Commitment letter of engineering construction
Once we win the bid, we promise to use our own (or rented) equipment in the project construction, as follows:
The catalogue of self-supplied (or self-rented) equipment is as follows:
We make the following commitments to all problems caused by self-provided (or self-rented) equipment during the project:
First of all, our own (or rented) equipment must be qualified products and must meet the relevant national standards.
Technical quality standards and relevant national safety standards.
2. Before construction, we are responsible for providing the manufacturer's qualification, factory certificate, test report and other relevant documents of our own (or self-rented) equipment, such as providing the relevant qualification of the leasing unit and the lease contract or agreement of self-rented equipment; We are responsible for providing professional equipment operators with identity certificates, employment certificates and relevant certificates of equipment operation.
Three, own (or rented) equipment must be fully functional, complete accessories, can be used normally, trouble-free and potential safety hazards, and the safety protection facilities required by national or local regulations must be complete; Professional operators must be healthy and have no diseases or physical defects that can affect normal operation and use.
4. We are responsible for the coordination, transportation, installation, debugging and daily maintenance of our own (or rented) equipment.
Regular maintenance work, the use of equipment must meet the requirements of relevant national and local laws and regulations; We are responsible for educating the operators who bring their own (or rent) equipment about operating procedures and safety in production. Equipment safety operation regulations and safety production warning signs must be hung in the equipment use place. All expenses arising from the above work will be borne by us.
5. When using our own (or rented) equipment, we must meet the requirements of the mechanical equipment safety management system in the annex.
Commitment: (official seal)
Legal person (or customer):
Date, year and month
Commitment letter for project construction 2: * * * * * * * *
A, the construction quality commitment
1, in strict accordance with the quality standards, construction specifications, acceptance rules and construction design documents issued by the state and the Ministry of Information Industry. If there is any violation, our company will take the initiative to rectify and bear the rectification expenses.
2. According to the engineering quality evaluation standards jointly confirmed by both parties during the construction, we promise to ensure that the engineering quality reaches an excellent level at the time of acceptance. If the project fails to meet the acceptance criteria due to the quality of our construction, we promise to accept the corresponding punishment from your communication company, and unconditionally rework it for free until it meets the quality requirements agreed in the contract.
3. Willingly accept the supervision and guidance of your company. If your company puts forward rectification opinions on the project construction, we promise to send someone to review it on the same day and feedback the rectification opinions, and implement it immediately after confirmation.
Second, the personnel commitment
1, arranged to engage in communication professional work and network optimization work, with comprehensive theoretical knowledge of transmission network and rich network management personnel, focusing on coordination and engineering construction.
2. All construction personnel shall purchase social insurance and work-related injury insurance, so that the officially registered personnel can participate in the project construction, do not use affiliated teams, and do not subcontract or subcontract the construction project without permission, otherwise the employer has the right to terminate the contract, and the contractor shall bear the liability for breach of contract. Give informed criticism to the units that agree to be affiliated, and cancel the contracting qualification of related single projects.
3. Zhumadian City and Zhoukou City should have fixed offices, fixed hotlines, fax machines and desktop computers dedicated to maintenance, and someone must be on duty 24 hours a day. The person in charge must be equipped with a dedicated contact mobile phone, which is turned on 24 hours a day.
4, special operations personnel must hold a special operation certificate.
5, in the process of project implementation, don't change the project manager or technical director. If it is really necessary to replace it for special reasons, you should notify the relevant departments of your communication company in writing at least one month in advance, and you can replace it only after obtaining the consent of your communication company. The general principle is that the change of commitment personnel will not affect the quality of work and the implementation of processes and systems.
Three, safety and civilized construction commitment
1, safety construction commitment
Our company guarantees the purpose of safety first and prevention first, and guarantees "three noes" and "one innovation", which not only
No industrial accidents, no traffic accidents, put an end to serious injuries and create a civilized construction site.
