Standard construction site engineering contract
As the spirit of the rule of law continues to develop, people are paying more and more attention to contracts, and contracts are used more and more widely. Contracts are signed to protect the interests of both parties and avoid unnecessary disputes. So, have you mastered the format of the contract? The following is a standard construction site project contract that I compiled. You are welcome to read it. I hope you will like it. Standard Construction Site Project Contract 1
Contractor: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
According to the "People's Republic of China **" *The Contract Law and Construction Law of the People's Republic of China and relevant laws and regulations. Party A and Party B follow the principles of equality, voluntariness, fairness and good faith, and regarding the weak current installation project of "Jiayu XX Hotel", this contract is signed after consensus reached by both parties. To comply with the regulations.
The first project overview
1. Project name: Jiayu XX Hotel weak current installation project
2. Project location: Dongling, ____ County, Hubei Province , Shangcheng Community
3. Contracting method: clear work, design, construction, installation and debugging, acceptance acceptance
4. Project scope and content: According to the provisions provided by Party A Party B is responsible for designing and organizing the construction of the decorative floor plans.
① Comprehensive wiring project: Comprehensive wiring project for the entire hotel security monitoring part, background music part, conference audio system, multi-function hall audio system, closed-circuit television system, patrol system, and telephone system.
② Monitoring system equipment installation and debugging project: all public parts of the hotel (elevators, walkways, lobbies, halls, etc.)
③ Hotel background music and broadcast system equipment Installation and commissioning projects.
④Equipment installation and commissioning project for the sound system of the banquet hall on the first floor and the sound system of the multi-functional hall on the third floor.
Equipment installation and debugging project of XX hotel’s closed-circuit television system.
⑥Equipment installation and debugging project of hotel security patrol system.
⑦Equipment installation and debugging project of the hotel’s network business system.
⑧The equipment installation and debugging engineering site for the hotel telephone XX system.
⑨If the construction team does not perform construction according to the specifications and requirements of Party A after entering the site, it will be cleared out of the site unconditionally, and Party B will be responsible for the losses caused.
Article 2 Project Period
1. The total construction period of this project contract is days (calendar days, calculated from the date of the start of the project), starting from _________year___month Construction started on ____ and was completed on ____, ____, month ____.
2. Party B shall reasonably arrange the installation and construction according to Party A’s requirements, and shall not delay the construction of other types of work. If Party A encounters difficult problems, Party A shall cooperate with Party B to solve them together. .
Article 3 Labor costs and after-sales service fees for weak current installation projects
Labor costs for the weak current installation projects are RMB: RMB 42,000 lump sum; (RMB 4.00) after-sales service fees are RMB: One hundred thousand yuan. The after-sales service fee will be retained by Party A as maintenance and warranty fees for the engineering equipment after completion and delivery. After the warranty period expires and maintenance fees are deducted, the balance will be refunded to Party B.
Article 4 Design and Construction Quality
Party B must implement in accordance with the current national "Design Standards for Four-Star Hotel Weak Current Equipment Installation, Integrated Wiring, and Commissioning Engineering Design". Construction is organized in accordance with the "Construction Specifications for Building Weak Current Installation and Commissioning Projects". The construction quality must meet the "Quality Acceptance Standards for Weak Current Installation Projects" stipulated by the country and the industry, and there are ports for connecting with elevators and public security 110 alarms, leaving room for equipment upgrades. During the construction process, construction personnel should be strictly required to operate according to specifications and absolutely obey the management and supervision of Party A's on-site construction management personnel and quality supervision units and departments.
Article 5: Receipt, storage and return of materials
Party B is responsible for helping Party A purchase domestic first-class equipment and related materials that meet the design intent to ensure the smooth progress of the project conduct. When Party B receives materials, it shall go through the approval and signature procedures. The materials received shall be kept by Party B. Before the concealed project is installed and sealed, Party A shall send personnel to check the actual amount of materials. If any materials are found to be missing, Party B shall be responsible for them. Compensation is required. If the material quality is found to be substandard, it should be returned to the warehouse for replacement immediately.
All construction materials are not allowed to be taken out of the construction site. If materials are found to be taken out of the construction site without approval, it will be regarded as theft and will be fined 500-1,000 yuan. In serious cases, they will be sent to the public security department for processing. The finished and semi-finished products that have been completed for a single project shall be jointly looked after by Party A and Party B.
