3 Samples of Rebar Labor Contract Templates

When an employer recruits employees, it needs to sign a reciprocal labor contract with the employees. The following are "3 samples of steel labor service contract templates" compiled by me for your reference only. You are welcome to read them. Chapter 1: Sample steel labor service contract sample

Party A: (hereinafter referred to as Party A)_______________

Party B: (hereinafter referred to as Party B)_______________

In order to strengthen the team Strengthen internal management work, enhance the sense of responsibility and importance of the contracting team, and ensure that the project quality and project progress meet the requirements of the owner and general contractor for on-site civilized construction and safety management. In accordance with the relevant provisions of the "Labor Law of the People's Republic of China" and the "Economic Contract Law", according to the actual situation of this project, and after consultation and agreement by both parties, this team responsibility system agreement for economy, safety, quality and progress is specially identified. .

1. Project name

____________________.

2. Quality and safety requirements

____________________.

3. Work content contracted by Party B

On-site binding, installation, placement of cement pads, on-site horizontal and vertical transportation, on-site cleaning, loading and unloading of steel on site, etc. All work contents, Start cleaning, clean each layer, monitor the steel bars for concrete pouring, and make plain concrete protective layer pads.

IV. Responsibilities of Party A

1. Ensure that the project payment for the current year’s project is settled with each team ___ days before the Spring Festival;

2. Press The standard living allowance is _____ yuan per person per month. If your monthly attendance is less than ___ days, you will not be entitled to full living expenses. Note: (New workers are required to provide ___ days of living expenses by themselves>.

3. In principle, the expenses during the busy farming season and the beginning of school will not be considered, but for particularly difficult cases, appropriate consideration can be given.

4. Party B’s living expenses must be signed by the on-site management personnel before they can be collected.

5. Party B’s responsibilities

1. Safety first, life first. Party B must strictly follow the construction and safety regulations during the construction process. Personnel entering the construction site must sign the "Safety Labor Agreement" and receive safety education. They must wear safety helmets and wear helmets when entering the construction site. You must wear a safety belt when entering a working area above ___ meters, so as not to harm others or be harmed by others. It is strictly prohibited to work under the influence of alcohol. Party B will be responsible for any consequences caused by falling objects from heights. Party A has the right to dismiss those who fail to correct their mistakes, and all labor will be settled at ___%. In case of any safety accidents caused by illegal command or operation, the parties will be responsible for all consequences, and financial penalties will be imposed on the parties involved.

2. All management personnel and construction personnel of Party B must obey the command and supervision of the project leader and management personnel appointed by Party A. Party B must carry out construction according to the drawing specifications and the project quality disclosure of Party A. Party B must carry out construction within the specified time. The loss of materials and labor costs caused by rework shall be borne by Party B until the task is completed within the specified period and the quality reaches the quality structural standard. Party A will be punished according to the relevant system, and the fine will be deducted from Party B's contracted project payment. Party A has the right to choose another construction project. Team. The amount of work completed by Party B shall be settled at ___% of the lump sum price, and the payment shall be settled at the end of the year.

3. Party B shall arrange the materials according to the construction progress, and notify Party A in advance. , the spare parts and tools required for steel bar installation must be collected from the warehouse and returned on time. If not returned on time, double the original price will be deducted.

4. Party B shall make arrangements according to Party A’s construction progress plan and plan well. There are sufficient construction personnel to meet the construction schedule requirements. During the construction period, Party B shall not delay the construction period for any reason given by the workers.

5. Party B’s construction personnel must strictly abide by Party A’s rules and regulations and obey Party A. The on-site management personnel shall be strictly managed and shall not engage in any illegal, disciplinary or irregular behavior. Unreasonable making, fighting, self-inflicted alcohol, gambling, theft, and damage to public property, construction machinery, etc. are strictly prohibited.

If the above violations occur, Party A has the right to select another subcontracting unit and impose penalties.

6. Party B shall send specialists to cooperate with Party A in the construction of the project in order to familiarize themselves with the structural dimensions of the project to avoid rework and errors. Party B shall not unilaterally terminate the agreement, stop construction or be passive and negligent without justifiable reasons. If Party B is unable to perform this Agreement due to any reason, Party B will be responsible for Party A's economic losses and all consequences. The amount of work completed by Party B will be settled by Party A at ___% of the _____ price.