Strictly abide by the construction safety operation rules, resolutely put an end to the occurrence of "three violations" (illegal command, illegal operation and violation of labor discipline) to ensure safe construction.
Our company guarantees to organize all construction personnel to study the construction safety system and safety operation procedures on a regular basis, strengthen safety management education, and constantly improve their understanding and consciousness, so that everyone can attach importance to safety and production safety, and the safety work can be truly implemented.
Our company promises to take construction safety measures for each construction link to eliminate hidden dangers of accidents and nip in the bud. In case of any safety accident during construction, our company will immediately report to the relevant departments, notify the supervision unit according to relevant regulations, and handle it according to the requirements of relevant government departments, and our company will bear all responsibilities.
2, safety protection measures commitment
Our company guarantees perfect safety facilities and complete safety equipment.
Do a good job in safety education and training to ensure that employees have the necessary knowledge of safety production, be familiar with relevant production rules and regulations and safety operation procedures, and master the safety operation skills of this position. Personnel without safety education and training, and those without Huawei's work permit are not allowed to work at their posts.
3, safety responsibility and civilized commitment
Our company is responsible for and solves all kinds of expenses such as accommodation, transportation and communication. Rectification of problems left over by its survey and construction personnel in the process of survey, project construction, project acceptance and handover.
Do all kinds of safety work well to ensure the safety, fire prevention, theft prevention and personal safety of various communication facilities during the maintenance period, and ensure the smooth maintenance and the safe and stable operation of the transmission network. At the same time, I am willing to sign a safety production management agreement with the selector.
Our company promises to take full responsibility for the construction safety, the life and property safety of the survey and construction personnel and the safety of the third party caused by the project construction during the construction period. Handle accident insurance for all survey and construction personnel entering the site, and mechanical equipment insurance and third-party liability insurance for mechanical equipment entering the site.
Commitment in the whole process of project construction, will not cause unnecessary interference to the interests of third parties and property infringement, occupation. And do a good job in propaganda, do a good job in the relationship with relevant departments, to ensure civilized construction.
Four. Commitment to data integrity, timeliness, accuracy and confidentiality
1. Ensure that relevant maintenance forms are filled in timely, accurately and truly, record maintenance data, process all kinds of original data in a timely, complete and accurate manner, generate corresponding reports, and submit true and accurate information and reports to the selector.
2. Strictly implement various confidentiality systems, ensure that all kinds of test records, original data and analysis reports and all kinds of sensitive materials are not spread to the outside world, safeguard the interests of the selection party, and strictly observe the business secrets of the selection party.
3. Ensure that all kinds of maintenance records, original data and analysis reports provided are true and reliable. If non-technical reasons and human factors are found to be untrue after verification, the company is willing to bear all the responsibilities it should bear.
Unit: * * * * * * * * * * * * * (seal)
Company address: * * * * * * * * * * * * *
Date: * * day of * * year.
Project construction commitment 3 I. Pre-sales service
1. Send a Commissioner to introduce the implementation standards of crane industry at home and abroad to users, introduce the product characteristics and general situation of our factory, and choose high quality for users.
Cheap products and provide decision-making materials.
2, technical solutions, send professional and technical personnel, business personnel for technical exchanges, business disclosure. You can organize your company's personnel to visit the factory for guidance. Provide product performance, characteristics, scheme design drawings and various parameters in time before and after the whole bidding process, and actively cooperate with your company.
Choose a satisfactory product manufacturer. Even if our products are not selected due to other factors, our factory is willing to provide your company with technical consultation for this project, so that your company can purchase products with advanced technology, reasonable price and reliable performance.
Second, selling services.
1. In terms of technical design, our factory optimizes the design and strives for perfection. We work closely with the design institute and your company to ensure the smooth development of the design work, and actively listen to the requirements of on-site operators to improve the design. If the design institute needs to be changed and users have special needs, our factory will try its best to meet their requirements and try its best to coordinate the cooperative relationship with all parties.
