Job Recruitment Website - Job information - Job responsibilities of engineering surveyor
Job responsibilities of engineering surveyor
In the progressive society, job responsibilities are used more and more, and job responsibilities are the basis of organizational assessment. How to formulate job responsibilities? The following is the job responsibilities of engineering surveyors that I sorted out for you, for reference only. Let's have a look.
Job responsibilities of engineering surveyors. Obey the work arrangement and complete the construction survey and setting-out task on time.
2, familiar with the construction drawings, according to the requirements of the relevant specifications and standards, the preparation of measurement scheme, ready to measure the required tools form.
3. When measuring, carefully install the adjustment instrument, make accurate readings, keep the records clean and tidy, and use the legal measurement unit.
4, familiar with the performance of the measuring instruments used, manage the weekly inspection of measuring instruments on time.
5, assist the construction foreman to do a good job of technical review of measurement.
Engineering surveyor 2 1 Job responsibilities, responsible for measuring product dimensions.
2, responsible for the maintenance of testing equipment.
3, responsible for the handling and analysis of quality anomalies, leading to solve.
4. Participation of new products.
5. Be responsible for training QC in quality and measuring dimension knowledge.
6. Assist superior leaders to deal with quality anomalies.
7. Complete the tasks assigned by the superior leaders.
Responsibilities of engineering surveyors 3 1. Use all kinds of measuring instruments and software, and calculate and draw through professional measuring software.
2. Analyze the measurement data, evaluate the measurement results, and prepare the analysis report.
3. Responsible for the weekly inspection and maintenance of measuring instruments, equipment and facilities.
4. Abide by the company's rules and regulations, and maintain good professional ethics and professionalism.
5. Carry out the national laws, regulations, standards, specifications, technical regulations and company management system related to construction engineering survey.
6, responsible for the company's earthwork survey and other acceptance measurement work.
7, responsible for the safety of their own surveying and mapping data, to ensure complete, nondestructive and timely filing.
8. Complete other tasks assigned by superior leaders.
Responsibilities of engineering surveyors 4 1. Assist the project engineer, work closely with the construction personnel, and timely and accurately complete all the survey work required for construction.
2. Take good care of measuring instruments, use them carefully, keep them properly, and proofread and maintain them in time.
3. Protect all survey marks during construction and correct them in time when problems are found.
4. Responsible for unprotected measuring instruments and measuring marks.
5, complete other work assigned by the leadership.
6. Sign a labor service contract.
Responsibilities of Engineering Surveyor Chapter 5 1. Adhere to the work style of seeking truth from facts, being serious and responsible, and being meticulous.
Two, learn all kinds of measurement techniques, rules and regulations, standards and regulations.
Third, understand the design intent before measurement, and learn and check the drawings. Understand the construction deployment, and make the survey and setting-out plan.
Four, in conjunction with the construction unit, supervision unit of red line pile survey control points on-site calibration (elevation and coordinates), traverse survey.
Five, in accordance with the provisions of the time to send the measuring instruments to the authoritative testing department for inspection and calibration.
Six, closely cooperate with the construction, make full preparations in advance, and formulate a feasible survey and setting-out plan synchronized with the construction.
Seven, in all stages of the whole construction and the main parts of the pay-off, line inspection work, as well as review the survey pay-off scheme and check the survey pay-off work and other aspects to strengthen the work, to avoid mistakes and rework.
Eight, the line inspection work should be active, and the line inspection work should start from the audit of the measuring and setting-out plan. Before the construction of each professional stage, preventive requirements should be put forward for measuring and setting out, so as to nip in the bud.
Nine, do a good job of checking the leveling points and accurately set the elevation.
Ten, do a good job of building settlement and displacement observation, record the observation results (form written data and curves and charts).
Eleven, do a good job of sorting out the measurement results. Mapping maps. Collection, collation, submission and storage of survey data. , to ensure the accuracy of all data.
Twelve, do a good job in the maintenance, maintenance, repair and storage of measuring instruments, and establish an instrument ledger.
Responsibilities of engineering surveyors 6 1. Check the drawings, understand the construction deployment, and make the survey and setting-out plan.
2, responsible for the positioning of the project pay-off. When measuring the plane position and elevation of pay-off buildings and structures, make original records and relevant construction measurement records.
3, division, unit project acceptance to do a good job of preview, assist technical director to do a good job of drawing the project completion figure.
4, daily inspection of measuring instruments, and is responsible for the annual inspection, make all kinds of measurement records, to ensure the accuracy of construction pay-off.
5, complete other work assigned by the leadership.
Job responsibilities of engineering surveyors are 7 1, and on-site monitoring points are completed according to the monitoring design of foundation pit support.
2. Regularly collect the data values of each monitoring element.
3, the office into the data sorting and report preparation.