7. Quality is the only criterion for the survival of an enterprise. Quality is life, and quality is reputation. Party B must carry out construction in accordance with Party A's quality disclosures. If Party B has ___ consecutive quality accidents during construction, Party A has the right to unilaterally terminate the contract and negotiate with Party B at _____% of the project quantity. Settlement.

8. Civilized construction: In order to ensure civilized construction on site in one step, cleaning work must be done before pouring.

9. The parts made by Party B are:

Columns, walls, roofs, beams, and slabs.

What we do is based on the team responsibility system. All project quantities are settled based on tonnage, and there is no spot work. All stirrups shall be cleaned by Party B from the processing factory to the required amount for use on the floor. The remaining materials shall be cleaned by Party B themselves to the processing factory and placed in a reasonable location. If Party B fails to clean them (or does not clean them), Party A will clean them according to the requirements of each floor. ___ Cleanup costs are deducted manually and deducted at settlement. Party A will send people to clean up.

6. Obey management and unified dispatch

Party B must obey the dispatch and command of the on-site management personnel appointed by Party A. Party A's management personnel have the right to reward and punish Party A and Party B's guaranteed unit price within ___ yuan/ton.

7. Guaranteed unit price

Basic price is _____ yuan, quality is _____ yuan, progress is _____, safety is _____, clearing is _____ yuan, total price _____ yuan. If an item fails to meet Party A's requirements, it will be deducted from the corresponding item. It will be settled at ___% when the project is completed and the balance is settled in one lump sum at the end of the year.

8. Consumption of raw materials

The original site materials must be used rationally. New materials entering the site must be approved by Party A’s management before they can be used. Tie wire must be used sparingly. No waste is allowed. Wasted ties will be punished at ___ times the cost price.

9. During the construction process

Party B must bear the cost of certificates during the project period.

10. On-site penalties

1. Failure to wear a safety helmet when entering the construction site will be fined ___ yuan per person each time, and a fine of ___ yuan/time will be imposed if a person does not wear a helmet.

2. Anyone who disobeys the command and dispatch of the on-site management personnel or promptly rectifies and cleans up will be fined _____ yuan each time. If the situation is serious and the attitude is bad, a fine of not more than _____ yuan will be imposed;

3. Anyone who drinks alcohol, fights or causes trouble will be fined _____ yuan each time, and the parties involved will be ordered to leave the venue immediately, and will be settled manually at a rate of ___%. In serious cases, they will be handed over to the public security organs for handling.

11. Termination of the Contract

During the construction process, if the quality progress fails to meet Party A’s requirements, the corresponding labor and technical forces must be voluntarily inspected within ___ days. If the adjustment is still ineffective after ___ days, Party A has the right to unilaterally terminate the contract, and the project volume will be settled at ___%.

12. Difficulties Solved

After the formal signing of this agreement, if Party B encounters difficulties during construction, Party A is responsible for assisting in solving them, but Party B shall not use any form or excuse to stop work. To blackmail Party A into solving the problem. At the same time, you are not allowed to leave the site midway for any reason. If the above events occur, the project volume will be settled at ___% and you will be kicked out of the site.

13. Benefits of the Contract

This agreement is based on the principles of equality and voluntariness. There is no fraud. Once signed, it will become legally effective.

14. Other matters

Matters not covered will be negotiated and drafted a supplementary agreement later.

15. Contract Retention

This agreement is made in ___ form___ copies. Party A and Party B each hold ___ copies, which shall become effective upon signature.

Party A: ____________ Party B: ____________

Signing date: _______________________ Chapter 2: Sample Steel Labor Service Contract Sample

Contract-issuing party: (hereinafter referred to as Party A) )____________

Contractor: (hereinafter referred to as Party B)____________

According to the mutual negotiation between Party A and Party B, Party A will divide the steel work in the residential building project it undertakes into separate projects. The construction is contracted to Party B in the form of a labor contract. This contract is signed with reference to the relevant economic and labor contract regulations, the national labor law and other relevant laws and regulations, and upon consensus reached by both parties.

Article 1 Project Overview

1. Project name: _______________

2. Project location: _______________

3. Project quantity: _____________________

Article 2 Contract Scope and Precautions

1. Construction Content

The entire process from foundation steel bars to project delivery (construction blueprint and technical description, project Within the scope of contact sheets, etc.) and the amount of warranty work occurring within the warranty period of the contract scope (excluding formwork, masonry, painting, roof waterproofing, water, electricity and heating installation, and tower crane driver wages, excluding temporary facility erection but including dismantling and material utilization).

