What does the second phase of the Malaysia United Steel project include?

1. The planned production line, rods, and profile products will be built with an annual production capacity of approximately 2.6 million tons of steel billets, and a site is reserved for development to an annual production of 5 million tons of steel.

2. After the project is put into operation, the daily production of 2,200 tons of qualified pellets with a compressive strength of more than 2,000N can effectively improve the batching structure of the blast furnace of the 3.5 million tons United Steel Plant in the Mazhong Kuantan Industrial Park and solve the problem The problem is that its pellets need to be imported from abroad.