2. Choose the best parts manufacturer in China, which not only meets the performance requirements, but also facilitates future maintenance and parts supply.
3. In the manufacturing process, we fully cooperate to arrange the work of drawing review, product supervision, inspection and acceptance, so that the products can be completed before shipment.
All the work can be carried out in an orderly way.
Third, after-sales service.
1. After the product is delivered to the user, our factory will send special personnel to open the box for inspection with relevant personnel of your company.
2. In the process of equipment installation and debugging, our factory sent senior engineers with rich field experience to the site to guide the installation and debugging free of charge to ensure the normal and smooth operation of the products.
3, free training crane drivers and crane maintenance personnel, and establish contact with maintenance personnel, in terms of maintenance and use, do long skills.
Surgical support. During the use of the crane in your company, it provides 24-hour maintenance to ensure the use requirements of users.
4. Supply spare parts in time to ensure customer satisfaction.
(1) timely reflect the needs of users;
(2) Provide products with high quality and low price, and ensure timely delivery;
(3) Strictly control product quality;
(4) Proper packaging to prevent omission and damage.
Person in charge of commitment unit:
Technical director:
Project construction commitment 4 1, quality assurance: We will carefully organize the construction according to the requirements of the national construction acceptance specification, strictly control the materials and construction quality, carefully construct and create a high-quality project to ensure that the project quality conforms to the Unified Standard for Acceptance of Construction Quality of Building Projects (GB50300-20xx), otherwise our company is willing to bear the corresponding responsibilities.
2. Time limit guarantee: according to the specific conditions of the project, detailed construction organization design and schedule plan are prepared, and advanced construction methods and technologies are adopted. Do it with sufficient manpower and full working face, and do not stop work during busy farming season and winter rainy season to ensure that the work is completed within XX calendar days.
3. Safe and civilized construction: carry out the construction according to the standard of safe and civilized construction site, and carry out the inspection item by item according to the safety and civilized construction inspection score table in the Standard for Safety Inspection of Building Construction (JGJ59-99), so as to reduce the construction noise and environmental pollution, ensure that no major safety accidents occur, and create a safe and civilized construction site that meets the standard.
4. Warranty period: The warranty period of this project shall be implemented in accordance with relevant national regulations. During the warranty period, our company will undertake all maintenance obligations free of charge; Outside the warranty period, our company only takes the cost of materials for the expenses incurred in the construction process. Within and outside the warranty period, our company will be on call if notified by the construction unit. After the project is completed, the project department will assign special personnel to work at the site for half a year, and set up a warranty team to be responsible for the maintenance and warranty work.
5. Return visit: After the project is delivered, our company will send special personnel to the construction unit for return visit on a regular basis. After receiving the notice from the personnel of the construction unit during use, we guarantee to be on call.
6. Advance payment: during the construction period, if the funds of the construction unit are not in place temporarily, we promise to continue the construction for one month without stopping work.
7. Our company will actively assist you in investment control, put forward reasonable suggestions, optimize the engineering design scheme, scientifically prepare the construction scheme and construction work instruction, reduce extra consumption, and help the owner realize the best combination of investment and benefit.
8. Our company fully agrees with the provisions of other substantive contents in the bidding documents.
Bidder (seal)
Legal representative or authorized representative (signature)
XXXX,XXXX,XX,XX
Project Construction Commitment 5 I. Project Quality Commitment
Ensure that the project quality after completion and acceptance reaches the current national standard "Code for Acceptance of Project Quality".
A, about the commitment to the construction period
According to the drawings and engineering facts provided by the construction unit, combined with the comprehensive strength of our company, we promise that the construction period will be xx calendar days.
Two. service promise
1. Organize the first quality return visit within three days after the project is delivered for use, guide the use, repair and maintenance of engineering equipment, and timely understand and guide the deficiencies in use. After half a year's use, I made a second full-service return visit. A year later, the third quality return visit was conducted to solicit customers' opinions.