Article 6 Safety Matters
Party B’s construction personnel shall abide by the construction site safety management system when entering the construction site, abide by the relevant public security management regulations of the construction site, establish the concept of safety first, and strictly abide by, Implementing the "National Safety Construction Operation Regulations" strictly prohibits illegal command and illegal operations. If Party B's personnel violate safety operating procedures and cause a safety accident, Party B will be responsible for all financial compensation and legal liability.
Article 7 Payment Methods
Ten working days after Party B enters the site for construction, Party A will pay Party B’s personnel living expenses appropriately. From now on, the application progress will be based on 75% of the monthly project progress. payment. Party B shall pay Party B's labor costs within three months after the completion and acceptance of the project (Party A's trial operation). The remaining after-sales service fee is 10,000 yuan, and the balance of the settlement of service and warranty fees will be refunded to Party B after ________ years. If quality problems are found during the warranty period, Party B shall repair them immediately after receiving Party A’s notification. If Party B cannot repair immediately, Party A can ask another party to repair the problem, and the cost will be deducted from Party B's after-sales service fee.
Other matters not covered in Article 8 shall be resolved through consultation between Party A and Party B.
Representative of Party A:
Representative of Party B:
_________year____month____standard construction site engineering contract 2
< p> Contract issuing party: Co., Ltd. (hereinafter referred to as Party AConstruction party: Suzhou Branch of Co., Ltd. (hereinafter referred to as Party B
) In order to clarify the role of Party A, B and C during the construction process rights, obligations and economic responsibilities, in accordance with the "Construction Law of the People's Republic of China", "Contract Law of the People's Republic of China" and relevant laws and regulations, and follow the principles of equality, voluntariness, fairness and good faith, Based on the specific conditions of this project, this contract was signed by consensus between both parties to ensure mutual compliance.
Article 1 Project Overview
Project name: Junyue Academy Project Phase II. Pile foundation project on the 14th and 15th floors
Project location: Southwest corner of the intersection of Jinhai 3rd Road and Yingbin Avenue, ____ City
Contracting method: contracting work, materials, quality, and quality This project is contracted through a package contract including installation, safety and acceptance.
Project contracting scope: all processes of pile foundation construction within the scope of the 14th and 15th floor pile foundation drawings.
< p> Article 2 Project Construction PeriodThe construction start date shall be subject to the construction start notice issued by Party A’s Engineering Department.
Article 3 Project Quality Standard< /p>
Party B carries out construction in strict accordance with the construction acceptance specification documents and engineering design drawings promulgated by the state. The quality of the project reaches the qualification level of the national or professional quality inspection and assessment standards. The qualification rate of the engineering piles is 100%. If the quality reaches If the prestressed concrete pipe piles are not qualified, Party B shall be responsible for all economic losses caused by this.
Article 4 Material Supply
Party B shall promptly prepare the prestressed concrete pipe piles. Notify Party A or Party A's representative to accept and sign the delivery note as the basis for payment of materials. At the same time, Party B shall provide Party A with the factory certificate of the product, the strength report of the concrete components and its summary table, and the testing of relevant materials. Reports and other relevant supporting materials shall also be carried out in accordance with the requirements stipulated by the construction materials quality supervision station where the project is located.
Article 5 Contract price and payment method
1. Project. Quantity and unit price
1. The project quantity is approximately: 8310 meters (the total number of piles in this project is 277, and the pile length is temporarily 30 meters.
2. Prestressed high-strength concrete pipe piles (C, using Xuzhou pipe piles, constructed by hammering method or static pressure method, C-500 (12
5AB-C80: Comprehensive The unit price is based on 194 yuan per meter; this comprehensive unit price includes material fees, labor fees, auxiliary fees, mechanical equipment fees, inspection fees, pile cutting fees, small machinery and accessories, temporary facilities fees, defect repair fees, pile delivery fees, material costs Transportation, decoration, stacking, collection, storage, secondary transportation fees, safe and civilized construction fees, environmental protection fees, rush measure fees, winter rainy season construction fees, night construction fees, water and electricity fees, losses, management fees, profits, taxes, and All responsibilities, obligations, cooperation fees, risk fees and other expenses related to the construction of the pile foundation project expressed or implied in the contract
3. The comprehensive unit price of the pile foundation project in this project does not include the pile foundation inspection fee. The pile foundation inspection fee is 100,000 yuan (lowercase: 100,000 yuan, which will be included in the completion settlement.
2. Payment method
1. There is no advance payment for this project
2. Payment for the project. After the pile foundation is successfully constructed and the construction is completed, Party A will pay 50% of the completed project within fifteen working days. The engineering piles have passed the static load and dynamic tests, the documents are complete, and they have been reviewed by the competent department. If the project is qualified, Party A will pay 95% of the settlement price after completion of the settlement, and the remaining 5% will be used as a warranty deposit. The remaining project payment (without interest) will be paid within ____ days after the project is completed, accepted, and delivered for use.