4. Attend the engineering meeting held by the project department and report the deformation of foundation pit.
5. Complete other temporary surveying and mapping work.
Responsibilities of Engineering Surveyor 8 Photogrammetric Engineer Henan Modern Agricultural Big Data Industry Technology Research Institute Co., Ltd. Henan Modern Agricultural Big Data Industry Technology Research Institute Co., Ltd. Henan Agricultural Big Data Research Institute is like a boat, and modern agriculture is big.
Job responsibilities:
1, responsible for the correction and adjustment of remote sensing data;
2. Be responsible for geometric calibration and correction of satellite remote sensing images;
3, responsible for the accuracy correction of remote sensing image ground control points.
Qualifications:
1, master degree or above in photography and measurement, remote sensing and other related majors;
2. Master the core algorithms of photogrammetry technology, including calibration algorithm and difference algorithm;
3. Familiar with the whole technical process and standard of photogrammetry indoor and outdoor work, and be able to evaluate and control the quality of indoor and outdoor work;
4. Good python program development ability and algorithm implementation skills, familiar with development tools such as c++.
Job responsibilities of engineering surveyor 9 1. Under the leadership of the chief supervision engineer (deputy director), recheck the original design datum, datum line and datum elevation, and recheck the contractor's construction lofting according to the design drawings;
2. Participate in design disclosure and the blue prints.the design, and be responsible for site measurement and pile delivery;
3, check the contractor's measuring instrument model, staffing and organization, management rules and regulations, and review the employment certificate and qualification certificate of surveyors;
4. Supervise the contractor to check the datum data, corner points and leveling points in the construction setting-out;
5, review the contractor's survey data, review the contractor's survey results;
6, organize supervision to review the measurement of key parts, and sort out the measurement results;
7. Keep a measurement diary, collect, sort out and keep the daily measurement supervision data, establish an account and accept the inspection;
8. Be responsible for the custody, maintenance and regular appraisal of measuring instruments of the regulatory authorities;
9. Be responsible for checking the measurement work and indoor measurement data of the supervision team;
10, complete other work assigned by the chief supervision engineer (deputy director).
The job responsibilities of engineering surveyor 10 (1) guide the survey supervision work of the supervision team and be responsible for the concrete implementation of the survey supervision work, accept the instructions and tasks of the chief supervision engineer (the representative of the chief supervision engineer) and cooperate with the work of the supervision team.
(2) Responsible for compiling the detailed rules for the implementation of engineering survey supervision and implementing supervision in strict accordance with the detailed rules.
(3) Be familiar with the contract terms, technical specifications and design drawings, and conduct comprehensive supervision and control from the quality of measurement work. For the problems in construction, suggestions should be put forward in time according to the requirements of technical specifications, and the implementation report of survey supervision should be submitted to the chief supervision engineer irregularly or regularly (once a month), and major problems should be reported to the chief supervision engineer in time and asked for instructions. Record the survey supervision log.
(4) Check the metering work and its operation in the contractor's quality self-inspection system.
(5) Be responsible for reviewing the measurement results submitted by the contractor, checking and controlling the accuracy of the measurement, analyzing and studying various factors, and reporting the results to the director in time.
(6) urge the contractor to check and calibrate the measuring instruments; Check the survey lofting method to ensure the correctness of the results; Evaluate the part of unit project related to measurement quality, and provide the basis for measurement payment.
(7) Strictly carry out on-site supervision and check the construction quality of relevant measurement procedures, especially the engineering measurement of key parts; Supervise the contractor to carry out the instructions of the supervision engineer. Before the measurement results are submitted to the supervision engineer for review, the construction of the next procedure cannot be carried out.
(8) Responsible for the collection, summary and arrangement of survey supervision data. Participate in the preparation of monthly supervision report, project quality evaluation report and project supervision work summary.
(9) Cooperate with the supervision team, water supply and drainage supervision engineer, structural engineer and metrology engineer to review the engineering survey.
Responsibilities of Engineering Surveyor 1 1 Engineering Survey Engineer China Construction Third Division Second Construction Engineering Co., Ltd., China Construction Third Division Second Construction Engineering Co., Ltd., China Construction Third Division Second Construction, China Construction Third Division Second.
Description of responsibilities:
1. Prepare the measurement technical scheme;
2. Review the technical scheme of the outsourcing measurement team;
3. Engineering survey setting-out operation;
4. Settlement observation and measurement results disclosure;
5. Check and measure after construction;
6. Supervise the outsourcing measurement operation and recheck the measurement results;
7. Measurement records and data management;
8. Management of measuring instruments.
Requirements:
1. College degree or above, under the age of 35, with more than 3 years working experience in the same position;
2. CET-6 or above or have written and oral communication skills.
3. Hardworking and able to adapt to the high temperature working environment in the desert.
Job Responsibilities of Engineering Surveyor 12 Three-coordinate Precision Surveying Engineer Guangzhou Automobile Group Passenger Car Co., Ltd. Chuanqi Automobile
Description of responsibilities:
1, responsible for 2D and 3D dimension detection and analysis, and making measurement scheme.