2. Within one year after delivery, the construction unit will set up a perennial maintenance service team near the construction site, which will be on call. Any quality problems caused by the construction unit shall be guaranteed and replaced by the construction unit, leaving no hidden dangers.
3. Our company is equipped with a special product quality return visit car, which will pay a return visit in strict accordance with our company's social service commitment.
4. Service content: long-term consultation and preferential service. For the project with the expiration of the warranty period, we will provide high-quality and high-priced services, and the friendship will last forever after the project is completed. We will continue to keep in touch with users and provide engineering consulting services free of charge.
III. Commitment of Project Manager and Management
Ensure that the construction is organized according to the winning project manager and management personnel listed in the bidding documents, and ensure that the project manager and technical director are present.
Four, about the rainy season, busy farming season, legal holidays and labor security commitments.
Ensure that effective measures are taken during rainy season, busy farming season and magic weapon holidays to ensure sufficient labor force and not affect normal construction.
Verb (abbreviation of verb) promises to cooperate with the owner and supervision unit.
Ensure that we actively cooperate with the owner's supervision unit to jointly do a good job in project construction.
Company name:
Date:
Project Construction Commitment 6 Shanxi Mobile Changzhi Branch:
The "20xx China Mobile Shanxi Changzhi td Machine Room Sub-century Park Project" undertaken by our company is about to start, and our company will carry out safe and civilized construction according to the requirements of relevant national laws and regulations. In order to ensure the safe production of this construction project, our unit makes the following commitments:
1. Our unit will strictly follow the provisions of the Constitution and relevant laws and regulations, and implement it for workers.
Protection; And strictly implement various safety protection measures according to regulations; Put an end to illegal operations and ensure the safety of workers and equipment.
2. According to relevant regulations, provide workers with necessary construction safety supplies.
3. Our unit will take full responsibility for construction safety production and be responsible for everything that happens in the process of construction production.
Be responsible for all casualties, and compensate for economic losses and deal with the aftermath.
4. Our personnel must consciously abide by the rules and regulations of the construction unit and obey the safety guidance.
Ensure the safety of workers and equipment.
5. Formulate safety production measures, earnestly study and implement safety technical operation specifications, and do the following
Safe construction and standardized management.
6. Care and correct use of production equipment and safety protection devices (facilities).
7. Have the right to refuse illegal operation instructions and discourage others from illegal operation.
8. If unsafe conditions are found, report them in time and organize personnel to eliminate them quickly.
Signature (seal) of the person in charge of safety:
date month year
Project construction commitment Article 7 Our company is responsible for the project construction undertaken by our company in my name, and hereby promises as follows:
1. We will complete the project bidding, settlement, completion and all the work during the project warranty period, and bear all the expenses incurred during the period.
2. All expenses (including industrial accidents) incurred by us in the construction process shall be borne and repaid by us, and have nothing to do with your company.
We will never owe all expenses such as materials, machinery and equipment in the name of your company. If it happens, we will bear the economic and legal responsibilities (deducted from the deposit), which has nothing to do with your company.
We promise not to default the wages of migrant workers. In case of breach of contract, all legal, civil and economic responsibilities shall be borne by us, which has nothing to do with your company.
5. During the construction period, we were accused and punished by the owner and the administrative department for the quality, safety and civilized construction of the project, and we took full responsibility, which has nothing to do with your company.
6. We promise that there will be no safety accidents, otherwise all economic, civil and legal responsibilities will be borne by us, which has nothing to do with your company.
7. Consciously implement the company's safety instrument management measures. See attached table.
8. Voluntary implementation of the company's industrial injury insurance.
9. Voluntary performance of all terms and contents of the project cooperation agreement.
Commitment: attachment: 65438+ 0 copies of ID card.