3 . When paying for the project, priority will be given to using a commercial house in Junyue Academy as the project payment.
Article 6 Completion acceptance and project information
1. After piling is completed, Party B shall make all preparations for completion acceptance as soon as possible and accept completion acceptance by Party A, the supervision unit and the construction authority at any time. Party B shall provide all project information to Party A within 3 calendar days after the excavation of the foundation pit.
2. Party B is responsible for the completion data, which shall be compiled in accordance with the relevant regulations of the quality supervision station under the jurisdiction of the location where the project is located, and must comply with the collation and scoring requirements of the archives management department where the project is located (not less than three copies, including the original One copy, two copies
Article 7 Responsibilities of both parties
1. Party A’s responsibilities
1. The construction site should be ensured before construction. Conditions, responsible for handling various documents and related procedures required for construction, providing Party B with engineering geological exploration reports and other information on the construction site, and being responsible for the authenticity and accuracy of the information.
2. Provide a copy of the drawings before construction, and organize a joint review of the drawings by Party B, the design unit, and the supervision unit, and provide a design explanation to Party B.
3. Submit the leveling points and coordinate control points to Party B in writing, and Conduct on-site inspections.
4. Coordinate and handle the protection of underground pipelines and adjacent buildings and structures around the construction site. Coordinate and handle the relationship between the masses around the construction site and solve the problem of obstruction of construction by the masses around the construction site. .
5. Party A notifies Party B of entering the site ____ days in advance
2. Party B’s responsibilities
1. Make all construction preparations according to the requirements of the construction drawings , and if during the construction process, the pile explodes or the pile body is broken due to improper construction, the resulting costs will be borne by Party B.
2. Obey the management of Party A and the supervision unit, always pay attention to the safety of the crew, and be responsible for all personal and In the event of mechanical or safety casualties, Party B shall bear all economic losses and legal liability.
3. Party B must unconditionally obey Party A’s unified management and arrangements of the construction site. If you enter the site according to the personnel, equipment, and entry date required by Party A, you will be fined 20 yuan for each day of delay, and you have the right to clear out the site depending on the project situation. Ensure the normal operation of the machinery, and organize the personnel and equipment in a reasonable manner, without affecting the normal construction of the project.
4. Party B shall organize construction in strict accordance with standards and regulations, accept inspections from Party A, supervisors and designated personnel at any time, and ensure quality. When the pipe piles processed by Party B are delivered to the construction site, Party B shall provide Party A with all relevant material certification materials such as the field certificate of the pipe piles, the strength report of the concrete components and its summary table, and the test report of the relevant materials. At the same time, It should be implemented in accordance with the requirements stipulated by the construction material quality supervision station where the project is located.
5. If the quality of the project fails to meet the acceptance standards, Party B shall repair it within the time required by Party A until it meets the acceptance standards. Party A has the right to refuse payment before the quality problems are resolved. Party B will be responsible for any resulting project losses and other costs. No responsibility will be paid for the quality and quantity of projects that have not been submitted for inspection.
6. Party B shall report the construction progress of prestressed concrete pipe piles every day according to Party A’s requirements.
7. Party B shall abide by national and industry laws, regulations and relevant requirements, accept supervision from all parties, prevent environmental damage, and continuously improve the construction environment.
8. During the pile foundation inspection, if there are unqualified piles, Party B needs to replace the piles and bear the corresponding costs. If the piles are over-delivered during construction due to Party B's fault, resulting in a deepening of the foundation or other foundation treatment costs, Party A, the supervision unit, and the construction unit will issue treatment opinions based on the design institute's opinions and design change orders, and notify them in the form of a visa. However, the expenses incurred shall be borne by Party B. If the reason is not Party B's, it will be handled by Party A, the supervision unit, and the construction unit's economic visa.
9. After Party B completes all the projects stipulated in the contract, Party B shall unconditionally leave the site within 3 days and promptly clean up the garbage and temporary facilities on the site, keep the project site clean, and shall not affect the next step of Party A's construction. Otherwise, Party B shall compensate Party A for all losses caused thereby.
