Job Recruitment Website - Job information - When will Wuhan Optics Valley Empty Rail be opened to traffic?

When will Wuhan Optics Valley Empty Rail be opened to traffic?

Wuhan key planning air track project is a key construction project of high-tech zone, which is expected to be put into use on 202 1. The specific opening time needs to wait for the official announcement, so what are the details of the empty track planning line station in Wuhan Optics Valley?

Overview of Wuhan Optical Valley Empty Rail Planning Line Station;

The empty track of Optics Valley is laid in a straight line along the north-south direction of the ecological corridor, starting from the left bank of Huashan Country Garden Eco-city, passing through Huashan River, Jiufeng Mountain, Optics Valley Central City, Comprehensive Insurance Zone, Longquan Mountain and China Garden, and ending in the surrounding area of Niu Shan Lake. The total length of the line is about 26.7 kilometers, with 6 stations 1 station, supporting rolling stock depot and parking lot1station. In accordance with the principle of overall planning and phased implementation, the first phase of the Optical Valley Empty Track Tourism Line Project (Jiufengshan Zoo-Longquan Mountain Scenic Area) started first, with a total length of 10.5 km and 6 stations 1 vehicle base. On the basis of the first-phase project, the second-phase project connects Yanxihu Lake and Yandong Lake in the north and Leopard Lake and Niu Shan Lake in the south.

Passenger and speed information:

In the early and recent years, Optics Valley empty rail vehicles were grouped into two groups, with a length of about 24 meters and a width of 2.5 meters, a maximum passenger capacity of about 220 people and a top speed of 60km/h, and were operated by GOA3 manned driverless technology.

Technical features:

In terms of vehicle technical characteristics, advanced permanent magnet traction technology is adopted to effectively reduce vehicle weight and traction energy consumption; Adopt green environmental protection and ecological energy-saving technologies such as lightweight body design and energy recovery to help achieve the goal of "peak carbon dioxide emission and carbon neutrality"; Adopt a number of system vibration reduction technologies such as high-speed rail air spring to improve the running stability of vehicles; The vehicle has a 270 viewing function, which can greatly improve the ride comfort and reflect the innovation, technology, wisdom and humanistic characteristics of Optics Valley.

When will Wuhan Optics Valley Air Track be opened to traffic? Management Committee of Donghu New Technology Development Zone: After verification by the trading company, the planned gas rail project is a key construction project in the high-tech zone, and it is expected to be put into use on 202 1. There are transfer conditions with the subway along the line. The planned Gaoxin Avenue can be interchanged with 1 1 Optical Valley Station 4, and Gaoxin No.2 Road and Gaoxin No.3 Road can be interchanged with the long-term planned subway line.

Commencement time: July 28th, 20021year, Guan Wei, Optics Valley, China announced that the mountains, water, forest, fields and empty tracks in the central ecological corridor of Optics Valley would be connected in series as the first phase of tourism supporting project, which has officially entered the construction stage this month.

Remarks: If there is the latest news of line opening in the future, it will be updated in time!

Transfer Law between Wuhan Optics Valley Empty Rail and Subway

The empty rail project is the first phase civil pile foundation embedded project, Jiufengshan Station-Longquanshan Station. There are interchange conditions with the subway along the project. It is planned that Gaoxin Avenue can be interchanged with Optical Valley Station 4 of Rail Transit 1 1 Line, and Gaoxin No.2 Road and Gaoxin No.3 Road can be interchanged with the long-term planned subway line.