2. Construction quality

Must meet national acceptance standards and pass acceptance. Strictly control project quality in accordance with the acceptance specifications of each sub-project to eliminate common quality problems. Pay special attention to the quality of the beam, slab and column steel bar binding work. Party B is fully responsible for all losses caused by rework due to construction quality issues.

3. Party A will organize materials in a timely manner according to Party B’s plans and requirements. In line with the principle of economy, Party B shall abide by professional ethics and is strictly prohibited from wasting materials as he pleases.

4. Actively cooperate with various types of work to reasonably arrange the labor force to ensure the construction period (control the construction period according to the overall progress), and work overtime when necessary.

5. Actively cooperate with the quality inspection work of the supervision and superior quality departments. The use of mortar king is strictly prohibited during construction.

Article 3 Safe and Civilized Construction

1. Party B shall abide by the relevant national regulations on safe and civilized production, implement Party A’s regulations on safe and civilized construction, strictly implement operating procedures, and store materials in an orderly manner. Follow the procedures and actively cooperate with various inspections by superior departments to achieve safe and civilized construction.

2. When entering the construction site, you must wear a safety helmet and wear a seat belt when working in high-altitude dangerous areas without safety protection. If there is any violation, Party B will be responsible for the fines incurred. Party B will be responsible for the settlement at the time of settlement. Deduct the corresponding amount.

3. All safety casualties that occur due to illegal command and illegal operations during construction shall be the responsibility of the offending party.

4. It is strictly prohibited to work while drunk. Violators will be asked to leave.

5. Party B should manage its workers well, especially when conflicts intensify and fights occur, they should stop and deal with them quickly. Fighting is strictly prohibited on the construction site. If any occurs, it will be handed over to the police station for handling. Party B will bear all responsibilities and a fine of _____ yuan will be imposed on Party B. In addition, no one is allowed to take away any property on the construction site at will. Anyone found taking or preparing to take property on the construction site without permission will be deemed as stealing and will be fined ___ times the value of the stolen property (minimum no more than ___ times the value of the stolen property). less than _____ yuan), Party B’s salary will be directly deducted if the party’s salary is insufficient and the penalty is imposed.

6. Special reminder: Party A is not responsible for any safety accidents outside the construction site. Each of you must take care of your own transportation vehicle. Party A is not responsible for any loss or damage.

Article 4 Wage Price and Payment Ratio

1. Calculation of area: (fixed area lump sum) Settlement based on unit area × number of households, that is, _____㎡×____households = ____㎡.

2. Price calculation: calculated as ____㎡×____yuan/㎡.

3. Settlement ratio:

Payment will be made in batches according to the progress (completion time of the last building), with ___% of the total price (approximately ____ yuan) as the payment base .

The basic completion payment will be ____ yuan.

During the main period, ____ million yuan will be paid after the structure of each floor (four buildings) is completed.

After the main body is completed and passed the acceptance inspection, ____ million yuan will be paid.

If the work can be completed before the Spring Festival, the salary will be paid to ___%, and the balance will be settled after settlement (or the two parties will negotiate separately). If the project spans a new year, the salary before the Spring Festival will be paid to ___% of the actual progress. Wages will be paid according to this clause after work resumes in the coming year.

Article 5 Liability for breach of contract

The defaulting party shall be fully responsible for any economic losses caused by the liability of the breaching party. Party B shall be liable for any economic losses caused by the breach of contract due to quality, safety and other issues. ) fines and compulsory termination, Party B shall bear the economic losses and terminate the contract. Party A shall pay Party B's salary at ___% of the actual progress.

Article 6: Unfinished matters can be resolved through negotiation between the two parties, and the agreement can be supplemented. Separately sign a production safety contract

This contract is made in ___ copies, Party A has ___ copies, Party B has ___ copies, and Party A Company has ___ copies, and shall become effective upon signature.

Party A: ____________ Party B: ____________

____year___month___day____year___month___day Chapter 3: Rebar labor services Sample Contract Template

Party A: ___________________

Party B: ___________________

After friendly negotiation between Party A and Party B, Party A _______________ the steel bar production and installation project. Party B is entrusted with the construction in the form of contract work. In order to clarify the responsibilities and obligations of both parties, in compliance with relevant national laws and regulations, this agreement is signed on the basis of equality and mutual benefit, and both parties will abide by it during the construction process.

