Job Recruitment Website - Job information - Where will Jiaozuo 480 Power Plant be relocated?
Where will Jiaozuo 480 Power Plant be relocated?
Baidu map shows that Jiaozuo 480 Power Plant has moved to Qinbei Park, an industrial cluster in Qinyang City, Jiaozuo. Jiaozuo 480 Power Plant, namely Danhe Power Plant, is a combat readiness thermal power plant built in China during the Cold War. It is located in the depths of the mountains at the junction of Bo 'ai and Qinyang counties in Jiaozuo City. /kloc-0 started construction in August, 1968;/kloc-0 was connected to the grid for power generation in June, 1973, and stopped production in June, 2008. The power plant made great contributions to the national economic construction during the power shortage in 1970s and 1980s, and also trained many electric technicians.
A power plant, usually called a power station, is a facility that is responsible for converting the primary energy existing in nature into electric energy (that is, secondary energy).
- Related articles
- Bus Route of Futian District Legal Aid Center in Shenzhen
- What about Qingdao Xinyi Net Information Consulting Co., Ltd.?
- What is the role of the wine supplier in the mysterious winery?
- What towns are there in Jiangyin?
- Real five-axis machining center?
- Excuse me, what are the requirements for applying for the teacher qualification certificate of non-normal students in Heze Mudan District?
- What preparations do you need to make to find a job as a bank escort? . .
- Who is the best Chinese teacher in Dalian 39?
- Will Rushan Village in Pudong, Shanghai be relocated?
- Measures for the Recruitment of Public School Teachers in Pudong New Area in 2024