2. Be responsible for judging the measurement data and making professional suggestions on the dimensional accuracy of the whole vehicle and parts.
3. Be responsible for verifying the accuracy and test requirements of the equipment, and give expert opinions on the dimension measurement.
4, responsible for the daily maintenance of measuring equipment, to ensure safe and efficient operation.
Requirements:
1, bachelor degree or above, 3-5 years measurement experience in automobile or manufacturing industry.
2, can identify mechanical drawings, understand three-dimensional modeling or reverse software.
3. Be able to measure the dimensions of products, molds and fixtures with three coordinates, analyze relevant data and issue relevant reports.
4. Understand the influence of measuring tools, measuring methods, measuring environment, measuring specifications and the actual situation of the workpiece on the measuring results, and make effective judgments on the problems in the measuring process.
5. Skilled in using office software, able to draw simple drawings with cad software, familiar with some mainstream CMM software, such as ac-dmic, pc- dmic, etc.
The job responsibilities of engineering surveyors 13 1, and the surveyors' understanding of the project itself, can choose a set of best schemes as guidance to make the construction survey task transparent.
2. After understanding the design intent, the surveyors will copy the main dimensions, key parts and structural practices of the drawings into the survey workbook to complete the first step of indoor work. It is forbidden to bring drawings to the site for site lofting.
3. After the indoor work is completed, if there are any problems with the drawings, submit them to the chief technical engineer, and then start construction after reaching a consensus with the design.
4. Before construction, hand in the piles together with the chief technical engineer, Party A's representative and the supervision unit, retest and verify the original points provided, and submit the data to the documenter for filing and reporting. If surveying and mapping institutes hand in piles, it is necessary to pay attention to whether to affix the official seal of their units. The original materials are kept by the librarian.
5. Strengthen and protect the original pile points handed over to us to ensure that they are not lost or damaged before the end of this construction.
6. The original pile point meets the needs of the construction pile point encryption work, so that the traverse and leveling systems are complete and independent. Approved by the supervisor's retest, and report the data to the documenter for collection and filing.
7. Measure the elevation of relevant structures or pipelines that we will hook or butt, and find out whether there is any conflict or inconsistency with the design drawings. Arrange the measurement data and submit it to the chief technical engineer.
8. Measure the construction red line and make a permanent mark.
9. Measure the present situation and topography of the construction scope, and provide first-hand information linked with the economy for the budget officer and technical chief engineer. These data should be submitted to the documenter and kept by the budget officer.
10. Before the overall construction is fully carried out, the application contents should be roughly sampled and explained in detail, and the geophysical map should be carefully read to determine all pipelines and obstacles, find representative places for setting out, organize excavation and pit exploration together with the construction personnel, draw the plane position and section elevation, and compare them with the pipeline and road structure in the design drawings, and hand over the conflicting places to the chief technical engineer. If there is no geophysical map, collect data and draw a comparison according to the current well location and distribution facilities. Finally, the measurement results are handed over to the chief technical engineer.
Job Responsibilities of Engineering Surveyor Article 14 Surveyor/Surveying Engineer Zhejiang Waihai Zhejiang Waihai Holding Group Co., Ltd. Job Responsibilities of Zhejiang Waihai and Waihai:
1. Prepare the technical scheme for water conservancy or municipal engineering survey and organize the technical disclosure of the survey scheme;
2. Responsible for organizing the project site measurement according to the construction progress and ensuring the accuracy;
3. Archive the measurement data and information in time.
Requirements:
1. College degree or above;
2. More than two years of experience in on-site measurement of engineering projects independently, familiar with the whole process management of water conservancy projects or municipal engineering construction;
3. Skillful use of measuring instruments such as level, total station and gps, with surveyor certificate is preferred;
4. According to the needs of the project, obey the deployment in the company area.
;
- Previous article:JDĄŁ The entry for COM failed. How to declare and send emails online?
- Next article:What unit does the newspaper belong to?
- Related articles
- Recruitment examination time of institutions in Inner Mongolia
- Annual work summary of individual associations
- Aeon business hours
- What about Xingtai Zhongbei Real Estate Development Co., Ltd.?
- What are the majors in Lulong Vocational School?
- How about Linyi Zhongzhi's overseas labor service?
- What does the executive director of event planning mainly do?
- Where can I find a cheaper bed in Xingyi?
- 10 sales self-growth plan for 2022
- How about the dismantling of Zhengzhou Gree New Energy?