1. Contract scope, work content and requirements

1. Contract scope: all steel sub-projects within the scope of the construction drawings (including design changes, wall tie bars, piles Straightening of head steel bars, fabrication and installation of basement roof and roof steel mesh, and embedded steel bars for cantilevered outer frames).

2. Work content: On-site horizontal and vertical transportation, unloading and straightening of steel bars within the scope of the contract, copying, processing, production and installation according to construction drawings and specifications. Thread rolling installation and production and all other processes. Party B shall provide a copy of the steel bar sample copy to Party A in a timely manner.

3. Project quality: The production and installation must be carried out in strict accordance with the construction drawings, design documents, construction specifications and operating procedures, meet the requirements of the construction acceptance specifications, and the quality level of the steel bar sub-projects must reach excellent.

2. Contracting method, unit price and settlement payment method

1. Contracting method: Party B contracts in the form of labor contract, and Party B must bring its own steel processing and production machinery (iron breaking machine, Straightening machines, bending machines, thread rolling machines, electric welding machines and other mechanical equipment and tools related to steel bar production (with connected cables), operating tools, wire binding for steel bar installation and all electric welding required for connecting steel bars. strip. All installation drawings require construction. Short steel bar heads of more than ___cm are not allowed for steel bars with a diameter of more than ___. Any violation will be punished. Reinforcement bars are provided by Party A, and Party B must save materials and not waste them. If Party B wastes materials or misunderstands the drawings and uses more materials, the relevant costs will be deducted from Party B's total bill.

2. Including wages, materials, machinery, tools, labor protection supplies, etc. in all terms of the contract scope, work content and contract method. There is a unit price for the installation of steel bars in the basement, group rooms and main building, calculated in yuan per ton, and Party B is responsible for the tax. The quantity is calculated based on Party A's actual incoming steel bar quantity combined with the number of sample copies. This unit price includes management fees, social insurance funds, labor insurance and welfare fees, freight, water outages, power outages, materials, machinery impact labor costs, holidays, night overtime, travel and busy farming, spring planting, double rush, and autumn harvest season wage subsidies and unforeseen expenses, etc.

3. Unit price for hourly labor: In addition to the scope of the contract and the work content, if Party A needs to arrange the work, the hourly labor incurred will be calculated as _____ yuan/working day, and will be arranged by the construction engineer and the project Approved by the manager and recognized by the general manager of the first general contracting engineering company.

4. Payment method: After the construction unit pays each month, Party A will make monthly payment based on ___% of Party B’s completed work, and deduct the loan fee. After the completion of all steel sub-projects, ___% will be paid at the end of the year. After completion acceptance, the final payment will be paid within the final settlement of the project payment.

5. The amount of various penalties will be directly deducted from Party B’s total contract amount.

3. Construction period requirements

1. Party B shall provide sufficient skilled operators to meet Party A’s construction progress requirements.

2. During the project start and construction process, if Party B fails to complete the construction tasks as planned, a penalty of _____ yuan will be deducted for each ___ day of delay.

4. Quality, safety and civilized construction management

1. The main structural requirements of this project are excellent. Party B must strictly follow the drawings, construction specifications and construction plans to carry out the construction. The steel bars are divided into items. The work must be excellent. The production, installation and binding of steel bars must comply with the construction quality acceptance specifications. For those that do not meet the requirements of the specifications, Party B must unconditionally rework them until they are qualified. The steel bars must be welded firmly and meet the requirements of the thread rolling acceptance specifications to prevent quality accidents.

2. All construction workers must be equipped with safety helmets (purchased by Party A and allocated to Party B at the actual price), safety belts, rain boots, raincoats, gloves, etc. During the construction process, Party B must ensure safety and be equipped with corresponding safety supplies. If there is a safety accident caused by Party B's illegal operation or its own reasons, Party B shall bear all responsibilities. However, Party A must ensure that the protection is in place. Party A will be responsible for any accidents caused by insufficient protection. If Party B does not have all the labor protection supplies, fails to wear a safety helmet as required, etc., a penalty of RMB ___ per person will be deducted for each occurrence.

3. Party B must abide by the regulations on civilized construction on site, and all materials must be piled up in centralized categories and marked with materials.

4. Party B must obey the command and dispatch of the project management personnel, and comply with Party A’s relevant safety, quality, security and other management regulations.

5. If the drawings are changed during the construction process, Party B must implement them unconditionally. If the installed steel bars are changed, Party A will recognize the actual costs incurred.

