formulated by the company during the work process, and obey the direct leadership of Director X and the normal work arrangement of Team Leader X; In case of drawing contradictions and new problems in engineering construction, carefully consult documents such as historical changes; Communicate and coordinate with the construction unit, and cooperate with each other.

Third, strictly abide by the guidelines and norms of supervision work.

In line with the principles of law-abiding, fairness, science and good faith, the principle of "three controls, two controls and one coordination" is implemented for the construction unit. Strengthen the supervision of construction units and do a good job in dynamic control. The construction area of Group II of Area C Supervision in Phase III of xx is about xx million square meters. Adhere to the guiding ideology of quality first, prevention first, process control and terminal control, abide by professional ethics, maintain the image of the supervision company, strictly supervise the construction unit, combine supervision with help, and serve the construction unit enthusiastically. Quality control includes the following points:

1, quality control. Do a good job in setting quality control points in construction.

(1) For key parts or weak links, it is generally necessary to analyze the causes of problems that may cause quality in advance, and then formulate pre-control countermeasures according to the causes;

(2) Key working procedures or links in construction, concealed works, parts or links for replacing new materials, difficult working procedures or links, and difficult construction conditions or technologies;

(3) Control of construction personnel. In supervision, we should focus on controlling and supervising unqualified, undocumented, low-level and unresponsive construction workers; The quality of building materials, because it directly affects the quality and safety of the project, should focus on its quality and performance control. (For example, when the temperature is low in winter, PVC pipes are easy to break, and so on. When casting the board surface, electricians are strongly required to stand by and supervise. )

2, the contracting construction unit to do a good job of technical control. This is one of the conditions to ensure the construction quality, therefore, disclosure should be made before each subdivisional work starts.

(1) Strictly control the inspection of materials, finished products, semi-finished products and components to prevent unqualified products from being used in the project;

(2) Review the technical disclosure information of the construction unit, understand the on-site disclosure situation, avoid disconnection, and master the dynamics of the construction unit. Xx Project Department divides 20 buildings into 6 groups. In the process of construction, I noticed the differences in personnel quality, construction methods and construction quality of each team, and took targeted measures to improve the construction quality.

(3) Construction between examples: In order to reduce large-scale mistakes and rework, construction between examples plays an important role in regulating the behavior of construction units and construction quality. In the process of construction, each team adopts the method of starting between examples, and the control effect is good. Require all construction units and teams to make a set of model rooms on each building, and the installation work can be carried out in an all-round way only after passing the acceptance;

(4) In the construction, the method of combining on-site supervision, patrol and parallel inspection shall be adopted to strengthen the quality control of concealed works, important parts, key links and weak links to ensure foolproof. For the abnormal situation, carefully analyze, distinguish responsibilities, deal with it seriously, and communicate with the electrical supervision engineer xx in time for major problems.

3. Control of materials and components. All raw materials transported to the construction site shall submit the "Application Form for Engineering Materials/Components/Equipment" to the supervisor before entering the site, and the peers shall attach the factory certificate and technical specifications of the products. Before entering the site, the contractor's inspection report shall be checked as required, and our supervision engineer will check and confirm it.

4. Schedule control. The construction progress of xx project department is slower than that of xx project department, and the construction quality is poor. In this case, through the analysis of personnel, machinery and engineering quantity, the construction unit of Anda is reminded not to change people many times and increase advanced machinery (such as pipe bender, etc.). ), adopt the advanced experience of electrical installation in xx Department, and urge the construction unit to adjust personnel and machinery, which laid the foundation for ensuring the total construction period.

5. Acceptance of engineering construction quality. Acceptance of engineering construction quality is an important link in engineering construction quality control. GB50300-20XX "Unified Standard for Acceptance of Construction Quality of Building Engineering" must be implemented, which is the general criterion for acceptance specifications of various disciplines of building engineering.

6, lightning protection and grounding system installation. Part of the lightning protection zone and grounding device have insufficient lap length and are welded unilaterally. Installation requirements of lightning protection belt and grounding device: ① The lap length of flat steel shall not be less than twice its width, and it shall be welded on three sides. When the width of flat steel is different, the lap length should be wider; (2) The lap length of round steel shall not be less than 6 times of its diameter, and it shall be welded on both sides. When the diameters are different, the lap length with larger diameter shall prevail; (3) When the round steel is connected with the flat steel, its lap length should not be less than 6 times the diameter of the round steel, and it should be welded on both sides; (4) When welding flat steel and steel pipe, flat steel and angle steel, it should be close to the 3/4 surface of steel pipe or the outer two sides of angle steel, and the upper and lower sides should be welded; ⑤ In addition to the welded joints buried in concrete, other measures should be taken to prevent corrosion. Do not meet the above specifications, will not be accepted.

Fourth, deal with engineering quality problems in time.

For construction without drawing, construction without license, subcontracting for many times, inadequate construction management, unqualified raw materials used, oversized bad grooves and drilling holes, unqualified reserved holes, weakened load-bearing sections, etc., the supervision shall stop the construction in time after discovering it. If the circumstances are serious or you don't listen to the supervisor's verbal stop, the supervisor may issue a notice of temporary suspension. For the small quality problems in engineering construction, solve them in time during the inspection of the construction site and the acceptance of partial projects. For engineering quality defects that can be generally reworked or repaired, the contractor shall be instructed to write a quality problem report first, explain the situation and put forward treatment opinions. After verification and research by the supervision engineer, the treatment scheme shall be determined with the consent of the construction unit when necessary, and then the contractor shall reply to it for treatment, and then it shall be re-accepted.

Verb (abbreviation for verb) data collection and collation

Relevant information shall be collected in time during construction, so as to be complete and synchronized with the project, and meet the requirements of binding and filing upon completion.