Responsibilities of fire engineering builders

professional answer

Job responsibilities of the builder

The builder is the technical organization and management personnel at the grass-roots level. The main work content is to go deep into the construction site under the leadership of the project manager, assist in the construction supervision, check the engineering quantity together with the construction team, provide the specifications, models and arrival dates of materials needed in the construction site, do a good job in the acceptance visa and management of on-site materials, conduct the acceptance visa and engineering quantity visa for concealed works in time, assist the project manager in collecting, keeping and archiving the engineering data, and bear an important responsibility for the progress and cost of on-site construction.

The builder's job is to specifically solve the relationship between the construction organization design and the site at the construction site. The things in the organization design depend on the builder to supervise, measure, write the construction log, report the construction progress and quality, and deal with the site problems. It is the liaison between the engineering headquarters and the construction team.

Job responsibilities of the builder:

1. Work under the direct leadership of the project manager, implement the policy of safety first and prevention first, do a good job in safety precautions according to regulations, implement the safety work, ensure that safety must be emphasized in terms of efficiency, and safety must be paid attention to in production first.

second, be familiar with the construction drawings carefully, prepare various construction organization design schemes and construction safety, quality and technical schemes, and prepare the progress plans of individual projects, manpower and material resources plans and plans for machines, tools and equipment.

III. Compile and organize the staff to hold meetings and study on schedule, arrange reasonably, guide scientifically and successfully complete all construction tasks of this project.

4. Cooperate with the project manager and earnestly implement the terms of the Construction Contract for Construction Projects to ensure the smooth progress of the construction and safeguard the reputation and economic interests of the enterprise.

5. Prepare the implementation plan of civilized construction site, arrange, implement and create civilized construction site according to the site plan of the project construction site.

VI. Prepare the total project schedule and monthly schedule and the monthly schedule of each construction team.

VII. Do a good job in the cost accounting of sub-item general contracting (according to individual items and sub-items) separately and timely, and inform the management personnel of the contracting department of the accounting results in time, so as to improve the construction plan and scheme in time and strive for higher benefits.

VIII. Issue the construction task book and material quota requisition list to each team. Cooperate with the project manager

9. Supervise and urge the construction materials and equipment to enter the site on time and be in a qualified state to ensure the smooth progress of the project.

1. Attend the project completion inspection and be responsible for the intact protection of the project.

Xi. Reasonably allocate production factors and strictly organize construction to ensure the progress and quality of the project.

XII. Organize the acceptance of concealed works and participate in the quality evaluation of partial projects.

XIII. Participate in the blue prints.the design and the preparation of the project schedule.