6. The person in charge of Party B shall participate in relevant meetings required by the project department, and _____ yuan will be deducted for each absence.

7. All teams must be united, friendly, and respectful to each other. If Party B’s personnel fight or cause trouble at the construction site, all economic expenses and criminal liability incurred shall be borne by Party B, and Party A shall not be held responsible. In addition, Party B will be punished according to the Public Security Management Regulations and will deduct _____ yuan each time based on the severity of the case.

5. Responsibilities of both parties

(1) Responsibilities of Party A

1. Responsible for conducting "three-level" safety education and compliance with laws and regulations for Party B's personnel entering the site , safety fire protection, social security and enterprise internal management system education.

2. Responsible for pre-construction and staged technical briefings, provide relevant technical information, and explain technical quality, safety, conservation and other measures to Party B.

3. Responsible for providing large machinery and tools necessary for construction. (Vertical transport machinery)

4. Assign a dedicated person to be responsible for the inspection, guidance and supervision of quality, safety, and on-site operations.

5. Responsible for providing necessary accommodation and safe electricity and lighting for Party B’s personnel.

6. Responsible for complying with the contract and paying project fees on time and on schedule.

(2) Party B’s Responsibilities

1. Party B must strictly follow Party A’s schedule and arrange for operators to enter the site. If there is a delay due to Party B’s reasons, Party B will be responsible for all economic losses. , Party A has the right to organize other personnel to carry out construction, and all costs and additional costs will be directly deducted from the workload completed by Party B.

2. The person in charge of Party B must live on site, be responsible for managing, organizing, coordinating and cooperating with Party A’s on-site work, and obey Party A’s on-site management requirements and various work instructions.

3. Party B must organize enough personnel to strengthen the management and care of the materials it brings in. Party B will be responsible for any loss or damage that occurs.

4. Party B’s personnel entering the site must hold legal documents for migrant workers, valid "ID cards", "family planning certificates", "work certificates", "employment certificates", etc., and apply for "temporary residence permit" or "temporary household registration" ”, you must bear the cost of applying for the certificate by yourself.

5. Party B must apply for corresponding social insurance for workers such as work-related injuries in accordance with the relevant national social insurance regulations, and Party B will pay the costs by itself.

6. Party B shall organize construction operations in accordance with Party A’s construction schedule and quality requirements, and comply with safety operating procedures and Party A’s relevant safety production management regulations, such as safety accidents caused by Party B’s material quality and construction operations that do not follow specifications. , all responsibilities shall be borne by Party B.

7. Unrelated persons (including family members) are not allowed to be brought to the site without permission, and they are not allowed to stay overnight. Violators will be punished according to relevant regulations on site.

8. All economic disputes between Party B and relevant units or personnel are the responsibility of Party B and have nothing to do with Party A.

9. Keep Party B’s dormitory clean and strictly prohibited from using open flames, electric stoves, etc.; do not start fires for cooking, and must eat in Party A’s canteen. If an open flame, electric stove or fire is used for cooking, once discovered, the corresponding items will be confiscated and the team will be fined _____ yuan per time.

10. Provide Party A with the identity cards and list of on-site personnel. Each time payment is made, a salary schedule must be prepared and signed by the team members. All accidents that occur to Party B's personnel outside working hours have nothing to do with Party A.

6. Performance of the Contract

If Party B fails to meet Party A’s requirements in terms of material supply, construction quality, and progress, or its own internal management is chaotic and unable to perform the agreement well, Party A has the right to unilaterally terminate the agreement, and Party B will fully compensate for any economic losses caused to Party A; wages will not be settled or paid, and materials, machinery and equipment brought by Party B as deposits will not be allowed to be used as deposits to compensate Party A. Party A’s losses shall belong to Party A.

7. Emergencies

During construction and during the performance of the agreement, Party B shall unconditionally comply with the suspension of work due to force majeure or reasons caused by the construction unit. or withdraw from the venue, Party A does not assume any financial responsibility.

8. Other matters

For matters not covered in the agreement, the two parties will negotiate and resolve them based on the principle of seeking truth from facts.

9. Contract retention

There are ___ copies of the agreement in ___ form, Party A holds ___ copies, and Party B holds ___ copies. The agreement shall take effect from the date of signature and seal, and shall automatically terminate upon payment of the project payment.

Representative of Party A: Representative of Party B:

Date: _____year___month___day_____year___month___day