Article 8 Intermediate Acceptance of Pile Foundation
1. Before the project is covered, Party B will notify immediately after self-inspection, such as pile welding quality, actual displacement before the pile is inserted into the soil, pile verticality, etc. Party A and the supervisory unit shall participate in the acceptance inspection, and construction can continue only after Party A's representatives and supervisors sign on the acceptance record. Party A's representatives and supervisors shall follow the construction supervision and management from side stations.
2. Party B must construct according to the design drawings. If the pile body breaks and the piles are repaired during the pile pressing process, Party B must notify Party A and the supervision unit before the pile foundation leaves the pile position, and keep According to the on-site status, if the piles are broken or exploded due to Party B's mechanical equipment or improper operation by workers, Party B will bear the pile fees for the exploded piles (if the pile deviation exceeds the specification range, all costs for changes will be borne by Party B. p>
Article 9 Liability for breach of contract
1. If Party B stops work without Party A’s permission, Party A has the right to terminate the contract. Party B shall unconditionally leave the site within ____ days. Both parties shall press 80% of the cost of the qualified project will be settled, and Party B will bear all losses caused by it.
2. The construction period is delayed or a major quality accident occurs, and Party B has no active measures to ensure that the construction is completed according to the contract period.
If it fails, or is unable to make repairs according to quality standards, Party A has the right to instruct Party B to stop construction and terminate the contract. All costs and losses arising from quality accidents, construction delays, etc. shall be borne by Party B, and Party A will pay directly from Party B.
3. If Party B starts work late, completes work late, or performs other obligations beyond the due date, it shall pay Party A a liquidated damages of RMB 5,000 for each ____ day overdue, up to _ On ___ day, Party A has the right to terminate the contract.
4. For project quality problems caused by Party B’s intentional or negligent materials and construction techniques that do not meet the technical specifications, regardless of whether the project has been accepted and delivered, Party A or the user shall have the right to claim compensation against Party B within two years from the date when Party A or the user becomes aware of it.
Article 10 Other Terms
1. All economic visas incurred in this project must be Submission must be completed within 3 days from the date of occurrence. Economic visas submitted after the deadline will be deemed invalid.
2. For matters not covered in this contract, Party A and Party B will enter into a supplementary contract if necessary. , after being signed and sealed, it has the same legal effect as this contract.
3. Disputes in this contract shall be resolved through negotiation. If the two parties cannot reach an agreement through negotiation, they shall be submitted to the people's court where the project is located for resolution.
4. This contract is made in three copies. Party A and Party B each hold three copies. This contract will take effect after being signed by the legal representatives or authorized agents of both parties and stamped with the official seals or special contract seals of both parties.
Party A (seal:
Party B (seal:
Authorized representative:
Authorized representative:
< p> Account opening bank:Account opening bank:
Account number:
Account number:
________year____month____ Japanese Standard Construction Site Engineering Contract 3
Contractor: (referred to as Party A)
Contractor: (referred to as Party B)
1. Project Name
2. Construction specifications
3. Contracting method
4. Construction period _________year____ day to ________year____month____ day (if the time is postponed due to weather conditions)
5. Unilateral cost and project quantity (the project quantity is settled based on the actual area)
6. Total project cost
7. Payment method:
8. Project quality and acceptance
9. Party A will assist in settling the accommodation and food for the construction personnel, and the construction personnel shall abide by the relevant regulations of Party A .
10. When the design is changed or the quantity of work is increased during construction, Party A and Party B shall negotiate and sign an extension contract.
11. Party A shall keep *** copies of this contract. It will take effect after Party B deposits the signature and seal of both parties. 12. Other matters
Anyone who changes the factory name or the invoice is inconsistent with the contract will be held legally responsible.
Party A (official seal): _________
Party B (official seal): _________
Legal representative (signature): _________
Legal representative (signature) ):_______
_______year____month____day
_________year____month____day
- Previous article:Is there Yonghui Supermarket in Xingan County?
- Next article:Chengdu has a clothing brand that Taiyuan does not have.
- Related articles
- Guizhou Zunyi China Unicom, how is the salary, and what is the difference between establishment and non-establishment?
- How long does it take for CNC gantry milling apprentices?
- Can my brother take an examination of career establishment in prison?
- I have never worked in real estate sales and would like to work in this field. I would like to ask if I can directly apply for first-hand housing sales. Is there a high chance of success?
- How to send work information in Rongcheng Information Port
- Is Lingshui R&F Ocean Paradise far away from Lingshui City?
- Development direction and employment situation of computer science and technology specialty
- Classification of hydropower stations? If it can be divided into energy storage and the like, be specific! Online, etc
- Summer heatstroke prevention and cooling work plan for welder workshop
- Top Ten Good Cars in China.