Badian construction and installation co., ltd
Safety management agreement of electric power construction project
(SAQBl-4 Power Transmission and Transformation Project-Line and Substation Installation Services)
Project name:
Signing place:
Signing time: year month day
Letter of Commitment for Engineering Construction Article 8 In order to ensure the construction safety of indoor and outdoor decoration, door and window installation, railing installation and elevator installation in Phase I of * * * * *, Party B's construction contractor:
Solemnly promise to be responsible for the safety management within the scope of this project. The basic contents of the commitment are as follows:
First, promise the subcontractors that the construction personnel must wear safety helmets and safety ropes when entering the site. Wear a work card. Subcontractors shall not dismantle the safety protection facilities on the construction site without authorization. If demolition is required during construction, the subcontractors shall apply to the general contractor in advance, and the construction can be started only after the general contractor agrees, and the construction will be restored to its original state after completion, otherwise all safety accidents caused thereby shall be borne by the subcontractors.
Second, during the construction period, we promise to strictly meet the requirements of the general contractor on the site, clarify the safety responsibilities in accordance with relevant laws and regulations, do a good job in the construction organization design and technical disclosure of construction safety, and obey the daily management and inspection of relevant departments of the general contractor.
Third, promise to carry out safety education for the construction personnel of this unit, have a sound safety management system and training and education records, and ensure that the construction personnel do not violate the safety regulations of the general contractor and national laws and regulations, and obey the supervision of the general contractor at the scene.
4. Commit to civilized construction, ensure that there are no fire safety accidents and industrial accidents at the site, set up a person in charge of site safety, formulate strict safety measures, ensure safe and civilized construction, and ensure the safety of construction personnel, company and third party personnel and property. In case of any safety accidents or casualties caused by construction, the subcontractor promises to take full responsibility, which has nothing to do with the site general contractor.
5. Promise to provide employees with labor protection articles that meet national standards or industry standards, and supervise and educate them to wear and use them correctly according to regulations.
Six, commitment to construction personnel consciously abide by the safety management regulations of the site general contractor, once found security risks, must immediately and unconditionally rectification. When the safety supervisors of the general contracting unit find major unsafe factors, they have the right to ask the construction party to stop work and rectify at any time, and the construction party shall not continue to work illegally. The subcontractor must accept the inspection and supervision of the functional departments of the general contractor, and the subcontractor must resolutely rectify the problems in the "Notice of Rectification of Nonconformities" issued by the relevant departments of the general contractor. If subcontractors violate the relevant regulations, they must accept the fine of the general contractor.
Seven, commitment to subcontractors must bring their own watt-hour meter, designated by the general contractor wiring, meter reading records by the general contractor professional rear can use, such as mobile power supply must be approved by the general contractor electrician. Subcontractors should strengthen the protection of finished products of various sub-projects. If it is damaged, it must compensate for the loss and restore it to its original state. The subcontractor must complete the work and clean up the materials during the construction.
Eight. This letter of commitment is an effective document for the site general contractor to supervise the external construction safety. It is an annex to the contract and has legal effect. If the commitment party violates it, it shall be dealt with according to Article 4.
Nine. Security issues include but are not limited to the above. For matters not covered, refer to national laws and regulations and the terms of this undertaking.
This undertaking is made in triplicate. (The project department of the company holds one copy, the general contractor holds one copy and the contractor holds one copy. After the construction is completed, the contractor will take this letter of commitment as the settlement voucher. )
Contractor: ID number:
Person in charge of the site: ID number:
Date: Date:
- Related articles
- Treatment of Development Research Center and Institutions of Pinggu District People's Government
- Can Tik Tok send job advertisements and contact numbers?
- What is the basic sales salary of Qi Anxin in Wuhan?
- Does Zhou Dahei in Yangxian County have five insurances and one gold?
- What about Guangdong Tian Bo Information Technology Co., Ltd.?
- Does Xiaoyi need a tutor?
- Which bus should I take from the activity center of veteran cadres in Yunyan District of Guiyang to Jinyang Jinli Daxia?
- Where can I get English training in Da Lang?
- Can a house in Wanyuan Old Street Community in Dongba, Guangyuan be traded?
- How to get to RT Mart from Pizhou Oriental County by car?