What is the general budget quotation for glass curtain wall?

Rules for quota calculation: Volume (m) should be calculated for different wall thicknesses, and quantities such as brick beams and coping should be incorporated into the wall calculation.

List calculation rules: the height is calculated to the upper surface of the roof (if there is a concrete roof, it is calculated to the lower surface of the roof), and the fence column is incorporated into the fence volume.

Fence quantity = wall top pile

={[0.24×2.289(0. 126×0. 1250.063×0.0625)×2]×[(2820)×2-8.49]0.24×

0.125× 2× 2.163×18} m

= {[0.549360.0196875× 2 ]× 87.512.33604} m.

= (0.588735× 87.51'2.33604) m = 53.86m.

Apply basic quotas 4-37.

Number of door brick columns = 0.49× 0.49× 2.5× 2m =1.20m.

Apply basic quotas 4-43.

(2) Bill of Quantities:

Engineering quantity of fence = wall battlements

= {(0.24× 2.289 )× [(2820 )× 2-8.49] 0.24× 0.125× 2× 2.163×18} m.

=50.4 1m

Number of door brick columns = 0.49× 0.49× 2.5× 2m =1.20m.

For reference only.